Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134M051 + (08:43:51, 12 December 2024)
- ML20134M050 + (08:43:51, 12 December 2024)
- ML20134M048 + (08:43:52, 12 December 2024)
- RBG-43394, Monthly Operating Rept for Oct 1996 for River Bend Station Unit 1 + (08:43:53, 12 December 2024)
- 2CAN029709, Submits follow-up Info Re TS Bases,Enabling on-line Testing of Selected Snubbers + (08:43:54, 12 December 2024)
- ML20134M044 + (08:43:58, 12 December 2024)
- ML20134M043 + (08:43:58, 12 December 2024)
- ML20134M041 + (08:43:59, 12 December 2024)
- 05000341/LER-1995-008, Provides Commitment Made Re Suppl to LER 95-008 Concerning Nonconservative Bias in Heat Balance Methodology for Calculating Core Thermal Power + (08:44:00, 12 December 2024)
- ML20134M038 + (08:44:00, 12 December 2024)
- 2CAN029701, Responds to RAI Re TS Change on Extension of PPS Surveillance Test Interval to 123 Days + (08:44:01, 12 December 2024)
- ML20134M036 + (08:44:02, 12 December 2024)
- ML20134M034 + (08:44:02, 12 December 2024)
- ML20134M033 + (08:44:03, 12 December 2024)
- BSEP-97-0039, Responds to RAI Re Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over SR Equipment + (08:44:04, 12 December 2024)
- ML20134M030 + (08:44:05, 12 December 2024)
- ML20134M027 + (08:44:06, 12 December 2024)
- NRC-96-0116, Submits 10-day Followup Rept Describing Results of Confirmatory Test & Insp Items,As Well as Closeout Summary for Util Response to NRC Bulletin 95-002 + (08:44:06, 12 December 2024)
- BSEP-97-0069, Identifies Five Major Issues as Result of Util Review & Addl Independent Reviews by NRC Re CREVS + (08:44:07, 12 December 2024)
- U-600239, Interim Potential Deficiency Rept 55-84-18 Re ASTM A-36 Plate Matl.Interim Repts Submitted on 850401 & 0703.Safety Significance Evaluation Completed.Addl 30 Days Needed to Finalize Investigation & Submit Final Rept + (08:44:08, 12 December 2024)
- ML20134M020 + (08:44:09, 12 December 2024)
- ML20134M018 + (08:44:10, 12 December 2024)
- ML20134M019 + (08:44:10, 12 December 2024)
- ML20134M017 + (08:44:11, 12 December 2024)
- ML20134M016 + (08:44:12, 12 December 2024)
- ML20134M015 + (08:44:13, 12 December 2024)
- ML20134M013 + (08:44:14, 12 December 2024)
- RBG-43328, Application for Amend to License NPF-47,requesting Mod to Surveillance Requirement 3.8.1.14 to Allow 24-hour Diesel Generator Maint Run While Unit Is in Either Mode 1 or Mode 2 + (08:44:17, 12 December 2024)
- ML20134M009 + (08:44:18, 12 December 2024)
- B16232, Provides Response to RAI Re Proposed Third Party Oversight of Comprehensive Plan for Reviewing & Dispositioning Safety Concerns Raised by Employees + (08:44:19, 12 December 2024)
- ML20134M007 + (08:44:19, 12 December 2024)
- ML20134M006 + (08:44:21, 12 December 2024)
- ML20134M004 + (08:44:22, 12 December 2024)
- 05000482/LER-1996-012, :on 961018,determined That TS Clarification (TSC) 004-86 Was Inappropiate to Circumstances.Cause Indeterminate.Deleted & Removed TSC 004-86 from Control Room Required Reading + (08:44:24, 12 December 2024)
- ML20134M002 + (08:44:26, 12 December 2024)
- 3F0297-14, Informs That CM Smith,Licesne OP-21015,Docket 55-21858,has Changed Her Name to CM Mckim + (08:44:27, 12 December 2024)
- ML20134M001 + (08:44:27, 12 December 2024)
- 05000296/LER-1985-021-02, :on 850730,inadvertent Containment Isolation Occurred Due to Fuse Pulled to Deenergize Valve Circuit to Perform Mod.Caused by Mod Instructions & Tagout Request Not Adequately Addressing All Expected Events + (08:44:29, 12 December 2024)
- ML20134L998 + (08:44:30, 12 December 2024)
- ML20134L997 + (08:44:32, 12 December 2024)
- 05000482/LER-1985-056, :on 850728,control Room Ventilation Isolation Occurred Due to High Chlorine Signal from Chlorine Monitor. Caused by Discoloration on chlorine-sensitive Paper Tape. Tape Replaced & Monitor Recalibr + (08:44:33, 12 December 2024)
- ML20134L994 + (08:44:35, 12 December 2024)
- ML20134L995 + (08:44:35, 12 December 2024)
- 05000327/LER-1985-031-01, :on 850729,auxiliary Bldg Isolation Occurred Due to High Radiation Indicated by Stack Ventilation Monitor.Caused by Leaking Weld at Sample Line Connection Upstream of Valve 62-674.Lines Replaced + (08:44:37, 12 December 2024)
- 05000341/LER-1985-043, :on 850724,Div 1 Core Spray Mode Inoperable Due to Deenergization of RCIC Room Cooler T41-B021. Caused by Cooler Room Control Switch in Off Position. Cooler Returned to Normal + (08:44:39, 12 December 2024)
- ML20134L990 + (08:44:40, 12 December 2024)
- ML20134L989 + (08:44:41, 12 December 2024)
- 05000295/LER-1985-027-04, :on 850726,Procedure CRN-85-357 Re Backfill Feedwater Instrument Sensing Lines Incorrectly Approved. Caused by Employee Error.Procedure Subsequently Approved W/Proper Signatures + (08:44:42, 12 December 2024)
- 3F0297-08, Monthly Operating Rept for Jan 1997 for Crystal River Unit 3 + (08:44:43, 12 December 2024)
- ML20134L985 + (08:44:44, 12 December 2024)
- 05000267/LER-1985-011, :on 850722,Loop 1 Shutdown Initiated by Plant Protective Sys on Loss of Bearing Water.Caused by Mistaken Operation of Bearing Water Surge Tank Level Controller on Loop 1 Bearing Water Surge Tank + (08:44:46, 12 December 2024)