Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133K456 + (12:50:35, 12 December 2024)
- ML20133K459 + (12:50:35, 12 December 2024)
- ML20133K455 + (12:50:36, 12 December 2024)
- 3F0785-24, Responds to Violations Noted in Insp Rept 50-302/85-21. Corrective Actions:Procedures Revised in May 1985 to State Min Pressure of 225 Psig for Diesel Generator Air Start Sys to Reflect FSAR Commitment + (12:50:37, 12 December 2024)
- ML20133K454 + (12:50:37, 12 December 2024)
- ML20133K450 + (12:50:39, 12 December 2024)
- ML20133K449 + (12:50:39, 12 December 2024)
- ML20133K445 + (12:50:40, 12 December 2024)
- 05000366/LER-1996-004-03, :on 960917,misinterpretation of Requirements Resulted in Missed TSs Surveillance Occurred.Caused by Misinterpretation of Unit 2 TSs Surveillance.Procedure 57SV-011-2S Was Written & Approved + (12:50:41, 12 December 2024)
- HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 + (12:50:43, 12 December 2024)
- ML20133K439 + (12:50:43, 12 December 2024)
- ML20133K438 + (12:50:44, 12 December 2024)
- B11782, Requests Schedular Exemption from Requirements of 10CFR50, App A,Gdc 2 Re Seismic Interaction,Until Issuance of Full Power Ol.Exemption Requested to Allow Further Staff Review of Seismic Interaction Program + (12:50:45, 12 December 2024)
- ML20133K434 + (12:50:46, 12 December 2024)
- W3P85-2553, Forwards Util Austerity Program Outline for 1985 & Listing of Possible Effects on Plants.Program Does Not Adversely Impact Safety of Plant or Compliance W/Nrc Regulations + (12:50:47, 12 December 2024)
- ML20133K433 + (12:50:47, 12 December 2024)
- ST-HL-AE-1382, Interim Deficiency Rept Re Valve Installation Process Documentation.Initially Reported on 850913.Review of Documentation Being Performed to Assess Safety Impact.Next Rept Will Be Submitted Before 851221 + (12:50:48, 12 December 2024)
- ML20133K427 + (12:50:50, 12 December 2024)
- TXX-4592, Interim Deficiency Rept SDAR-206 Re Transformers Provided by Westinghouse as Part of 480-volt Switchgear.Initially Reported on 850920.Evaluation Should Be Complete by 851203 + (12:50:51, 12 December 2024)
- ML20133K424 + (12:50:52, 12 December 2024)
- ML20133K425 + (12:50:52, 12 December 2024)
- ML20133K420 + (12:50:53, 12 December 2024)
- 05000282/LER-1985-012-01, :on 850915,reactor Tripped Due to Voltage Transient During Troubleshooting.Caused by Unfamiliarity W/ Regulator.Event Will Be Discussed in Licensed Operator Requalification Program + (12:50:55, 12 December 2024)
- ML20133K418 + (12:50:56, 12 December 2024)
- ML20133K416 + (12:50:56, 12 December 2024)
- ML20133K415 + (12:50:57, 12 December 2024)
- ML20133K414 + (12:50:58, 12 December 2024)
- ML20133K411 + (12:50:59, 12 December 2024)
- ML20133K412 + (12:50:59, 12 December 2024)
- ML20133K410 + (12:51:00, 12 December 2024)
- ML20133K409 + (12:51:01, 12 December 2024)
- ML20133K407 + (12:51:05, 12 December 2024)
- ML20133K406 + (12:51:06, 12 December 2024)
- ML20133K402 + (12:51:07, 12 December 2024)
- ML20133K405 + (12:51:07, 12 December 2024)
- ML20133K401 + (12:51:08, 12 December 2024)
- ML20133K399 + (12:51:10, 12 December 2024)
- ML20133K397 + (12:51:11, 12 December 2024)
- ML20133K395 + (12:51:12, 12 December 2024)
- ML20133K394 + (12:51:13, 12 December 2024)
- ML20133K390 + (12:51:16, 12 December 2024)
- ML20133K387 + (12:51:17, 12 December 2024)
- ML20133K384 + (12:51:18, 12 December 2024)
- ML20133K383 + (12:51:19, 12 December 2024)
- ML20133K382 + (12:51:20, 12 December 2024)
- ML20133K374 + (12:51:24, 12 December 2024)
- ML20133K371 + (12:51:25, 12 December 2024)
- 05000482/LER-1985-061, :on 850914 & 1003,control Room Ventilation Isolation Occurred Due to Chlorine Monitor Signaling High Levels Outside Air Makeup to Sys.Caused by Paper Tape Breakage.Parts in Paper Tape Drive Replaced + (12:51:26, 12 December 2024)
- ML20133K367 + (12:51:27, 12 December 2024)
- IR 05000322/1985032 + (12:51:31, 12 December 2024)
- AECM-85-0322, Forwards Simplified Diagram & Brief Description of ATWS Design,Per 10CFR50.62 Requirements.Implementation Planned Prior to Startup Following Second Refueling Outage + (12:51:32, 12 December 2024)