,_
in O PublicService
-io Company of Colorado 2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211
$,U[cY80201-0840 n
(303) 571 -7511 September 30, 1985 Fort St. Vrain Unit No. 1 P-85337
') !f R@~~~M 0 Rf/
Regional Administrator Region IV U. S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, suite 1000 lk jl Of7 - 31985
{E Arlington, Texas 76011 j
y Attn: Mr. Dorwin R. Hunter m
Docket No. 50-267
SUBJECT:
Technical Specification LC0 4.4.1; Circulator Trip - Programed Feedwater Flow-Low
REFERENCE:
PSC Letter Dated June 21, 1985, Lee to Johnson (P-85214)
Dear Mr. Hunter:
i Public Service Company of Colorado (PSC) submitted proposed changes to the Fort St. Vrain (FSV) Technical Specifications for the Plant Protective System (PPS)
Instrumentation in a letter dated June 21, 1985, referenced above. The proposed changes were formatted to the Model Westinghouse Standard Technical Specifications. An Analysis Value was defined for each PPS parameter, then Allowable Values and Trip Setpoints were calculated through detailed analyses accounting for instrumentation error and drift.
As stated in the above reference, the helium circulator trip on programed feedwater fl ow-l ow, although a PPS input, was never included in the FSV ~ Technical Specifications.
PSC comitted to perform an analysis for this parameter using methodology consistent with the other PPS inputs and submit the revised Trip Setpoint and Allowable Value by October 1,1985.
In the interim, the existing
\\Ig Trip Setpoint was incorporated in the Technical Specification change
/ 'l request.
f ADOCK On a,
piy a DR PDR g
c
-. PSC contracted GA Technologies,.Inc. to perform the Analysis Value review and-to provide the Analysis Value documentation package.
The review will. not be completed by October 1, '1985..Therefore, PSC is
- requesting ~an extension to January 1, 1986 to submit the Programmed Feedwater'. Flow-Low Helium Circulator Allowable Value. and Trip Setpoint' toe.the FSV PPS Technical Specifications.
- Should you have any questions concerning this matter, please contact Mr.L M. H.. Holmes at (303) 571-8409.
Very truly yours, ly&'M e/3A H. L. Brey, Manager Nuclear Licensing and Fuels Division HLB /JS:pa-4 3