ML20133F837

From kanterella
Jump to navigation Jump to search
Forwards Meeting Rept 50-423/85-40 on 850708.Exam Results Discussed in 850723 Onsite Meeting W/Candidates Who Failed. Recognizes Steps Being Taken to Meet Scheduled 851101 Fuel Load Date.Insp Coverage Being Configured Accordingly
ML20133F837
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/02/1985
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20133F841 List:
References
NUDOCS 8508080457
Download: ML20133F837 (2)


See also: IR 05000423/1985040

Text

.h

AUG 0 21985

Docket No.

50-423

Northeast Nuclear Energy Company

ATTN:

Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Meeting 50-423/85-40

This letter forwards the NRC report of our July 8,1985 meeting with you in the

NRC Region I offices.

In regard to the matters we discussed concerning issuance of operator licenses,

we believe the meeting was beneficial in developing mutual understanding of the

licensing considerations involved. We are looking forward to improved candidate

performance in the future.

Since our July 8,1985 meeting, the cognizant Region I Branch Chief has discussed,

in a July 23, 1985 onsite meeting, the examination results with the candidates who

failed.

We are making arrangements to meet with the group of upcoming candidates to discuss

preparations and examination requirements.

In regard to the status of Millstone 3 construction, we recognize the steps you

are taking to meet the scheduled November 1, 1985 fuel load date.

Our inspection

coverage is being configured accordingly.

In regard to establishing, by July 19, 1985, a full-time individual onsite dedi-

cated to address worker concerns, we consider this a positive step toward assuring

an appropriate response to employee concerns on your part.

Thank you for your cooperation with us.

,

Sincerely,

gru; mal Signed By

Richard W. Starostecki, Director

Division of Reactor Projects

Enclosure:

NRC Region I Meeting Report 50-423/85-40

8500080457$ho

423

PDR

ADOCK

PDR

Q

_bf

\\

I

L'

,

'

,

.>

'

8

Northeast Nuclear Energy Company

2

AUG 0 21985

cc w/ enc 1:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

DRP Section Chief

G. Walton, SRI, Beaver Valley Unit 2

8. Doolittle, NRR

.

R$

'

DRP

Rkk

P

RI:DRP

RI-

s

McCabe/meo

Wdnzin p

ister

Staro tecki

7 N

3) [

b ,\\ (Y

P_ gi

0FFICIAL RECORD COPY

d