Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134A204 + (12:00:57, 12 December 2024)
- ML20134A202 + (12:00:58, 12 December 2024)
- ML20134A200 + (12:00:59, 12 December 2024)
- ML20134A198 + (12:00:59, 12 December 2024)
- ML20134A197 + (12:01:00, 12 December 2024)
- ML20134A196 + (12:01:00, 12 December 2024)
- ML20134A195 + (12:01:02, 12 December 2024)
- ML20134A193 + (12:01:03, 12 December 2024)
- ST-HL-AE-1494, Forwards Response to Draft SER & FSAR Open/Confirmatory Items,Including Item Q430.118N Re ESF Load Sequencer Reliability Analysis.Info Will Be Included in Future FSAR Amend + (12:01:03, 12 December 2024)
- ML20134A189 + (12:01:04, 12 December 2024)
- 05000254/LER-1996-025-01, :on 961220,discovered Original Value for Strainers Head Loss Incorrect.Cause Could Not Be Determined. Training Provided for Operators to Recognize Pump Cavitation During Design Basis Accidents + (12:01:06, 12 December 2024)
- ML20134A186 + (12:01:07, 12 December 2024)
- IR 05000302/1985040 + (12:01:08, 12 December 2024)
- PNO-II-85-097, on 851021,notification Received That Reactor Will Be Shut Down for Approx 8-10 Days to Repair Boot Seal Between Condenser & Low Pressure Turbine.Region II Will Conduct Routine Followup + (12:01:09, 12 December 2024)
- ML20134A182 + (12:01:10, 12 December 2024)
- ML20134A181 + (12:01:10, 12 December 2024)
- ML20134A179 + (12:01:11, 12 December 2024)
- ML20134A178 + (12:01:12, 12 December 2024)
- ML20134A177 + (12:01:12, 12 December 2024)
- ML20134A175 + (12:01:15, 12 December 2024)
- IR 05000346/1985032 + (12:01:16, 12 December 2024)
- ML20134A171 + (12:01:16, 12 December 2024)
- 05000254/LER-1996-025, Forwards LER 96-025-00 Re Operability Calculations Performed on ECCS Suction Strainers W/Incorrect Head Loss Values + (12:01:20, 12 December 2024)
- B11804, Forwards Reviews of Integrated Safety Assessment Program Topic 1.45, Sys Interactions, Including Discussion of Safety Objective & Evaluation of Plant Design,Per 850517 Commitment.Topic Provides Status of USI A-17 + (12:01:21, 12 December 2024)
- PNO-III-85-028D, decontamination Activities at Licensee Lab Facility Successfully Completed.Site Released for Unrestricted Use.Low Level Transuranic Waste Transferred to Mound Lab or Bmi for short-term Storage + (12:01:21, 12 December 2024)
- ML20134A167 + (12:01:22, 12 December 2024)
- IR 05000277/1985039 + (12:01:23, 12 December 2024)
- ML20134A160 + (12:01:24, 12 December 2024)
- ML20134A163 + (12:01:24, 12 December 2024)
- ML20134A157 + (12:01:25, 12 December 2024)
- IR 05000285/1984028 + (12:01:26, 12 December 2024)
- ML20134A155 + (12:01:26, 12 December 2024)
- ML20134A151 + (12:01:27, 12 December 2024)
- ML20134A153 + (12:01:27, 12 December 2024)
- ML20134A149 + (12:01:28, 12 December 2024)
- ML20134A150 + (12:01:28, 12 December 2024)
- ML20134A146 + (12:01:30, 12 December 2024)
- ST-HL-AE-1465, Forwards Response to Draft Ser/Fsar Item 9.1-1 Re Update of Section 9.1 Concerning Spent Fuel Rack Configuration.Encl marked-up FSAR Page Will Be Incorporated Into Future FSAR Amend + (12:01:30, 12 December 2024)
- ML20134A144 + (12:01:32, 12 December 2024)
- ML20134A141 + (12:01:33, 12 December 2024)
- ML20134A139 + (12:01:33, 12 December 2024)
- ST-HL-AE-1470, Forwards Response to Draft SER or FSAR Item Q430.36N Re Dc Power Sys.Each Battery Sized to Provide Min of 1.78 V/Cell at Discharge State After 2 H.Changes Will Be Incorporated in Future FSAR Amend + (12:01:34, 12 December 2024)
- ML20134A137 + (12:01:35, 12 December 2024)
- ST-HL-AE-1437, Responds to Request for Info Re Draft Ser/Fsar Item on Protection Against Internal Flooding of ESF Equipment Trains + (12:01:35, 12 December 2024)
- ML20134A135 + (12:01:36, 12 December 2024)
- ML20134A134 + (12:01:37, 12 December 2024)
- ML20134A132 + (12:01:38, 12 December 2024)
- ML20134A133 + (12:01:38, 12 December 2024)
- 05000328/LER-1985-007-04, :on 850712,inadvertent Trip of Normal Feeder Breaker on 6,900-volt Shutdown Board Actuated ESF Sys.Cause Undetermined + (12:01:40, 12 December 2024)
- PNO-II-85-096, on 851018,reactor Shut Down Due to Unidentified RCS Leak of 1.3 Gpm.Cause Under Investigation. Probably Caused by RHR Valve Packing Leak.Plant in Hot Standby for 72 H + (12:01:41, 12 December 2024)
- U-600284, Responds to NRC Re Violations Noted in Insp Rept 50-461/85-36.Corrective Actions:Status Administrative Program Revised to Include Appropriate Controls for Test Step Sequencing + (12:01:42, 12 December 2024)