Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HL-5263, Forwards Revised Relief Requests RR-P-10 & RR-P-12 + (07:23:29, 12 December 2024)
- ML20135D322 + (07:23:29, 12 December 2024)
- ML20135D320 + (07:23:30, 12 December 2024)
- ML20135D321 + (07:23:30, 12 December 2024)
- ML20135D317 + (07:23:31, 12 December 2024)
- ML20135D316 + (07:23:32, 12 December 2024)
- IR 05000341/1996006 + (07:23:33, 12 December 2024)
- ML20135D314 + (07:23:33, 12 December 2024)
- ML20135D312 + (07:23:34, 12 December 2024)
- ML20135D310 + (07:23:35, 12 December 2024)
- ML20135D306 + (07:23:36, 12 December 2024)
- 05000366/LER-1985-028-01, :on 850809 & 12 During line-by-line Review of Tech Specs & Implementing Procedures,Personnel Noted Three Surveillance Requirements for high-range Radiation Recorder Not Satisfied After Addition of Amends + (07:23:38, 12 December 2024)
- ML20135D302 + (07:23:39, 12 December 2024)
- NRC-97-0015, Responds to NRC Re Violations Noted in Insp Rept 50-341/96-10.Corrective Actions:Critique of Incident Was Immediately Held & Test Was Then Reperformed Without Further Incident + (07:23:40, 12 December 2024)
- 05000366/LER-1985-029-01, :on 850809,during Update of Seismic Category 1 Structures Settlement Rept,Personnel Noted Structure Settlement Surveillance Not Performed in Jan 1981 & 1984 & Aug 1984.Caused by Procedural Inadequacy + (07:23:42, 12 December 2024)
- ML20135D298 + (07:23:43, 12 December 2024)
- ML20135D295 + (07:23:44, 12 December 2024)
- 05000382/LER-1997-003, :on 970130,process Analog Computer Card Failed on Essential Services Chilled Water Train B.Caused by Open Fuse on Process Analog Control.New Pac Card Installed & Calibrated + (07:23:45, 12 December 2024)
- ML20135D289 + (07:23:47, 12 December 2024)
- ML20135D284 + (07:23:48, 12 December 2024)
- ML20135D282 + (07:23:48, 12 December 2024)
- 05000424/LER-1996-010-01, :on 961101,safety Injection Pump Rendered Inoperable Due to Lack of Motor Cooling.Caused by Improper Gasket Installation & Inadequate Procedural Guidance.Coolers Reassembled Properly & SIP B Returned to Svc + (07:23:50, 12 December 2024)
- ML20135D275 + (07:23:52, 12 December 2024)
- ML20135D274 + (07:23:52, 12 December 2024)
- ML20135D273 + (07:23:53, 12 December 2024)
- ML20135D271 + (07:23:54, 12 December 2024)
- ML20135D270 + (07:23:55, 12 December 2024)
- 05000155/LER-1997-003, :on 970128,demineralized Water Piping Discovered Susceptible to Overpressurization During Dba. Caused by Design Deficiency.Conducted Evaluation of Surge Protection for Piping & Procedures Revised + (07:23:56, 12 December 2024)
- ML20135D268 + (07:23:57, 12 December 2024)
- ML20135D264 + (07:23:59, 12 December 2024)
- ML20135D262 + (07:24:00, 12 December 2024)
- ML20135D261 + (07:24:00, 12 December 2024)
- ML20135D259 + (07:24:01, 12 December 2024)
- ML20135D258 + (07:24:02, 12 December 2024)
- 05000416/LER-1996-004, :on 960606,manual Reactor Scram Occurred Due to Spurious Multiple SRV Lifts.Trip Unit 1C11N655B Was Shipped to Manufacturer for Failure Analysis + (07:24:04, 12 December 2024)
- ML20135D256 + (07:24:05, 12 December 2024)
- ML20135D255 + (07:24:06, 12 December 2024)
- ML20135D253 + (07:24:07, 12 December 2024)
- ML20135D252 + (07:24:08, 12 December 2024)
- ML20135D251 + (07:24:08, 12 December 2024)
- ML20135D250 + (07:24:09, 12 December 2024)
- ML20135D249 + (07:24:10, 12 December 2024)
- ML20135D248 + (07:24:10, 12 December 2024)
- ML20135D244 + (07:24:12, 12 December 2024)
- ML20135D245 + (07:24:12, 12 December 2024)
- ML20135D241 + (07:24:13, 12 December 2024)
- ML20135D243 + (07:24:13, 12 December 2024)
- ML20135D240 + (07:24:14, 12 December 2024)
- ML20135D239 + (07:24:14, 12 December 2024)
- ML20135D237 + (07:24:15, 12 December 2024)
- ML20135D236 + (07:24:16, 12 December 2024)