~. - - _. - _ - -..
- -. ~
.~
i 1
Onat%,%,.
UNITED ST ATES I
f NUCLE AR REGULATORY COMMISSION j'
WAsniNo1oN O c. 20ws 0001
.p 1
2 January 15, 1997
\\...../
orrect or'Tur SECRCTARY
}
MEMORANDUM TO:
Hugh L. Thompson, Jr Acting Executive Director for Operationa 9'
Karen D.
Cyr Gene 1
ouyel FROM:
Joho
. Hoyl Secretary l
SUBJECT:
STAFF REQUIREMENTS - SECY-96-128 - POLICY AND KEY TECHNICAL ISSUES PERTAINING TO THE J
WESTINGHOUSE AP600 STANDARDIZED PASSIVE i
REACTOR DESIGN 5
i l
The Commission agrees it is important that the AP600 design include adequate means for accident management and long tenn mitigation.
however, the Commission does not support the staff's request for the inclusion of additional system (s)- for accident management and long term mitigation following a. severe accident as presented, not because it may be inappropriate, but because the basic design and performance requirements have not been
' bounded or specified, and the requested additional system (s) do not appear to be consistent with the concept of a passive design.
j The Commission is open to reconsideration of this issue if the j'
staff :an be more specific in terms of what additional system (s) j are contemplated, including the design and performance i
j requirements.
The Commission believes fission product removal coefficients for I
j analyzing the consequences of design basis accidents should be based on technical merits, and should not'be linked to the availability of one or more non-safety systems.
)
The Commission approved the staff's position that the site be capable of sustaining design basis events with onsite equipment and supplies for the long term,'with replenishment of consumables (such as diesel fuel oil) from offsite suppliers after seven i
days.
h 00 3 SECY NOTE:
TH1S SRM, SECY-96-128, AND THE COMMISSION v0 TING RECORD CONTAINING THE VOTE SHEETS OF ALL COMMISSIONERS WILL BE MADE PUBLICLY AVAILABLE 5 WORKING DAYS FROM THE DATE OF THIS SRM.
j) f 9701170229 970115 PDR 10CFR PT9.7 PDR
_ =. -. -- ___ - _
. The Commission approved the staff's position that Westinghouse use a balanced approach, involving reliance on in-vessel retention of the core complemented with limited analytical evaluation of ex-vessel phenomena, to address the adequacy of the AP600 design for ex-vessel events.
i cc:
Chairman Jackson Commissioner Rogers Commissioner Dicus Commissioner Dia:
Commissioner McGaffigan OCA l
OIG Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail) l l