ML20133P777
ML20133P777 | |
Person / Time | |
---|---|
Issue date: | 08/12/1985 |
From: | Rossi C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
To: | Flynn J INSTITUTE OF NUCLEAR POWER OPERATIONS |
Shared Package | |
ML20133P757 | List: |
References | |
NUDOCS 8508140476 | |
Download: ML20133P777 (1) | |
Text
_ _ _ _ _ _ _
g)G12 W Mr. J. P. Flynn Manager, Events Analysis Department Institute for Nuclear Power Operations 1100 Circle 75 Parkway Suite 1500 Atlanta, Georgia 30339
Dear Mr. Flynn:
SUBJECT:
IE DRAFT BULLETIN: MOTOR-0PERATED VALVE FAILURES DURING PLANT TRANSIENTS DUE TO IMPROPER SWITCH SETTINGS The enclosed draft bulletin is being considered for issuance to all nuclear power reactor facilities holding an operating license or construction permit.
We would appreciate your comments on the draft bulletin and any input on the anticipated burden the bulletin may impose on nuclear utilities. Any comments received prior to August 23, 1985 will be considered in the preparation of the final draft to be presented to the Committee to Review Generic Requirements.
If you have any questions regarding this matter, please feel free to contact me or Mr. Henry Bailey of my staf f. I can be reached at (301) 492-4193 and Henry at (301) 492-9006.
Sincerely, U/igbal sigm d by I{ I.
Charles E. Rossi, Chief Events Analysis Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement
Enclosure:
IE draft bulletin Distribution:
PDR/
tocs DEPER R/F EAB R/f CRossi RDaer ELJordan HBalley RKlessel
] i l~.
lER:IE A PER:It pW.
y:mj /Cl'fto '51 85
,; 8Q/85 OD00140476 ObOO12 PDH 18,E MIGC PDil
- _ _ _ - _ _ _ _ _ - _ - _