Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133F847 + (13:23:06, 12 December 2024)
- ML20133F845 + (13:23:07, 12 December 2024)
- ML20133F840 + (13:23:11, 12 December 2024)
- ML20133F842 + (13:23:11, 12 December 2024)
- 05000309/LER-1996-040, :on 961208,inadequate Surveillance Procedure for Reactor Trip Breaker Actuation Identified.Surveillance Procedures 3-6.2.2.11 & 3-6.2.2.10 Revised for One Time Test + (13:23:13, 12 December 2024)
- ML20133F838 + (13:23:14, 12 December 2024)
- ML20133F837 + (13:23:15, 12 December 2024)
- ML20133F833 + (13:23:16, 12 December 2024)
- ML20133F835 + (13:23:16, 12 December 2024)
- RBG-21763, Notifies That Calculation of Stability of Svc Water Tunnel Audited by NRC Will Be Reflected in FSAR Per NRC Request. Future FSAR Amend Will Incorporate Appropriate Design Assumptions Provided in Calculation + (13:23:17, 12 December 2024)
- ML20133F830 + (13:23:18, 12 December 2024)
- IR 05000271/1985006 + (13:23:19, 12 December 2024)
- PNO-I-97-004, on 970114,nuclear Density Gauge Containing Approx 10 Mci of Cs-137 & 40 Mci of Am-241 Was Stolen from Storage Location Between 5:00 Pm 970113 & 7:00 Am 970114. Incident Being Handled by State of MD + (13:23:19, 12 December 2024)
- ML20133F824 + (13:23:20, 12 December 2024)
- ML20133F822 + (13:23:21, 12 December 2024)
- ML20133F821 + (13:23:22, 12 December 2024)
- ML20133F816 + (13:23:23, 12 December 2024)
- ML20133F818 + (13:23:23, 12 December 2024)
- ML20133F815 + (13:23:24, 12 December 2024)
- ML20133F813 + (13:23:25, 12 December 2024)
- ML20133F812 + (13:23:25, 12 December 2024)
- ML20133F811 + (13:23:26, 12 December 2024)
- 05000133/LER-1985-004-01, :on 850701,loss of Power & Isolation of Refueling Bldg Ventilation Sys Occurred When Unit Shut Down & in Decommission Stage.Caused by Personnel Error. Ventilation Sys Reset.Personnel Counseled + (13:23:28, 12 December 2024)
- IR 05000322/1985004 + (13:23:29, 12 December 2024)
- ML20133F808 + (13:23:29, 12 December 2024)
- ML20133F803 + (13:23:32, 12 December 2024)
- ML20133F799 + (13:23:33, 12 December 2024)
- ML20133F800 + (13:23:33, 12 December 2024)
- ML20133F798 + (13:23:34, 12 December 2024)
- ML20133F797 + (13:23:35, 12 December 2024)
- ML20133F796 + (13:23:35, 12 December 2024)
- RBG-21715, Forwards Minor Rev to Util Position on Reg Guide 1.23 Re Onsite Meteorological Programs.Revised Position Consistent W/Current Industry Stds & Practice & Will Be Included in FSAR Amend.No Revs to SER or Proposed Tech Specs Required + (13:23:36, 12 December 2024)
- ML20133F791 + (13:23:37, 12 December 2024)
- ML20133F789 + (13:23:38, 12 December 2024)
- ML20133F788 + (13:23:38, 12 December 2024)
- ML20133F787 + (13:23:39, 12 December 2024)
- ML20133F786 + (13:23:40, 12 December 2024)
- 05000277/LER-1985-007-02, :on 850628,reactor Protection Sys & Primary Containment Isolation Sys Initiated Due to False Reactor Low Water Level.Caused by Backfilling Instrument Sensing Lines During Maint.Backfilling Method Reviewed + (13:23:41, 12 December 2024)
- ML20133F784 + (13:23:43, 12 December 2024)
- ML20133F783 + (13:23:43, 12 December 2024)
- ML20133F782 + (13:23:44, 12 December 2024)
- RBG-21762, Forwards Supplemental Response to 840613 Request for Addl Info Re Status of Corrective Action on Five Recent 10CFR21 Notices Issued by Tdi + (13:23:44, 12 December 2024)
- B11756, Forwards Seismic Interaction Review Program... & Application of Data to Seismic Interaction..., in Response to NRC .List of non-Seismic Category I Equipment Installed in Seismic Category I Areas Also Encl + (13:23:45, 12 December 2024)
- ML20133F778 + (13:23:47, 12 December 2024)
- ML20133F777 + (13:23:48, 12 December 2024)
- ST-HL-AE-1371, Informs of Schedule for Implementing Applicable Requirements of 10CFR50.62 Re Reduction of Risk from ATWS Events. Equipment Will Be Installed & Tested in Unit 1 No Later than First Refueling Outage + (13:23:49, 12 December 2024)
- ML20133F776 + (13:23:49, 12 December 2024)
- ML20133F774 + (13:23:50, 12 December 2024)
- ML20133F773 + (13:23:51, 12 December 2024)
- ML20133F772 + (13:23:51, 12 December 2024)
- ML20133F771 + (13:23:52, 12 December 2024)
- ML20133F766 + (13:23:52, 12 December 2024)