ML20133P790

From kanterella
Jump to navigation Jump to search
Forwards IE Draft Bulletin, Motor-Operated Valve Failures During Plant Transient Due to Improper Switch Settings. Comments Requested Re Draft Bulletin & Anticipated Burden on Nuclear Utils Prior to 850823
ML20133P790
Person / Time
Issue date: 08/12/1985
From: Rossi C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Wells R
C-E OPERATING PLANTS OWNERS GROUP, NORTHEAST UTILITIES SERVICE CO.
Shared Package
ML20133P757 List:
References
NUDOCS 8508140487
Download: ML20133P790 (1)


Text

p .

AUG 121985 Mr. R. Wells, Chairman Combustion Engineering Owners Group Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06101

Dear Mr. Wells:

SUBJECT:

IE DRAFT BULLETIN: MOTOR-0PERATED VALVE FAILURES DURING PLANT TRANSIENTS DUE TO IMPROPER SWITCH SETTINGS The enclosed draft bulletin is being considered for issuance to all nuclear power reactor facilities holding an operating license or construction permit.

We would appreciate your comments on the draft bulletin and any input on the anticipated burden the bulletin may impose on nuclear utilities. Any comments received prior to August 23, 1985 will be considered in the preparation of the final draft to be presented to the Committee to Review Generic Requirements.

If you have any questions regarding this matter, please feel free to contact me or Mr. Henry Bailey of my staff. I can be reached at (301) 492-4193 and Henry at (301) 492-9006.

Sincerely, Charl E. Rossi, C ief Events Analysis Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement

Enclosure:

IE draft bulletin D" tribution:

R

/CS DEPER R/F EAB R/F CRossi RBaer ELJordan HBailey RKiessel

. R:IE E : b Hplil y:mj kossi 8q/85 8//J85 8508140487 850812 PDR I&E MISC PDR