Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000526/2006025 + (13:31:55, 12 December 2024)
- ML20133F299 + (13:31:55, 12 December 2024)
- ML20133F298 + (13:31:56, 12 December 2024)
- ML20133F293 + (13:31:57, 12 December 2024)
- ML20133F292 + (13:31:57, 12 December 2024)
- HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done + (13:31:58, 12 December 2024)
- ML20133F288 + (13:31:59, 12 December 2024)
- ML20133F287 + (13:32:00, 12 December 2024)
- ML20133F285 + (13:32:00, 12 December 2024)
- B11739, Forwards Addl Responses to NRC Questions Re Proof & Review Tech Specs + (13:32:01, 12 December 2024)
- ML20133F281 + (13:32:02, 12 December 2024)
- ML20133F278 + (13:32:02, 12 December 2024)
- ML20133F277 + (13:32:03, 12 December 2024)
- 05000277/LER-1985-010-02, :on 850629,initiation of ECCS & Diesel Generator Start Occurred W/Unit in Cold Shutdown.Caused by Inadvertent Reactor Low Level Signal.Use of Portable Backfilling Device Suspended + (13:32:05, 12 December 2024)
- ML20133F271 + (13:32:10, 12 December 2024)
- ML20133F269 + (13:32:10, 12 December 2024)
- ML20133F268 + (13:32:11, 12 December 2024)
- ML20133F261 + (13:32:12, 12 December 2024)
- ML20133F264 + (13:32:12, 12 December 2024)
- IR 05000321/1985012 + (13:32:13, 12 December 2024)
- ML20133F257 + (13:32:14, 12 December 2024)
- RBG-21797, Advises of Completion of Preoperational Testing Required by IE Bulletin 80-06,w/exception of post-accident Sampling Sys. Tests Verified Logic Will Resolve Concerns Raised in Bulletin.Logic Circuitry Will Be Tested W/Sampling Sys + (13:32:14, 12 December 2024)
- ML20133F253 + (13:32:15, 12 December 2024)
- ML20133F249 + (13:32:16, 12 December 2024)
- ML20133F250 + (13:32:16, 12 December 2024)
- ML20133F248 + (13:32:17, 12 December 2024)
- ML20133F246 + (13:32:18, 12 December 2024)
- ML20133F247 + (13:32:18, 12 December 2024)
- B11751, Advises That Required Submittal of Summary Technical Rept of Containment Bldg Leak Rate Test Delayed Until 851101 Due to Consideration of Implications of IE Info Notice 85-71, Containment Integrated Leak Rate Test + (13:32:19, 12 December 2024)
- RBG-21785, Notifies That Util Will Complete Installation of Fire Wrap for Spent Fuel Pool Cooling Sys No Later than 851031 + (13:32:19, 12 December 2024)
- ML20133F240 + (13:32:20, 12 December 2024)
- ML20133F236 + (13:32:21, 12 December 2024)
- ML20133F235 + (13:32:22, 12 December 2024)
- B11733, Rev to 850528 Application to Amend License DPR-65,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired.Determinations Re 10CFR50,App R Still Applicable + (13:32:23, 12 December 2024)
- ML20133F231 + (13:32:23, 12 December 2024)
- ML20133F229 + (13:32:24, 12 December 2024)
- ML20133F226 + (13:32:25, 12 December 2024)
- ML20133F228 + (13:32:25, 12 December 2024)
- IR 05000416/1996020 + (13:32:27, 12 December 2024)
- ML20133F222 + (13:32:30, 12 December 2024)
- ML20133F219 + (13:32:31, 12 December 2024)
- ML20133F221 + (13:32:31, 12 December 2024)
- IR 05000443/1985013 + (13:32:33, 12 December 2024)
- ML20133F217 + (13:32:33, 12 December 2024)
- ML20133F216 + (13:32:34, 12 December 2024)
- IR 05000341/1985029 + (13:32:35, 12 December 2024)
- ML20133F207 + (13:32:36, 12 December 2024)
- ML20133F206 + (13:32:37, 12 December 2024)
- ML20133F205 + (13:32:38, 12 December 2024)
- ML20133F203 + (13:32:40, 12 December 2024)
- U-602680, Submits Supplement to 960815 Application to Amend License NPF-62,requesting Rev to TS Re Safety Limit Minimum Critical Power Ratio Calculated by General Electric for Operating Cycle 7,in Response to NRC RAI + (13:32:41, 12 December 2024)