ML20137G003
| ML20137G003 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 08/06/1985 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Butcher E, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20137G007 | List: |
| References | |
| 85-523, NUDOCS 8508270144 | |
| Download: ML20137G003 (3) | |
Text
--
W1rnurL Smrar NuktwquxxttomLkpwtment YkGIWsident Ibst OficeBar26666 r*,
b M CPenitioM OnejamesRiterE%ca Rkhmond Vkgima23261 August 6, 1985 Mr. Harold R. Denton, Directer Serial No.85-523 Office of Nuclear Reactor Regulation N0/EJL:acm Attn:
Mr. Edward J. Butcher, Acting Chief Docket Nos. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:
VIRGINIA POWER NORTH ANNA POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGE Pursuant to 10 CFR 50.90, Virginia Power requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos.
NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2.
As a result of a recent review of the Technical Specifications we have determined that Technical Specification 6.5.3.1(n) is redundant to several of the other requirements listed in Technical Specification 6.5.3.1.
We propose that 6.5.3.1 be changed to eliminate this redundancy.
The propoced changes to the Technical Specifications are provided in Attachments 1 and 2 for Units 1 and 2, respectively. A discussion of the j
proposed
.1.. ages to the Technical Specifications is provided in.
In accordance with 10 CFR Part 170 an Application Fee of
$150 is also enclosed.
This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this change does not pose an unreviewed safety question as defined in 10 CFR 50.59 and does not pose a significant hazards consideration as defined in 10 CFR 50.92.
If you have any questions, or need additional information to process this request, please contact us.
Very truly yours,
/_
k J (tv[
W. L. Stewart
(
p f
I 8508270144 850806 I1 dh{lbr 0
'1 d
PDR ADOCK 05000338 f
iJ P
o.
t3 VIRGINIA POWER Attachments:
1.
Proposed Technical Specification Change for Unit 1 2.
Proposed Technical Specification Change for Unit 2 3.
Discussion of Proposed Changes 4.
Application Fee cc:
Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. M. W. Branch NRC Resident Inspector North Anna Power Station Mr. C. Price Department of Health 109 Governor Street Richmond, Virginia 23219 4
a e
1+
+
i-,.
.-.-,w
,.wv
+-. --
i,,.,-,p----
,,y--
COMMONWEALTH OF VIRGINIA )
)
CITY OF RICHMOND
)
The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W.
L.
Stewart who is Vice President Nuclear Operations, of Virginia Power.
He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledr.d before me this le day of Room \\
19TG s
1 My Commission expires:
4them.s'\\o 19 3 %
(%\\s 2k%
Notaty Public (SEAL) i s/ col n
,.