MONTHYEARML20133D0401985-01-25025 January 1985 Responds to NRC Re Violations Noted in Insp Repts 50-259/84-23,50-260/84-23 & 50-296/84-23.Corrective Actions: Vendor Manual Control Program Being Developed & Implemented to Ensure Plant Procedures Updated W/Current Vendor Info Project stage: Other ML18029A5081985-04-23023 April 1985 Requests Addl Info Re Response to Generic Ltr 83-28,Item 2.2.NUTAC Program Does Not Address Concern Re Interface Between Vendors & Util.Info Requested within 60 Days of Ltr Receipt.Review Encl Project stage: Other ML18029A5971985-06-12012 June 1985 Safety Evaluation Finding Licensee Response to Generic Ltr 83-28,Item 1.2 Re post-trip Review Data & Info Capabilities Acceptable Project stage: Approval ML18029A5941985-06-12012 June 1985 Discusses Review of Util 831107 Response to Generic Ltr 83-28 as Clarified by 850530 & 31 Telcons.Item 1.2 Re post-trip Review Data & Info Capability Acceptable.Safety Evaluation Encl Project stage: Approval ML20127D6641985-06-17017 June 1985 Safety Evaluation Re Licensee Response to Item 1.1 of Generic Ltr 83-28 on post-trip Review Program & Procedures. Post-trip Review Program & Procedures Acceptable Project stage: Approval ML18029A5921985-06-17017 June 1985 Forwards Safety Evaluation Re Response to Item 1.1 of Generic Ltr 83-28 on post-trip Review Program & Procedures. Post-trip Review Program & Procedures Acceptable.Item 1.1 of Generic Ltr 83-28 Resolved Project stage: Approval ML20133K5511985-07-23023 July 1985 Provides Status Update on Util Commitments Re Vendor Manual Control Program Per Insp Repts 50-259/84-23,50-260/84-23 & 50-296/84-23.Phase I Considered Complete.Schedule for Phase II Manuals Will Be Submitted by 850801 Project stage: Other ML20137G1081985-08-0909 August 1985 Submits Schedule for Phase II Vendor Manual Control Program, Per Discussing Insp Repts 50-259/84-23, 50-260/84-23 & 50-296/84-23.Schedule for Vendor Program Will Be Submitted by 851101 Project stage: Other ML18030B2541986-04-14014 April 1986 Forwards Safety Evaluation & Request for Addl Info Re Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1, 3.2.2,3.2.3 & 4.5.1 on ATWS Events.Schedule for Response Requested within 15 Days of Ltr Receipt Project stage: Approval ML18030B2571986-04-14014 April 1986 Safety Evaluation Re Util Responses to Generic Ltr 83-28. Response to Item 4.5.1 Acceptable.Request for Addl Info Re Items 3.1.3,3.1.2,3.2.1 & 3.2.2 Encl Project stage: Approval ML18030B2821986-04-28028 April 1986 Forwards Request for Addl Info Re Util Responses to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Test Requirements for Reactor Trip Sys Reliability.Schedule for Response Requested within 15 Days Project stage: RAI ML18031A4551986-06-0303 June 1986 Informs That Response to Generic Ltr 83-28,Items 3.1.1, 3.1.2,3.2.1,3.2.2 & 4.5.1 Will Be Provided by 860829 Project stage: Other ML18031A4921986-06-12012 June 1986 Informs That Response to 860428 Request for Addl Info Re Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Will Be Provided by 860829 Project stage: Request ML18031A7411986-08-28028 August 1986 Forwards Addl Info Re Generic Ltr 83-28,Items 3.1.1, 3.1.2,3.1.3,3.2.1,3.2.2 & 3.2.3,including Review of Test & Maint Procedures & Tech Specs & Check of Vendor & Engineering Recommendations for Testing & Maint Project stage: Other ML18031A9211986-10-27027 October 1986 Forwards Safety Evaluation Supporting 860808 Response to 860428 Request for Addl Info Re Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Concerning post-maint Testing of Reactor Trip Sys & All Other safety-related Components Project stage: Approval ML18031A9231986-10-27027 October 1986 Safety Evaluation Supporting Util 860808 Response to 860428 Request for Addl Info Re Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Concerning post-maint Testing of Reactor Trip Sys & All Other safety-related Components Project stage: Approval ML18031B0631986-12-0404 December 1986 Forwards Response to Generic Ltr 83-28,Item 3.2.1 Re Review of Test & Maint Procedures & Tech Spec Item 3.2.2 Re Check of Vendor & Engineering Recommendations for Testing & Maint Project stage: Other ML20148K9051988-03-23023 March 1988 Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1 & 3.2.2, Post-Maint Testing of Reactor Trip Sys & All Other Safety-Related Components Project stage: Approval ML18033A8161989-06-28028 June 1989 Forwards List of Submittals Required of Util to Support NRC Decisions Re Restart.Util Will Be Apprised of Need for Addl Info to Resolve Technical Issues If Submittals Incomplete Project stage: Other ML18033B4891990-08-17017 August 1990 Forwards Safety Evaluation & Technical Evaluation Rept EGG-NTA 8341 Considering Actions Per Generic Ltr 83-28,Item 4.5.3 Re Reactor Trip Sys Reliability for Domestic Operating Reactors Project stage: Approval 1986-12-04
[Table View] |
Submits Schedule for Phase II Vendor Manual Control Program, Per Discussing Insp Repts 50-259/84-23, 50-260/84-23 & 50-296/84-23.Schedule for Vendor Program Will Be Submitted by 851101| ML20137G108 |
| Person / Time |
|---|
| Site: |
Browns Ferry  |
|---|
| Issue date: |
08/09/1985 |
|---|
| From: |
Domer J TENNESSEE VALLEY AUTHORITY |
|---|
| To: |
Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
|---|
| References |
|---|
| GL-83-28, TAC-52901, TAC-52902, TAC-52903, TAC-53737, TAC-53738, TAC-53739, TAC-53964, TAC-53965, TAC-53966, NUDOCS 8508270178 |
| Download: ML20137G108 (4) |
|
Text
50-859
@o TENNESSEE VALLEY AUTHORITY Q%
CHATTANOOGA. TENNESSEC 374o1 400 Chestnut Street TowerjIIAUS IS A 9 : 5 i August 9, 1985 U.S. Nuclear Regulatory Conunission Region II ATTN:
Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Dear Dr. Grace:
Please refer to my letter to you dated.fuly 23, 1985, which discussed OIE Inspection Report 84-23 for Browns Ferry regarding Vendor Manual Control Program. Enclosed is a detailed schedulo for phase II manuals. On August 1, 1985, Mike Hellums of my staff and Floyd Cantrell of your staff discussed an extension to August 9, 1985 for submitting this information.
If you have any questions, please get in touch with R. E. Alsup at FTS 858-2725.
To the best of my knowledge, I declare the statements contained herein are complete and true.
Very truly yours, TENNESSEE VALLEY AUTHORITY grylkt J. A. Domer, Chief Nuclear Licensing Branch Enclosure cc:
Mr. James Taylor, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 e
8508270178 850809 PDR ADOCK 05000259 G
PDR An Equal Opportunity Employer gl
r 0
t ENCLOSURE TVA 1: in the process of developing a complete schedule for Phase II of thrs vendor manual program. The priority for adding manuals to the 4
contes 11ed library of vendor manuals is shown on the attached listing of scheduled system order for procedure upgrade. Work on procedures it a!. ready in progress on the first nine systems identified on the list. System 73 (HPCI) will be the next system work is started on.
Manuals for the first 12 systems will be placed under control by December 30, 1985. In addition there are currently 27 referenced l
manuals in the evaluation process for addition to the control program and 76 new manuals. These will also be included in the control program by December 30, 1985.
A status update on the vendor program and a schedule will be provided j
by November 1, 1985, for the next quarter of work.
I 1
I i
l i
i 4
t 6
r s
Priority List For Systems 32/32A Control Air & Drywell Control Air 26 High Press. Fire Protection 57 Auxiliary Electrical 23 RHR Service Water 67 EECW 70 RBCCW 24 Raw Cooling Vater 25 Raw Service Water 90 Radiation Flonitioring 73 HPCI O2 Cond. & Demin Water 39 CO2 63 SLC 75 Core Spray 71 RCIC 82 Diesel Generators 74 RHR 64 Primary Containment 85 CRD 68 Recire System 69 RWCU
~
01 Main Steam. -
18
^ Fuel Oil b2 Neutron Monitoring
!99 RPS 100-6 RWH 100-9 TIP's 65 SMS 30 Ventilation 84 CAD 76 Containment Inerting 46 Feedwater Control 03 Feedwater 78 Fuel Pool Cooling he ee b
- J
+
s e
e 100-1mm Integrated Plant Operations 100-12
'N Operations Necessary for Normal Shutdown from Power 3g to Cold Shutdown
~
100-11 s, Reactor Scram s
100-3 hMelingOperations 100-10 Oper ns with Torus Drained 77 Radwaste 66 Off Gas 28 Intake 27 Condenser Cire. Water 27A Screen Wash 27B Amertap 27C
, Cooling Towers 34 Vacuum Priming 20 Lube Oil Systems 12 Auxiliary Boilers 35 Generator Hydrogen Cooling 47 Turbogenerator 40 Station Drainage 31 AC & Heating of Rx Bldg. Control Bay 44 Building Heating
?
~
~
~