s'

' o DUKE POWER GOMPANY l

P.O. BOX 33189 CHARLOTrE, N.C. 28242 HAL B. TUCKER TE1.EPHONE "C"'"'*88'"'

(704) 373-4Mt NET: LEAR PRODUCTION July 15, 1985 co Dr. J. Nelson Grace, Regional Administrator cn U. S. Nuclear Regulatory Commission c

Region 11 5

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 o

RE: Catawba Nuclear Station, Unit 2 c:o Docket No. 50-414 Significant Deficiency No. 414/85-06 C4 ta

Dear Dr. Grace:

I Please find attached an update on the status of all outstanding corrective actions for this deficiency as outlined in the initial report transmitted to you on May 22, 1985.

1 Very truly yours, 4

Hal B. Tucker L"?/mj f i

Attachment i

l cc: Director Mr. Robert Guild, Esq.

I Office of Inspection and Enforcement Attorney-at-Law U. S. Nuclear Regulatory Commission P. O. Box 12097 Washington, D. C. 20555 Charleston, South Carolina 29412 NRC Resident Inspector Mr. Jesse L. Riley Catawba Nuclear Station Carolina Environmental Study Group Palmetto Alliance 854 Henley Place 2135 Devine Street Charlotte, North Carolina 28207 Columbia, South Carolina 29205 INPO Records Center i

Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 i

[

8508140169 850715 PDR ADOCK 05000414 S

PDR t'ZE17 z

Status Report on Corrective Action:

SD 414/85-06 All affected piping and equipment in the Chemical and Volume Control (NV) System has been evaluated and work initiated to replace or repair damaged components. All actions associated with the Non-conforming Item Reports and the Shutdown Requests have been completed with the following exceptions:

Minor installation repairs to the newly e

installed Volume Control Tank.

e Repairs to remaining NV System pipe supports.

e Final alibration of NV System instrut ation.

e Repairs i several pipe supporta in the Liquid Waste System Drain Line and a final inspection of piping and supports in this area.

All remaining work will be complete by August 15, 1985 by which time a final follow-up report will be submitted.