ML20133D700

From kanterella
Jump to navigation Jump to search
Forwards Proposed Confirmatory Survey Plan for Survey Units 1 & 2 Interior of Building 2,Engelhard Plant,Plainville,Ma
ML20133D700
Person / Time
Site: 07000139
Issue date: 12/11/1996
From: Abelquist E
OAK RIDGE ASSOCIATED UNIVERSITIES
To: Richard Turtil
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20133D702 List:
References
NUDOCS 9701100035
Download: ML20133D700 (1)


Text

YO ~ /d f

.t ORISE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION December 11,1996 Mr. Richard Turtil U.S. Nuclear Regulatory Commission Division of Waste Management - NMSS Two White Flint North T-7F21 11555 Rockville Pike Rockville, MD 20852 i

SUBJECT:

PROPOSED CONFIRMATORY SURVEY PLAN FOR SURVEY UNITS 1 AND 2 IN INTERIOR OF BUILDING 2,

ENGELIIARD PLANT, J

PLAINVILLE, MASSACIlUSETTS (DOCKET NO. 070-139; RFTA NO. 97-7)

Dear Mr. Turtil:

Enclosed is the subject document for your review and comment. Comments you may have will be incorporated into the final plan. Attachment A of the document contains the spending plan for this project. Ifyou have any questions, please direct them to me at (423) 576-3740 or Timothy J. Vitkus at (423) 576-5073.

Sincerely, Eric W. Abelquist Assistant Program Director Environmental Survey and Site Assessment Program EA:dka Enclosure cc:

R. Uleck, NRC/NMSS/TWFN 7F27 i

D. Tiktinsky, NRC/NMSS/TWFN 8A23 W. Beck, ORISE/ESS AP

[m[ h /

T. Vitkus, ORISE/ESS AP File /678 9701100035 961211 PDR ADOCK 07000139 C v s, C

PDR s

,y y P O BOX 117. OAK RfDGE. TENNESSEE 37831-0117 Managed and operated by Ook Ridge Assocbled Universihes for the U.S. Department of Energy