JUL 2 41985
Docket No. 50-309
Maine Yankee Atomic Power Company
ATTN: Mr. J. B. Randazza
Vice President
Nuclear Operations
83 Edison Drive
Augusta, Maine 04336
Gentlemen:
On January 31, 1985, you were informed by letter of the results of a
special
inspection
conducted October
9-12,
1984,
Inspection
No.
50-309/84-17, to review your efforts relative to the post accident
sampling and monitoring requirements of NUREG-0737.
Previously, on
October 30, 1984, the findings of that inspection were discussed in a
management meeting at NRC Region I.
At that time, a finding pertaining
to the placement of Containment High Range Radiation Monitoring devices
was determined as unresolved pending review of your basis for the
installation as later submitted on December 18, 1984.
The attached Safety Evaluation Report concludes that the installation,
as found during the inspection, was not in conformance with the speci-
fications of NUREG-0737, Item II. F.I (3) " Containment High Range
Radiation Monitor", in that the monitors were not widely separated and
did not view a large fraction of the . containment volume.
As a result,
this item is not considered to be in compliance with NRC requirements as
set forth in the enclosed Notice of Violation, Appendix A.
You are
required to respond to this violation within 30 days of the date of this
letter.
In responding, please follow the instructions included in the
Appendix.
Your cooperation with us in this matter is appreciated.
Sincerely,
-Original Signed By:
b
-
"
Thomas T. Martin, Direct r
Division of Radiation Sa
y
and Safeguards
Enclosures:
1.
Appendix A, Notice of Violation
2.
Attachment 1, Safety Evaluation Report
8508080208 850724
~
ADOCK 05000309
-
G
OFFICI AL RECORD COPY
m
~~
~
Maine Yankea-Atomic Power Co.
2
cc w/ encl:
C. E. Monty, President
C. D. Frizzle, Assistant Vice President / Manager of Operations
J. H. Garrity, Plant-Manager
P. L. Anderson, Project Manager
G. D. Whittier, Licensing Section Head
J. A. Ritsher, Attorney (Ropes and Gray)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maine
bec'w/ encl:
RegionI.DocketRoom(withconcurrences)
Senior Operations Officer (w/o encis)
DPRP Section Chief
R-
S
S
RI:DRSS
baky
-Bellamy
7
p85
/ 4 85
7
7/v /85
0FFICIAL RECORD COPY
_ . . _