Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137G108 + (04:31:14, 12 December 2024)
- ML20137G107 + (04:31:15, 12 December 2024)
- PNO-IV-85-042, on 850819,manual Reactor Trip Occurred When Main Feedwater Pump B Turbine Speed Governor Failed, Causing Transient.Repairs Underway on Leaking Secondary Handhole of Steam generator.One-wk Outage to End 850726 + (04:31:16, 12 December 2024)
- ML20137G103 + (04:31:16, 12 December 2024)
- ML20137G102 + (04:31:17, 12 December 2024)
- ML20137G100 + (04:31:18, 12 December 2024)
- AECM-85-0242, Responds to Violations Noted in Insp Rept 50-416/85-20. Corrective Actions:Plant Administrative Procedure 01-S-06-24, Safety & Environ Evaluations, Revised + (04:31:19, 12 December 2024)
- ML20137G099 + (04:31:19, 12 December 2024)
- PNO-II-85-078, crack Identified on Weld of 3/4-inch Sample Line Running Off RCS Letdown Line.Weld Crack in Identical Location to One Found on 850729.Weld Repaired.Pipe Supports Being Installed + (04:31:21, 12 December 2024)
- ML20137G089 + (04:31:22, 12 December 2024)
- ML20137G085 + (04:31:23, 12 December 2024)
- IR 05000498/1996022 + (04:31:28, 12 December 2024)
- ML20137G081 + (04:31:28, 12 December 2024)
- IR 05000483/1996004 + (04:31:29, 12 December 2024)
- ML20137G077 + (04:31:32, 12 December 2024)
- ML20137G075 + (04:31:34, 12 December 2024)
- ML20137G067 + (04:31:38, 12 December 2024)
- ML20137G066 + (04:31:39, 12 December 2024)
- ML20137G064 + (04:31:40, 12 December 2024)
- ML20137G055 + (04:31:41, 12 December 2024)
- ML20137G056 + (04:31:41, 12 December 2024)
- ML20137G052 + (04:31:44, 12 December 2024)
- ML20137G048 + (04:31:45, 12 December 2024)
- ML20137G049 + (04:31:45, 12 December 2024)
- ML20137G043 + (04:31:46, 12 December 2024)
- ML20137G042 + (04:31:47, 12 December 2024)
- ML20137G038 + (04:31:48, 12 December 2024)
- ML20137G041 + (04:31:48, 12 December 2024)
- IR 05000213/1985016 + (04:31:50, 12 December 2024)
- ML20137G034 + (04:31:51, 12 December 2024)
- ML20137G032 + (04:31:54, 12 December 2024)
- ML20137G029 + (04:31:55, 12 December 2024)
- ML20137G025 + (04:31:57, 12 December 2024)
- ML20137G027 + (04:31:57, 12 December 2024)
- ML20137G023 + (04:31:58, 12 December 2024)
- ML20137G017 + (04:31:59, 12 December 2024)
- ML20137G014 + (04:32:00, 12 December 2024)
- ML20137G011 + (04:32:00, 12 December 2024)
- ML20137G010 + (04:32:01, 12 December 2024)
- ML20137G003 + (04:32:02, 12 December 2024)
- ML20137F998 + (04:32:04, 12 December 2024)
- ML20137F993 + (04:32:05, 12 December 2024)
- ML20137F992 + (04:32:05, 12 December 2024)
- BSEP-85-1432, Responds to Violation Noted in Insp Repts 50-324/85-16 & 50-325/85-16.Corrective Actions:Periodic Test PT-18.1 Revised to Include Setpoint Verification of Slack Cable Cutoff Interlock.No Proprietary Info Found in Repts + (04:32:06, 12 December 2024)
- ML20137F989 + (04:32:08, 12 December 2024)
- 05000269/LER-1985-011-03, :on 850723,interim Radwaste Ventilation Exhaust Effluent Flow Rate Monitor Declared Inoperable.Caused by Lack of Instrumentation Transmitter Calibr.Interim Radwaste Bldg Ventilation Monitor Repaired + (04:32:10, 12 December 2024)
- ML20137F985 + (04:32:11, 12 December 2024)
- ML20137F983 + (04:32:12, 12 December 2024)
- ML20137F979 + (04:32:13, 12 December 2024)
- ML20137F976 + (04:32:14, 12 December 2024)
- ML20137F974 + (04:32:14, 12 December 2024)
- ML20137F973 + (04:32:15, 12 December 2024)