Forwards Insp Rept 50-416/96-20 on 961110-1221.No Violations Noted
ML20133F216
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/08/1997
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hagan J
ENTERGY OPERATIONS, INC.
Shared Package
ML20133F220 List:
References
NUDOCS 9701140108
Download: ML20133F216 (5)


See also: IR 05000416/1996020

Text

-

e

f""%,

UNITED STATES

t

,

I,t

NUCLEAR REGULATORY COMMISSION

7

REGION IV

..

o

.

g

0.,',+

611 RYAN PLAZA DRIVF, Su!TE 400

b, .... 4

AR LINGToN, TE XAS 76011 8064

V

JAN - 81997

J. J. Hagan, Vice President

Operations - Grand Gulf

Entergy Operations, Inc.

P.O. Box 756

Port GibsoniMississippi 39150

SUBJECT: NRC INSPECTION REPORT 50 416/96-20

Dear Mr. Hagan:

An NRC inspection was conducted November 10 through December 21,1996, at your

Grand Gulf Nuclear Station reactor facility. The enclosed report presents the scope and

results of that inspection.

During the 6-week period covered by this inspection period, your conduct of activities at

the Grand Gulf facility was generally characterized by safety-conscious operations, sound

engineering and maintenance practices, and careful radiological work controls,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

i

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

e

'

l

J. E. Dyer, Director

Division of Reactor Projects

Docxet No.: 50-416

License No.: NPF-29

Enclosure:

NRC Inspection Report

50-416/96-20

l

9701140108 970108

-.

PDR

ADOCK 05000416

G

PDR

1

,

,

..

. . _ _ . . _ _ _ _ . . .

_

. _ . _ . .._ _ _ _ _ _ ,. _ ._ _ _ . . . _ . _ . . . .

.

i

i

Entergy Operations, Inc.

-2

J

cc w/ enclosure:

Executive Vice President

and Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

l

Winston & Strawn

1400 L .c:treet, N.W. - 12th Floor

Washington, D.C. 20005-3F02

Sam Mabry, Director

Division of Solid Waste Management

Mississippi Department of Natural

'

Resources

P.O. Box.10385

l

Jackson, Mississippi 39209

l-

f

President

Claiborne County Board of Supervisors

Port Gibson, Mississippi 39150

Manager of Operations

l

Bechtel Power Corporation

l

P.O. Box 2166

L

Houston, Texas 77252-2166

General Manager .

]

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

j

!

The Honorable William'J. Guste, Jr.

l

l

.

Attorney General

i

Department of Justice

State of Louisiana

l

P.O. Box 94005

Baton Rouge, Louisiana 70804-9005

i

'

\\

i-

l

$

,

,.

,

- . - . .

.

l

.

Entergy Operations, Inc.

-3-

Office of the Governor

State of Mississippi

Jackson, Mississippi 39201

Mike Moore, Attorney General

Frank Spencer, Asst. Attorney General

State of Mississippi

P.O. Box 2P.947

Jackson, Mississippi 39225

Dr. F. E. Thompson, Jr.

State Health Officer

State Board of Health

P.O. Box 1700

Jackson, Mississippi 39205

Eddie S. Fuente, Director

State Liaison Officer

Division of Radiation Health

Mississippi Departrnent of Health

P.O. Box 1700

Jackson, Mississippi 39215-1700

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Director, Nuclear Safety

and Regulatory Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

)

Vice President, Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississ!ppi 39150

-

-

.

- . . _ . - . . - - . - - - . - . _ - - - _ . _ . _ . . .

. - - _ - - ...

. - - _.

- . - -

___- -

e

JAN - 81997

'

Entergy Operations, Inc.

-4-

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to R. Frahm (RKF)

E-Mail report to R. Correia (RPC)

bec to DMB (IE01)

bec distrib. by RIV:

L. J. Callan

Senior Resident inspector (River Bend)

DRP Director

DRS-PSB

)

Branch Chief (DRP/D)

MIS System

i

Project Engineer (DRP/D)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident inspector (Grand Gulf)

-

DOCUMENT NAME:

To receive copy of document. Indicate in box:," " = Copy without enclosures

"E" = Copy with enclosures "N" = No copy

jgn

C:DRP/D}gy D:DRP@p

l

sri

JEfbjl b @

PHH @

JEDyeir~

f

12/3 YT96

01/[g\\l97

01/g /97

\\

OFFICIAL RECORD COPY

,

--

-

,,-.

.

..

-

..

.

-

_

-

.

.

-

3*

JAN - 81997

"

Entergy Operations, Inc.

-4-

E-Mail report to D, Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to R. Frahm (RKF)

E-Ma;l report to R. Correia (RPC)

bec to DMB (IE01)

bec distrib. by RIV:

L. J. Callan

Senior Resident inspector (River Bend)

DRP Director

DRS-PSB

Branch Chief (DRP/D)

MIS System

Project Engineer (DRP/D)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

.

Resident inspector (Grand Gulf)

l

l

l

1

I

)/

t.

DOCUMENT NAME:

To receive copy of document, indicate in box)"

= Copy without enclosures "E" = Copy with enclosures "N" = No copy

'

jg

l

C:DRP/D jgfy D:DRPg l

l

sri

JEfj]% @

PHHg/g/\\

JEDyeP

12/3 ff96

01/Qi97

01/g /97

\\

OFFICIAL RECORD COPY

14005g