Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-322/85-04. Clarification of Responses to Violations 85-04-09A & C & 85-04-11C & 85-04-12C Encl
ML20133F807
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/31/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Leonard J
LONG ISLAND LIGHTING CO.
References
NUDOCS 8508080442
Download: ML20133F807 (3)


Text

F

,

. .

NL 311985 Docket N ,

Long Island Lighting Company ATTN: Mr. John D. Leonard, J Vice President - Nuclear P. O. Box 618 Shoreham Nuclear Power Station Wading River, New York 11792 Gentlemen:

Subject: Inspection Report No. 50-322/85-04 This acknowledges receipt of your June 27, 1985 letter which provided your responses to the findings of the special inspection of your post' accident-sampling and monitoring systems. The report describing these findings was

'

enclosed with our June 5,1985 lette Thank you for informing us of the planned actions documented in your lette These actions will be examined during a future inspection of your licensed progra The enclosure to this letter transmits our understanding of the clarifications to several of your responses discussed between our respective staff If our understanding of these clarifications is not consistent with yours, please contact us within 25 days of receipt of this lette Your cooperation with us is appreciate incerely, Original Signed By:

lhb% '

W ~

Thomas T. Martin, Director

> Division of Radiation Safety

, and Safeguards l Enclosure: Clarification of Response

l 8508080442 850731 PDR ADOCK 05000322 i G PDR l

l OFFICIAL RECORD COPY RL SHOREHAM 85-04 - 0001. /16/85 n

(

,,

.

.<* . .

.

L.I. Lighting C cc w/ encl:

. Steiger, Plant Manager J. Smith, Manager, Nuclear Operations Support R. Kubinak, Director, QA, Safety and Compliance E.: Youngling, Manager, Nuclear Engiheering'

' Edward M. Barrett, Esquire Jeffrey L. Futter, Esquire J. Notaro, Manager, QA Department Shoreham Hearing Service List Public Document Room (PDR)

'e Local Public Document Room. (LPDR)

Nuclear Safety Information Center (NSIC) -

NRC Resident Inspector -

State of New York

'

bcc w/ encl:

Region I Docket Room (with concurrences)

-Sefdor_ Operations-Of44ce@/u e n d-)~

Director, DRSS -

,

, Director, DRS

. DRP Section Chief B. Bordenick, ELD R. Goddard, ELD

.

.

.

\

.

. . e:. 1 v l

{

RI DRSS Nimitz/fi

'Ti D SS P ak hk1 y B

b :[

rby SS

'

07/)l/85 /85 fl 85 7/tf/85

@ .

i'

.

0FFICIAL RECORD COPY RL SHOREHAM 85-04 - 0002. !

07/16/85 i

l l

ye L i

,

"

, ,

.e ,

'

Enclosure -

Page 1 of I CLARIFICATION OF RESPONSE

,

Response N Clarification 85-04-09A(Verification of PASS to This item will be completed collect representative no later than four months samples of primary coolant.) following the point at which

~ sufficient activity is pre -

sent in reactor coolan ~

,

This is estimated to occur between 5% and 20% reactor power 85-04-09C(Ensure noncontaminated air / A design output package gas is used to purge radio- detailing this scheme will be activity analysis systems.) released by August 1, 198 C(Evaluate / consider use of A proposal for software computer software to decay modifications was received correct and accurately by the licensee and is cur-quantify source terms.) rently being reviewe C(Establish procedures for Sufficient procedures are surveillance of effluent inplace to identify and radioactivity detectors initiate replacement of to ensure prompt identifi- inoperable detector cation / replacement of in-operable detectors.)