ML20133D738
| ML20133D738 | |
| Person / Time | |
|---|---|
| Site: | 07000139 |
| Issue date: | 12/30/1996 |
| From: | Abelquist E OAK RIDGE ASSOCIATED UNIVERSITIES |
| To: | Richard Turtil NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20133D740 | List: |
| References | |
| NUDOCS 9701100050 | |
| Download: ML20133D738 (1) | |
Text
fd-/3f n
ORISE OAK R l[K_.f lN 5 fi[U [F F O64 SC IE NCE AND E DUCAllON December 30,1996 Mr. Richard Turtil U.S. Nuclear Regulatory Commission Division of Waste Management - NMSS Two White Flint North T-7F21 11555 Rockville Pike Rockville, MD 20852 SUllJECT:
CONFIRMATORY SURVEY PLAN FOlt SURVEY UNITS 1 AND 2 IN INTERIOR OF llUILDING 2, ENGELilARD PLANT, PLAINVILLE, M ASSACilUSETTS (DOCKET NO 070-139; RFTA NO. 97-7)
Dear Mr. Turtil:
G Enclosed is the revised confirmatory survey plan for Survey Units I and 2 in the interior of Building 2 at the Engelhard plant in Plainville, Massachusetts. Your comments have been incorporated into the final plan. Attachment A of the document contains the spending plan for this project. If you have any questions, please direct them to me at (423) 576-3740 or Timothy J. Vitkus at (423) 576-5073.
Sincerely, c
, )
a W l^J
.P A r
Eric W. Abelquist Assistant Program Director Environmental Survey and Site Assessment Program EA:dka Enclosure hb cc:
R. Uleck, NRC/NMSS/TWFN 7F27 f
D. Tiktinsky, NRC/NMSS/TWFN 8A23 W. Beck, ORISE/ESS AP T. Vitkus, ORISE/ESSAP File /678 9701100050 961230 PDR ADOCK 07000139 C
pyg P O BOX 117, OAK RIDGE. TENNESSEE 37831-0117 Managed and operated by Oak Rudge Anaciated Universmes for the U S. Departrnent of Energy