10 CFR 26.71 l

g Boston Edison Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 L J. Olivier Vice President Nuclear operations

-February 26, 1997 and station oirector SECo Ltr. #2.97-020 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 4

Docket No. 50-293 License No. DPR-35 Submittal of Fitness-For-Duty Prooram Performance Data for Pilorim Nuclear Power Station The enclosed Fitness-For-Duty Program information is submitted in accordance with 10CFR26.71(d).

This submittal contains data' for the period July 1,1996, through December 31,1996.

Please contact me if you have any questions or comments regarding th 'e osed submittal.

[

A=

^

WGL\\dmc\\radmisc\\ffddata I

Attachments: 1) Summary of Management Actions

)

2) Performance Data

}

cc:

Mr Alan B. Wang, Project Manager Project Directorate 1-1 1

Office of Nuclear Reactor Regulation Mail Stop: 14B2 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 l

U.S. Nuclear Regulatory Commission Region i 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector IRENEMmg gg Pilgrim Nuclear Power Station 9703050164 970226 PDR ADOCK 05000293 R

PDR

i u

& Boston Edison Fitness For Duty Performance Data Summary ofManagementActions Six Month Period Ending December 31,1996 At the end of the year, we began preaccess testing for our upcoming outage. This is reflected in the increased number of positive preaccess tests. We had five positive contractor preaccess alcohol tests and one random alcohol positive. Tnere were nine marijuana positives at the 100 ng./ml level and three marijuana positives that were only positive at the 50 ng/ml level. There were two cocaine positives and two contractors refused to test.

License employees had one random cocaine positive that was a repeat test because of a low creatinine value. There was one "for cause" test that was marijuana positive at the 50 ng./ml level bringing the total of positives tests to 24.

Integrity checks revealed that there were 54 specimens having creatinine levels ofless than 200 nanograms per liter. One was positive for marijuana, one was administrative positive for refusing to test, and one was positive due to alcohol. Fifty-one tests were

)

repeated. Nine of these were still low and had to be tested as observed specimens.

J In those areas where there has been a recent history of substance abuse (i.e. DWI's), we

{

have instituted a follow up accelerated testing program.

The percentage of positive tests this period was 2.14%. This is an increase of 1.04% over our last test period.

i i

f aul A. Kee e, M.D.

Medical Review Officer j

LH 2/10/97

'e

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA e

l PERSONNEL SUBJECT TO 10CFR26 i

l l

1 Boston Edison Company 2

o ember 31, 1996 Company 6 Months Ending 3

Pilgrim Nuclear Power Station Location 4

Dr. Paul Keefe 617-424-2372 5

Contact Name-Phone (include area code) 6 Cutoffs: Screen / Confirmation (ng/ml)

Q Appendix A to 10CFR26 Marijuana 50 / ng/ml Amphetamines 1000 / ng/ml j

25 ng/ml Cocaine 300 /ng/ml Phtncyclidine j

j Opiates 300. / ng/ml Alcohol (% BAC)

/

Licensee Employees Long-Term Short-Term Testing Results Contractor Personnel Contractor Personnel Average Number with Unescorted Access 7

734.03 0

261.96 Categories 8

Tested Positive Tested Positive Tested Positive Pre-Access 57 1

0 0

655 20 F

Post accident o

r 0

0 0

0 0

0 C

a u

Observed behavior s

3 1

0 0

0 0

e Random 314 0

18 0

48 1

Follow-up 3

0 1

0 10 0

Other Trans fer 0

0 13 1

0 0

Total 377 2

31 1

713 21

v

.c 5

BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES 9

Marijuans Marijuana Amphe-Phency.

Refusal 50 mg 100 mg Cocaine Opiates tamines clidine Alcohol to Test Licensee Employees 1

0 1

0 0

0 0

0 Contractors 3

9 2

0 0

0 6

2 Total 4

9 3

0 0

0 6

2 24