ML20134A157
| ML20134A157 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 09/19/1985 |
| From: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20134A156 | List: |
| References | |
| FC-C-047-85, FC-C-47-85, LIC-85-417, NUDOCS 8511040242 | |
| Download: ML20134A157 (2) | |
Text
-
1 Omaha Pubilt Power District 1623 Harney Omaha. Nebraska 68102-2247 402/536 4000 Sep tenber 19, 1985 L IC-85-417 FC-C-047-85 l
H( W' ~m Mr. E. H. Johnson, Chief Reactor Project Branch I
I U.S. Nuclear Regulatory Connission
[
Region IV Srp 3 0 g 611 Ryan Plaza Drive, Suite 1000 st' Arlington, Texas 76011
~ ~~
Reference:
Docket No. 50-285
Dear Mr. Johnson:
IE Inspection Report 84-28 The Omaha Public Power District received the subject report dated January 24, 1985, which concerned an inspection of the chenistry/radiochenistry program, radiochemistry confirmatory measurements, and whole body counting system con-finnatory measurements for Fort Calhoun Station.
I In order to complete the confirmatory measurements inspection, the NRC request-ed the Radiological and Environnental Sciences Laboratory (RESL) to send OPPD a prepared unknown sample for analysis. Results of the analysis were to be submitted to the NRC for culparison studies. Pursuant to this request, the results of the RESL test sample are given below.
An eight milliliter aliquot was used for the detennination of gamma emitters, a 0.4 milliliter aliquot was used for determination of tritium and a ten milli-leter aliquot was used for the strontium analysis in accordance with Fort Cal-houn Station procedures. The results, decay corrected to January 11, 1985, and with the statistical error given at one (1) sigma are as follows:
Cs-137 2.52 E-5 t 3.03 E-6 uci/ml Co-60 1.52 E-5 ! 2.68 E-6 u i/ml c
i K-40 1.10 E-4 1 2.47 E-5 u i/ml c
Sr-89 3.25 E-4 1.75 E-6 uci/ml S r-90 2.81 E-5 t 4.16 E-7 aci/ml l
1.67 E-5 uci/ml 9511040242 851028 PDR ADOCK 05000285 PDR
-/$ $[
2 (-
--g g s sa
Mr. E. H. Johnson September 19, 1985 Page Two If you have further questions, please notify us.
R. L. Andrews Division Manager Nuclear Production RLA/DJM/rh cc':
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, DC 20036 Mr. E. G. Tourigny, NRC Project Manager Mr. L. A. Yandell, NRC Senior Resident Inspector Fort Calhoun Station Files