ML20133P760
ML20133P760 | |
Person / Time | |
---|---|
Issue date: | 08/12/1985 |
From: | Rossi C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
To: | Fulton J BOSTON EDISON CO., GENERAL ELECTRIC OPERATING PLANT OWNERS GROUP |
Shared Package | |
ML20133P757 | List: |
References | |
NUDOCS 8508140468 | |
Download: ML20133P760 (1) | |
Text
_ _ ____ ____________ ___
- I AUG 121906 .
Mr. Jack H. Fulton, Chairman General Electric Owners Group Boston Edison Company
- 25 Braintree Hill Office Park Braintree, MA 02184
Dear Mr. Fulton:
SUBJECT:
IE ORAFT BULLETIN: MOTOR-0PERATE0 VALVE FAILURES DURING PLANT TRANSIENTS DUE TO IMPROPER SWITCH SETTINGS The enclosed draft bulletin is being considered for issuance to all nuclear power reactor facilities holding an operating license or construction permit.
We would appreciate your comments on the draft bullctin and any input on the anticipated burden the bulletin may impose on nuclear utilities. Any comments received prior to August 23, 198s will be considered in the preparation of the final draft to be presented to the Committee to Revie,e Generic Requirements.
If you have any questions regarding this matter, please feel free to contact me or Mr. Henry Bailey of my staff. I can be reached at (301) 492-4193 and Henry at (301) 492-9006.
Sincerely.
Original *wt by 2 .f .
Charles E. Rossi, Chief
/ n?
Event: Analysis Branch Olvision of Emergency Preparedness and Engineering Responso Office of Inspection and Enforcement
Enclosure:
IE draft bulletin Ofstribution:
POR.
(_DCS DEPER R/F EAD R/F CRossi RBaer ELJordan HBalley RKiessel G500140460 050012 POR 1&E MISC PDH i
eq,es emes