ML20133F837
| ML20133F837 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/02/1985 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20133F841 | List: |
| References | |
| NUDOCS 8508080457 | |
| Download: ML20133F837 (2) | |
See also: IR 05000423/1985040
Text
.h
AUG 0 21985
Docket No.
50-423
Northeast Nuclear Energy Company
ATTN:
Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Meeting 50-423/85-40
This letter forwards the NRC report of our July 8,1985 meeting with you in the
NRC Region I offices.
In regard to the matters we discussed concerning issuance of operator licenses,
we believe the meeting was beneficial in developing mutual understanding of the
licensing considerations involved. We are looking forward to improved candidate
performance in the future.
Since our July 8,1985 meeting, the cognizant Region I Branch Chief has discussed,
in a July 23, 1985 onsite meeting, the examination results with the candidates who
failed.
We are making arrangements to meet with the group of upcoming candidates to discuss
preparations and examination requirements.
In regard to the status of Millstone 3 construction, we recognize the steps you
are taking to meet the scheduled November 1, 1985 fuel load date.
Our inspection
coverage is being configured accordingly.
In regard to establishing, by July 19, 1985, a full-time individual onsite dedi-
cated to address worker concerns, we consider this a positive step toward assuring
an appropriate response to employee concerns on your part.
Thank you for your cooperation with us.
,
Sincerely,
gru; mal Signed By
Richard W. Starostecki, Director
Division of Reactor Projects
Enclosure:
NRC Region I Meeting Report 50-423/85-40
8500080457$ho
423
ADOCK
Q
_bf
\\
I
L'
,
'
,
.>
'
8
Northeast Nuclear Energy Company
2
AUG 0 21985
cc w/ enc 1:
V. Papadopoli, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
E. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
bcc w/ encl:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o enc 1)
DRP Section Chief
G. Walton, SRI, Beaver Valley Unit 2
8. Doolittle, NRR
.
R$
'
Rkk
P
RI:DRP
RI-
s
McCabe/meo
Wdnzin p
ister
Staro tecki
7 N
3) [
b ,\\ (Y
P_ gi
0FFICIAL RECORD COPY
d