ML20135D245
| ML20135D245 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/03/1996 |
| From: | Fields M NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20135D247 | List: |
| References | |
| NUDOCS 9612090303 | |
| Download: ML20135D245 (8) | |
Text
._
cnu g
\\
UNITED STATES j
s j
NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. 2006H001
\\,
/
~
SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-361 i
SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 134 License No. NPF-10 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated October 11, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9612090303 961203 DR ADOCK 0500 1
i l
2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment. and i
paragraph 2.C(2) of Facility Oper7 ting License No. NPF-10 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 134, are hereby incorporated in the license.
Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
i 1
3.
This license amendment is effective as of the date of its issuance to be 4
implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Mel B. Fields, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
December 3, 1996 l
I
d ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.134TO FACILITY OPERATING LICENSE NO. NPF-10 l
DOCKET NO. 50-361 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page is identified by Amendment number and contains marginal lines indicating the sreas of change.
REMOVE INSERT 3.9-10 3.9-10 i
f
Refueling Water Level 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Refueling Water Level LCO 3.9.6 Refueling water level shall be maintained 2 23 ft above the top of reactor vessel flange.
NOTE-------------------------------------
Water level may be lowered to a minimum of 23 feet above the top of the fuel for movement of four finger CEAs, coupling and uncoupling of CEA extension shafts or for verifying the coupling and uncoupling.
APPLICABILITY:
During movement of fuel assemblies or CEAs within the reactor pressure vessel when either the fuel assemblies being moved or the fuel assemblies seated within the reactor pressure vessel are irradiated.
During movement of irradiated fuel assemblies within containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Refueling water level A.I Suspend CORE Immediately not within limit.
ALTERATIONS.
8HQ A.2 Suspend movement of Immediately irradiated fuel assemblies within containmant.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.6.1 The refueling water level shall be 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> determined to be at least its minimum required depth.
SAN ONOFRE--UNIT 2 3.9-10 Amendment No. 414,134
p c cucoq$%
UNITED STATES 0
s g
NUCLEAR REGULATORY COMMISSION f
WASHINGTON D.C. 30486 4 001
%...../
SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-362 SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.123 j
License No. NPF-15 l
1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated October 11, 1996, complies with the standards and requirements of the Atomic Energy i
Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I; l
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; I
l C.
There is reasonable assurance (i) that the activities authorized l
by this amendment can be conducted without endangering the health l
and safety of the public, and (ii) that such activities will be l
conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
4
~
m c
2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-15 is hereby amended to read as follows:
(2)
Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 123, are hereby incorporated in the license. Southern California Edison Company shall operate the
-facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance to be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Mel B. Fields, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
December 3,1996
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.123 TO FACILITY OPERATING LICENSE NO. NPF-15 DOCKET NO. 50-362 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page is identified by Amendment number and contains marginal lines indicating the areas of change.
REMOVE INSERT l
l l
3.9-10 3.9-10
(
i i
Refueling Water Level 3.9.6 3.9 REFUELING OPERATIONS l
3.9.6 Refueling Water Level l
LCO 3.9.6 Refueling water level shall be maintained 2 23 ft above the top of reactor vessel flange.
i
NOTE-------------------------------------
Water level may be lowered to a minimum of 23 feet above the top of the fuel for movement of four finger CEAs, coupling and uncoupling of CEA extension i
shafts or for verifying the coupling and uncoupling.
u........
b APPLICABILITY:
During movement of fuel assemblics or CEAs within the reactor pressure vessel when either the fuel assemblies being moved or the fuel assemblies seated within the reactor pressure vessel are irradiated.
During movement of irradiated fuel assemblies within containment.
i l
ACTIONS CONDITION REQUIRED ACTION CONPLETION TINE l
i A.
Refueling water level A.1 Suspend CORE Immediately not within limit.
ALTERATIONS.
2 AliD i
A.2 Suspend movement of Innediately irradiated fuel assemblies within containment.
i 4
SURVEILLANCE REQUIRENENTS SURVEILLANCE FREQUENCY i
4 SR 3.9.6.1 The refueling water level shall be 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 1
determined to be at least its minimum required depth.
4 SAN ONOFRE--UNIT 3 3.9-10 Amendment No. + M,123 d
,