Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133P834 + (12:09:34, 12 December 2024)
- ML20133P832 + (12:09:35, 12 December 2024)
- ML20133P830 + (12:09:36, 12 December 2024)
- ML20133P831 + (12:09:36, 12 December 2024)
- ML20133P829 + (12:09:37, 12 December 2024)
- ML20133P827 + (12:09:38, 12 December 2024)
- ML20133P828 + (12:09:38, 12 December 2024)
- ML20133P823 + (12:09:42, 12 December 2024)
- ML20133P821 + (12:09:43, 12 December 2024)
- ML20133P819 + (12:09:43, 12 December 2024)
- ML20133P817 + (12:09:44, 12 December 2024)
- ML20133P816 + (12:09:45, 12 December 2024)
- ML20133P815 + (12:09:45, 12 December 2024)
- ML20133P813 + (12:09:46, 12 December 2024)
- ML20133P814 + (12:09:46, 12 December 2024)
- ML20133P811 + (12:09:47, 12 December 2024)
- ML20133P810 + (12:09:48, 12 December 2024)
- ML20133P808 + (12:09:49, 12 December 2024)
- ST-HL-AE-1428, Forwards Response to Draft SER or FSAR Items Q220.04N, Q220.08N,Q220.09N,Q220.13N,Q220.25N & Q220.30N Re Revised Response to NRC Structural Engineering Branch Questions. Info Will Be Incorporated in Future FSAR Amend + (12:09:49, 12 December 2024)
- ML20133P804 + (12:09:50, 12 December 2024)
- ML20133P802 + (12:09:51, 12 December 2024)
- 05000413/LER-1996-012, :on 961211,auxiliary Feedwater Sys Found Outside Design Basis Occurred.Caused by Initial Design Oversight.Minor Mods Were Completed to Add Check Valves to Each Unit + (12:09:52, 12 December 2024)
- ML20133P800 + (12:09:55, 12 December 2024)
- 05000416/LER-1985-026, :on 850621,flanges Used to Perform Airlock Overall Leakage Barrel Tests Not Local Leak Rate Tested. Caused by Incorrect Conclusions of 1983 Review.Flanges Tested & Added to Surveillance Procedures + (12:09:57, 12 December 2024)
- ST-HL-AE-1446, Forwards Response to Listed Draft SER or FSAR Items Re Filter Housing Drain Sys for Steam Generator Tube Rupture. Mark-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (12:09:58, 12 December 2024)
- ML20133P795 + (12:09:59, 12 December 2024)
- B11777, Forwards Response to Request for Addl Info Re 850724 Application to Revise Tech Specs on Spent Fuel Storage Capacity + (12:10:00, 12 December 2024)
- ML20133P791 + (12:10:00, 12 December 2024)
- ML20133P790 + (12:10:01, 12 December 2024)
- ML20133P787 + (12:10:02, 12 December 2024)
- RC-96-0206, Forwards 15th Yr Physical Surveillance Rept of Facility Containment Bldg,Per NRC Request + (12:10:02, 12 December 2024)
- ML20133P786 + (12:10:03, 12 December 2024)
- ML20133P784 + (12:10:04, 12 December 2024)
- ML20133P785 + (12:10:04, 12 December 2024)
- ML20133P783 + (12:10:05, 12 December 2024)
- ML20133P782 + (12:10:06, 12 December 2024)
- ML20133P781 + (12:10:06, 12 December 2024)
- ML20133P778 + (12:10:07, 12 December 2024)
- ML20133P777 + (12:10:08, 12 December 2024)
- ST-HL-AE-1436, Forwards Response to Draft SER Item 3.6-1 Re Criteria Used for Selecting Postulated Break Locations Types in ASME Class 1,2 & 3 piping.Mark-up FSAR Pages Will Be Incorporated in Future FSAR Amend + (12:10:09, 12 December 2024)
- ST-HL-AE-1450, Forwards Response to Draft SER or FSAR Items.Attachment Includes marked-up FSAR Page Re Pipe Rupture Loads Used in Containment Design Which Will Be Incorporated in Future FSAR Amends + (12:10:10, 12 December 2024)
- ML20133P773 + (12:10:10, 12 December 2024)
- ML20133P771 + (12:10:11, 12 December 2024)
- 05000333/LER-1996-015-01, :on 961218,determined Bypass Flow Path Around Offgas Isolation Valve.Caused by Design Deficiency.Installed Check Valve in Common Drain Line to Prevent Reverse Flow from Steam Jet Air Ejector Discharge + (12:10:13, 12 December 2024)
- ML20133P767 + (12:10:14, 12 December 2024)
- ML20133P769 + (12:10:14, 12 December 2024)
- ML20133P765 + (12:10:15, 12 December 2024)
- ML20133P763 + (12:10:16, 12 December 2024)
- ML20133P764 + (12:10:16, 12 December 2024)
- NG-97-0059, Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center + (12:10:17, 12 December 2024)
- ML20133P759 + (12:10:18, 12 December 2024)
- ML20133P760 + (12:10:18, 12 December 2024)