Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133P230 + (12:15:27, 12 December 2024)
- ML20133P223 + (12:15:28, 12 December 2024)
- ML20133P228 + (12:15:28, 12 December 2024)
- ML20133P222 + (12:15:29, 12 December 2024)
- HBL-85-035, Forwards Complete Response to Item 75 of NRC 850123 & 0214 Requests for Addl Info Re Safstor Decommissioning of Facility.Util Response to NRC Questions on Safstor Decommissioning Complete + (12:15:30, 12 December 2024)
- ML20133P220 + (12:15:31, 12 December 2024)
- ML20133P219 + (12:15:31, 12 December 2024)
- IR 05000302/1985023 + (12:15:32, 12 December 2024)
- ML20133P216 + (12:15:32, 12 December 2024)
- IR 05000416/1985025 + (12:15:35, 12 December 2024)
- RBG-21825, Withdraws 850812 Exemption Request for Square D,125 Dc Panelboard.Seismic Qualification for Panelboard,Spec 242.421,completed + (12:15:36, 12 December 2024)
- ML20133P212 + (12:15:36, 12 December 2024)
- AECM-85-0230, Submits Addl Info Re Proposed Addition to License NPF-29 Submitted in on Use of Auxiliary Bldg Railroad Bay Area as Secondary Containment Boundary While Spent Fuel Racks & Equipment Being Moved + (12:15:37, 12 December 2024)
- ML20133P207 + (12:15:38, 12 December 2024)
- ML20133P208 + (12:15:38, 12 December 2024)
- IR 05000414/1985029 + (12:15:39, 12 December 2024)
- ML20133P199 + (12:15:40, 12 December 2024)
- ML20133P203 + (12:15:40, 12 December 2024)
- ML20133P198 + (12:15:41, 12 December 2024)
- ML20133P197 + (12:15:42, 12 December 2024)
- ML20133P195 + (12:15:42, 12 December 2024)
- ML20133P190 + (12:15:47, 12 December 2024)
- ML20133P185 + (12:15:48, 12 December 2024)
- ML20133P182 + (12:15:49, 12 December 2024)
- 05000482/LER-1985-067, :on 850923,reactor Trip,Turbine Trip,Steam Generator Blowdown & Sample Isolation,Feedwater Isolation & Auxiliary Feedwater Actuation Occurred.Caused by Failed Controller Card.Card Replaced + (12:15:51, 12 December 2024)
- ML20133P178 + (12:15:52, 12 December 2024)
- ML20133P176 + (12:15:53, 12 December 2024)
- ML20133P175 + (12:15:53, 12 December 2024)
- 05000528/LER-1985-063, :on 850912,when Main Generator Breaker Opened, Reactor Tripped Due to Core Protection Calculators Sensing Loss of Forced Coolant Circulation.Reactor Trip Caused Turbine Trip.Cause Not Stated + (12:15:55, 12 December 2024)
- 05000267/LER-1985-018, :on 850925,automatic Actuation of Plant Protective Sys Reactor Scram Circuitry Occurred.Caused by Personnel Error While Troubleshooting Circulator D Inlet Temp.Personnel Counseled + (12:15:57, 12 December 2024)
- ML20133P172 + (12:15:58, 12 December 2024)
- ML20133P171 + (12:15:59, 12 December 2024)
- ML20133P169 + (12:16:00, 12 December 2024)
- ML20133P168 + (12:16:01, 12 December 2024)
- AECM-85-0228, Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid + (12:16:02, 12 December 2024)
- ML20133P166 + (12:16:02, 12 December 2024)
- ML20133P161 + (12:16:03, 12 December 2024)
- ML20133P158 + (12:16:04, 12 December 2024)
- ML20133P160 + (12:16:04, 12 December 2024)
- ML20133P156 + (12:16:05, 12 December 2024)
- ML20133P154 + (12:16:06, 12 December 2024)
- ML20133P151 + (12:16:07, 12 December 2024)
- ML20133P152 + (12:16:07, 12 December 2024)
- ML20133P147 + (12:16:08, 12 December 2024)
- ML20133P145 + (12:16:08, 12 December 2024)
- ML20133P139 + (12:16:09, 12 December 2024)
- ML20133P137 + (12:16:10, 12 December 2024)
- ML20133P130 + (12:16:11, 12 December 2024)
- ML20133P127 + (12:16:12, 12 December 2024)
- ML20133P126 + (12:16:12, 12 December 2024)
- IR 05000508/1985004 + (12:16:16, 12 December 2024)
- ML20133P122 + (12:16:17, 12 December 2024)