Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133H655 + (13:04:52, 12 December 2024)
- ML20133H653 + (13:04:53, 12 December 2024)
- ML20133H654 + (13:04:53, 12 December 2024)
- ML20133H652 + (13:04:54, 12 December 2024)
- ML20133H651 + (13:04:54, 12 December 2024)
- ML20133H649 + (13:04:55, 12 December 2024)
- ML20133H647 + (13:04:56, 12 December 2024)
- ML20133H646 + (13:04:57, 12 December 2024)
- 05000325/LER-1985-037, :on 850710,reactor Protection Sys Trip,Group 1 Isolation,Start of Standby Gas Treatment Sys & Isolation of Reactor Bldg Ventilation Sys Occurred.Caused by Increased Radiation Levels from Radiography + (13:04:58, 12 December 2024)
- ML20133H643 + (13:04:59, 12 December 2024)
- IR 05000302/1985022 + (13:05:00, 12 December 2024)
- 05000219/LER-1985-017, :on 850708,drywell Bulk Average Temps Exceeded. Cause Under Investigation But Appears to Be Associated W/Cooler Design Capacities.Addl Thermocouples at Lower Elevation in Drywell Utilized + (13:05:02, 12 December 2024)
- ML20133H638 + (13:05:03, 12 December 2024)
- ML20133H639 + (13:05:03, 12 December 2024)
- ML20133H637 + (13:05:04, 12 December 2024)
- DCL-85-321, Requests Registration as User of Model CNS 14-215 + (13:05:05, 12 December 2024)
- ML20133H634 + (13:05:06, 12 December 2024)
- ML20133H635 + (13:05:06, 12 December 2024)
- ML20133H633 + (13:05:07, 12 December 2024)
- 05000259/LER-1985-030, :on 850705,deficiency Found in Testing Requirements for Primary Containment Isolation Valves 1-55 & 1-56.Caused by Tech Specs Not Being Revised.Status of Valves Changed to Normally Open + (13:05:08, 12 December 2024)
- ML20133H630 + (13:05:09, 12 December 2024)
- 1CAN068501, Monthly Operating Rept for May 1985 + (13:05:10, 12 December 2024)
- ML20133H628 + (13:05:10, 12 December 2024)
- ST-HL-AE-1405, Forwards Response to Draft SER or FSAR Items Re ASHRAE, Including marked-up FSAR Pages to Be Incorporated in Future FSAR Amend.List of Draft SER & FSAR Open & Confirmatory Items & Open NRC Questions Provided + (13:05:11, 12 December 2024)
- 05000250/LER-1985-006, :Redundant Raw Water Tank II Installed,Which Holds 300,000 Gallons of Water Dedicated to Fire Suppression.New Raw Water Tank II Meets App R Iii.A Requirements Approved by NRC on 811109 + (13:05:13, 12 December 2024)
- ML20133H624 + (13:05:14, 12 December 2024)
- ST-HL-AE-1393, Forwards Response to Draft SER or FSAR items.Marked-up FSAR Pages,Which Will Be Incorporated in Future FSAR Amend,Encl + (13:05:15, 12 December 2024)
- ML20133H622 + (13:05:16, 12 December 2024)
- NLS8500282, Submits Mods to Be Completed After 1986 Outage to Meet ATWS Rule Requirements in 10CFR50.62 & Generic Ltr 85-06 Re QA Guidance for nonsafety-related ATWS Equipment + (13:05:17, 12 December 2024)
- ML20133H617 + (13:05:17, 12 December 2024)
- ML20133H614 + (13:05:18, 12 December 2024)
- ML20133H613 + (13:05:19, 12 December 2024)
- ML20133H612 + (13:05:19, 12 December 2024)
- ST-HL-AE-1401, Forwards Response to Draft SER or FSAR Items,Including marked-up FSAR Pages to Be Incorporated in Future FSAR Amend.List of Draft SER & FSAR Open & Confirmatory Items & Open NRC Questions Provided + (13:05:20, 12 December 2024)
- IR 05000416/1984054 + (13:05:21, 12 December 2024)
- ST-HL-AE-1416, Responds to Draft SER Confirmatory Item 0.0-4 Re Confirmatory Test Described in IE Bulletin 80-06.Revised Response to Question 032.43 Committing to Testing Required by Action 2 of Bulletin Encl + (13:05:21, 12 December 2024)
- ML20133H607 + (13:05:22, 12 December 2024)
- ML20133H605 + (13:05:23, 12 December 2024)
- ML20133H606 + (13:05:23, 12 December 2024)
- 05000382/LER-1985-033, :on 850705,high Level Reactor Trip Setpoint Occurred During Attempt to Transfer Feedwater Pump Load from Main Feedwater Pump B to A.Caused by Impurities in Control Oil for Valve Positioner.Oil Replaced + (13:05:25, 12 December 2024)
- ML20133H602 + (13:05:26, 12 December 2024)
- AECM-85-0311, Responds to Violations Noted in Insp Rept 50-416/85-24. Corrective Actions:Training Given to Shift Health Physics Personnel & Disciplinary Action Taken Against Supervisor & Subordinate Health Physicists + (13:05:27, 12 December 2024)
- ML20133H600 + (13:05:28, 12 December 2024)
- ML20133H599 + (13:05:29, 12 December 2024)
- ML20133H598 + (13:05:30, 12 December 2024)
- ML20133H597 + (13:05:30, 12 December 2024)
- ML20133H596 + (13:05:31, 12 December 2024)
- 05000382/LER-1985-032, :on 850704,reactor Trip Occurred Due to Axial Shape Index Being Out of Range Allowed by Core Protection Calculator.Caused by Xenon Distribution.Plant Operators Given Temporary Guidance on Returning Power + (13:05:32, 12 December 2024)
- PNO-I-85-077, on 851008,radiographer Received Whole Body Dose of 15.5 Rem.Caused by Failure to Retract 100-Ci Ir-192 Source to Shielded Position in Exposure Device.Radiographer Removed from Radiation Work for Remainder of Quarter + (13:05:33, 12 December 2024)
- RBG-21-459, Forwards Revs to Physical Security Plan Re Receipt & Storage of Nuclear Fuel Bundles,Per 10CFR73.67,for Inclusion in 841115 Revised Application.Withheld (Ref 10CFR2.790(d)) + (13:05:35, 12 December 2024)
- ST-HL-AE-1398, Forwards marked-up FSAR Pages in Response to Draft SER Open Item 15.4-2 Re Dropped Rod Analysis.Response Will Be Incorporated in Future FSAR Amend + (13:05:35, 12 December 2024)