Further Response to FOIA Request for Documents Re Analyses of Potential for Debris Dam Blocking Natural Outlet of Spirit Lake.Apps C & D Documents Available in Pdr.Portions of App C Documents Withheld (Ref FOIA Exemption 6)
ML20134A181
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/15/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Bell N
NUCLEAR INFORMATION & RESOURCE SERVICE
Shared Package
ML20132B592 List:
References
FOIA-85-353 NUDOCS 8508150219
Download: ML20134A181 (7)


Text

- _ _ . - _ .

causw

  1. ' UNITED STATES 8 o,% NUCLEAR REGULATORY COMMISSION 5 WASHING TON, D. C. 20555 l

\...../

R 15 96 Ms. Nina Bell Assistant Director Nuclear Infomation and Resource Service 1346 Connecticut Avenue, NW, 4th Floor IN RESPONSE REFER Washington, DC 20036 TO F0!A-85-353

Dear Ms. Bell:

This is in further response to your letter dated May 8, 1985, in which you requested, pursuant to the Freedom of Infonnation Act (F0IA), all documentation pertaining to Anny Corps of Engineers and NRC analyses of the potential for a debris dam blocking the natural outlet of Spirit Lake and affecting the Trojan nuclear power plant and the current status of the permanent tunnel the Corps proposed to install.

, The enclosed Appendix C i<fentifies documents which are being made available

for your inspection and copying at the NRC Public Document Room (PDR),1717 H

, Street, NW, Washington, DC 20555. The documents will be filed in PDR folder F0!A-85-353 under your name. Appendix D identifies documents which the NRC has already made publicly available at the PDR.

Portions of documents 2 and 20 of Appendix C have been deleted in order to withhold the home telephone numbers of employees associated with the Mount St.

Helens/ Spirit Lake alert / warning procedures. Because disclosure of this I

infonnation would constitute a cicarly unwarranted invasion of personnel privacy, it is being withheld from public disclosure pursuant to Exemption (6) of the FOIA (5 U.S.C. 552 (b)(6)) and 10 CFR 9.5(a)(6) of the Commission's regulations.

Pursuant to 10 CFR 9.9 of the Comission's regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the public interest. The persons responsible for this dental are the undersigned and Mr. Harold R.

Denton, Director, Office of Nuclear Reactor Regulation.

i b

1 0500150219 050715

, PDR FOIA l

DELLD5-353 PDR i

i I

- =. .. _ - _ _ - . - _ . - - . . _ . - - . . . . _ _ - _ - . - - . _ . _ . - - . . _ -

? .

e l

l .

t ,

This denial may be appealed to the NRC within 30 days from the receipt of this letter. As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory ,

Comunission Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial FOIA Decision."

This completes NRC's action on your request.

Sincerely,

. M. Felton, Director Division of Rules and Records Office of Administration

Enclosures:

As stated i

i i

(

i I

l l

r

[

i

_- . - . . - - - - - - _- - - ..- - - - - . . ~ _ - -. -

i .

i l

. i

!. Re: F0!A-85-353 i APPENDIX C i

l Documents to be Placed in PDR

) 1. 10/1981 U.S. Army Corps of Engineers Report entitled " Mount St. Helens Eruption - The Challenge to Restore and Protect" (90 pages) j l 2. 12/22/82 Memo Distribution List from National Weather Service Re:

1 Spirit Lake. Coldwater and South Castle Debris Structure Failure Alert / Warning Procedures w/ enclosure Sub.iect '

i 1 Procedure (9pages) i, j 3. 01/1n/83 Off-Normal Instruction Sheet Re: Trojan Nuclear Plant i

j (9 pages)

4. 02/16/83 Handwritten Note to Dick Donovan Re: NoEvacuation(1page)

I j 5. 02/17/83 Transmittal of Division of Licensing Work Request Re:

j Mt.St. Helen (1page)

6. 02/17/83 Transmittal of Division of Licensing Work Request Re:

l Mt. St. Helen (1 page)  !

l '

7. 02/17/83 Technical Assignment Control Form from C. Tramel Re:

Mt. St. Helen (1 page) s

! 8. 02/17/83 Transmittal of Division of Licensing Work Request Re: l Mt.St. Helen (6pages)  ;

I

9. 02/17/83 Transmittal of Division of Licensing Work Request Re:

l Mt. St. Helen (1 page)

I 'l

' 10. 02/17/83 HandwrittenNoteRe.Mt.St. Helen (1page) i I 1

11. 02/18/83 Memo to Addressee List Thru Robert Clark Re: Daily Highlight (1page) l j r

) 12. 02/23/83 Transmittal Slip to J. Knight and R. Vollner Re: Contact i withUSGSw/enclosureWorkRequest(2pages) i

13. 02/23/83 Handwritten Note Re: FEMA (1page)
14. 02/24/83 Handwritten Note to Bill Brown Re: Corps Alternative i Standards (3pages) l J 15. 02/24/83 Note to Gus Lainas from Robert Capra Re: Plant-Specific Licensing Action Change for 051 w/ enclosure Work Request (2pages)

)

I 1

I i

l

'I l

l Re: F01A-85-353

) 16. 02/28/83 Telfphone Call from J. Lentsch to Dave Kresch Re:

r 1

St.HelensMudflows(1page)

17. 03/16/83 Handwritten Note to C. Tramell from H. Lefevre Re: FEMA

')

1 Jan.1,1983 " Findings" Relative F 'lolcanic-Related r

] Hazards w/ enclosures Ltr. dtd. 3/7/83 to Charles Tramell from Richard Donovan, Memo dtd 2/23/83 to Dave McLoughlin >

j Pe: FEMA Findings and Determinations (21 pages) l l 18. 03/29/83 Note to 0. Parr from R. Capra Re: TAC 49636-Trojan '

w/ enclosure DL Work Request (2 pages) l

19. 04/28/83 Handwritten Note Re: Trojan-SpiritLakeDamBlockage(1page) l 20. 05/02/83 Notification of Mount St. Helens and Spirit Lake t l

Conditions (3 pages) .

y i

21. 05/06/83 Facsimile Request to Gary Zimerman from Charles Tramell '

! w/ enclosure Hydrologic Engineering Questions Concerning a j Postulated Breakout of Spirit Lake and the Effects on the TrojanNuclearPlant(4pages) ,

4 l 22. 05/16/83 HandwrittenNotetoMikeFliegel(1page) j

23. 05/16/83 Memo to J. Lentsch from L. Erickson Re: Contingency Plan [

i for Flooding Beyond the Design Basis Flood w/ enclosure  !

i Trojan Core Cooling Plan for Flood Elevation 50 FT i

! (4pages) t l 24. 05/17/83 Off-Normal Instruction Sheet Re: Trojan Nuclear Plant  !

(3 pages)

25. 05/19/83 Handwritten Note Re: Meeting in Vollmer's Office Re:

SpiritLakeBlockage& Trojan (1page)

26. 05/23/83 Handwritten Note to Addressee List from C. Tramell Re:

1 Mountit.Helenw/enclosuresNewsClippings(4pages)

27. 06/17/83 Handwritten Note Re: SpiritLake(1page) l 28. 06/20/83 Letter to Ronald Ballard from L. 1.aird Re Preliminary  !

I Findings on Potential Spirit Lake Mudflow Impact on 1 Columbia River and Trojan Nuclear Plant w/ enclosure i i PreliminaryFindings(3pages) ,

f 29. 07/19/83 Memo to Robert Clark from Ronald Ballard Re: Portland 1 General Electric Spirit Lake Failure Effects on Trojan w/ enclosure Questions Re: Potential Mudflow from l

Hypothetical Failure of Spirit Lake Blockage (3 pages)

I l

I t i

4 ~

b

30. 09/11/83 Letter to Leslie Laird from Ronald Pallard Re: Potential

) Mudflows at Trojan Nuclear Plant From Assumed Failure j

of Spriit Lake Blockage (1 page) t j 31. 01/31/84 Handwritten Note to Darrell Eisenhut fron C. Tramell Re: ,

l MudflowHazards(1page) l 1

i

32. 02/06/84 Note to D. Eisenhut from C. Tramell Re: Trojan Spirit Lake Blockage (1 page)

! 33. 02/13/84 Memo to Robert Jackson from Harold Lefevre Re: USGS Documents i w/ enclosures Ltr. dtd. 2/7/84 to Robert Jackson from i

S. Algermissen, Geologic Hazards Bulletin and Review of i j "A Comprehensive Plan for Responding to the Long-Tenn Threat i Created by the Eruption of Mount St. Helens" (25 pages) ,

I 34. 02/21/84 Memo to Darrell Eisenhut from James Miller Re: Spirit Lake  :

Blockage Status - Trojan (1 page) l 35. 02/23/84 Handwritten Note Re: SpiritLake(5pages)

(

j 36. 03/29/84 Note to Gus Lainas from Robert Capra Re: Plant-Specific j Licensing Action Change for 051 w/ enclosure DL Worn i i Request (2 pages) '

I

37. 09/14/84 Transmittal Slip to C. Tramell from R. Gonzales w/ enclosures i Memo to Gus Lainas from William Johnston Pe: Spirit
Lake /TrojanPlantFloodingandMonitoringProgram(5pages) f l
38. 04/08/85 Telephone Conversation Between H. Lefevre and David Kresch l Re: Status of FEMA-sponsored Report (1 page) i f
39. Undated Handwritten Note to Jim Miller from Ray Gonzales w/ enclosure f Memo from Charles Tramell Re: Spirit Lake Blockage and j Flooding Potential at Trojan (3 pages)

! 40. Undated w/ enclosure Re: Blast and Resultant Mud and Pyroclastic Drawinf2pages)

Flows

41. Undated Drawing Re: Mudflow(1page) i

] 42. Undated Drawing Re: Mudflow(1page) l 43. Undated DrawingRe:Mudflow(1page)

44. Undated DrawingRe:Mudflow(1page)
45. Undated Drawing Re: Mudflow(1page)

)i DrawingRe:Mudflow(1page)

46. Undated l

' Re: F0IA-85-353 t

i

47. Undated Drawing Re: Mudflow(1page)
48. Undated Drawing Re: Mudflow (1 page)
49. Undated Drawing Re: Mudflow(1page)

! 50. Undated Drawing Re: Mudflow(1page) 1 i

I 1

q l

\

I 1 i

l i '

?

I 4

1

i l

l

.- l I, Re
F01A-85-353 [

]

APPENDIX D y

Documents Already in PDR ,

l1 i 1. 03/07/83 Letter to Charles Trammell from Richard Donovan Re: Findings i for the Trojan Site w/ enclosure Memo dtd. 2/23/83 from j W. Mayer and FEMA Findings and Determinations Acc. No.

8303150230 (20 pages) .

i

, 2. 04/12/83 Letter to Mr. Clark from Bart Withers Re: Potential Mudflow

! from the Hypothetical Failure of Spirit Lake Blockage

! Acc.No.8304180488830412(2pages)

I

] 3. 06/20/83 Letter to Ronald Ballard from L. Laird Re: Preliminary j Findings on Potential Spirit Lake Mudflow Impact on j Columbia River and Trojan Nuclear Plant w/ enclosure 1 Preliminary Findings Acc. No. 8307060063 830620 (3 pages) j 4. 02/17/84 Memo to James Miller from Charles Tramell Re: Forthcoming ,

i Meeting with Portland General Electric Trojan Nuclear Plant I w/ enclosure Agenda Acc. No. 8402280622(3pages)  :

J  !

! 5. 04/11/84 Letter from Charles Tramell Re: Summary of Meeting Held on i j 2/23/84 Re: Spirit Lake Blockage and Flooding Potential at ,

Trojan w/ enclosures Attendence List and Viewgraphs

~

Acc. No. 8404250188 (20 pages) l l

! 6. 07/24/84 Letter to William Mayer from L. Laird Re: Spirit Lake  !

l Acc.No.8409060090(2pages) i i

7. 07/31/84 Letter to Jack Lentsch from William Mayer Re: Flood Levels f from Spirit Lake Acc. No. 8409060001(1page)  !

f u

l l

i l

] -

4 f

i j

l 1  !

I i

wh

/ l G ~

l 2-n v Nucear nformadon and Resource Service 1346 Connecticut Avenue NW. 4th Floor. Washington. D C. 20036 (202) 296-7552 OF WM May 8, 1985 C, Mb James M. Felton, Director Division of Rules and Records Office of Adminstration FOIA-BS- 353 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 M(,#d, Sflhf h6 FREEDOM OF INFORMATION ACT REOUEST

Dear Mr. Felton:

Pursuant to the Freedom of Information Act, 5 U.S.C. 522, as amended, the Nuclear Information and Resource Service requests the following documents regarding the Trojan Nuclear Power Plant.

Please consider " documents" to include reports, studies, test results, correspondence, memoranda, meeting notes, meeting minutes, working papers, graphs, charts, diagrams, notes and summaries of conversations and interviews, computer records, and any other forms of written communication, including internal NRC Staff memoranda.

Pursuant to this request, please provide all documents prepared or utilized by, in the possession of, or routed through the NRC related tor

1. Army Corps of Engineers and NRC analyses of the potential for a debris dam blocking the natural outlet of Spirit Lake to rupture and effect the Trojan Nuclear Power Plant and the current status of the permanent tunnel the Corps proposed to install.

In our opinion, it is appropriate in this case for you to waive search charges, pursuant to 5 U.S.C. 552 (a) (4) ( A) "because furnishing the information can be considered as primarily benefiting the general public." The Nuclear Information and Resource Service is a non-profit organization serving local organizations concerned about nuclear power and prc' riding infor-mation to the general public. Information required by 10 CPR 9.14a was provided by letter dated August 3, 1984.

Sincerel ,

%3 i Nina Bell Assistant Director

-?:T G h5LH]t W Wl -