ML20133P782
| ML20133P782 | |
| Person / Time | |
|---|---|
| Issue date: | 08/12/1985 |
| From: | Rossi C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Bivens A ATOMIC INDUSTRIAL FORUM |
| Shared Package | |
| ML20133P757 | List: |
| References | |
| NUDOCS 8508140480 | |
| Download: ML20133P782 (1) | |
Text
- _ - - _ _ _ _ _ _
AUG 121985
(
Mr. Arthur Bivens Reactor Operation and Construction Manager Atomic Industrial Forum 7101 Wisconsin Avenue, 12th floor Bethesda, Maryland 20814 i
Dear Mr. Bivens:
SUBJECT:
IE DRAFT BULLETIN:
MOTOR-0PERATED VALVE FAILURES DURING PLANT TRANSIENTS DUE TO IMPROPER SWITCH SETTINGS The enclosed draft bulletin is being considered for issuance to all nuclear power reactor facilities holding an operating license or construction permit.
We would appreciate your comments on the draft bulletin and any input on the anticipated burden the bulletin may impose on nuclear utilities.
Any comments received prior to August 23, 1985 will be considered in the preparation of the final draft to be presented to the Committee to Review Generic Requirements.
If you have any questions regarding this matter, please feel free to contact me or Mr. Henry Bailey of my staff.
I can be reached at (301) 492-4193 and Henry at (301) 492-9006.
Sincerely, Charles /. Rossi, Chief Events Analysis Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement
Enclosure:
IE draft bulletin Distribution:
PD DEPER R/F EAB R/F CRossi RBaer ELJordan HBailey RKiessel
- D PER:IE E