Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Q394 + (03:26:33, 12 December 2024)
- ML20137Q387 + (03:26:34, 12 December 2024)
- ML20137Q386 + (03:26:35, 12 December 2024)
- IR 05000498/1985001 + (03:26:36, 12 December 2024)
- ML20137Q382 + (03:26:36, 12 December 2024)
- ML20137Q378 + (03:26:37, 12 December 2024)
- ML20137Q375 + (03:26:38, 12 December 2024)
- ML20137Q373 + (03:26:38, 12 December 2024)
- IR 05000461/1985053 + (03:26:48, 12 December 2024)
- ML20137Q367 + (03:26:49, 12 December 2024)
- ML20137Q363 + (03:26:50, 12 December 2024)
- NSD-NRC-97-5048, Confirms Completion of Submittal of Final Documentation Re Ssar,Section 3.2,Classification of Structures,Components & Systems,For Application for AP600 Design Certification + (03:26:50, 12 December 2024)
- ML20137Q362 + (03:26:51, 12 December 2024)
- ML20137Q358 + (03:26:52, 12 December 2024)
- ML20137Q359 + (03:26:52, 12 December 2024)
- NSD-NRC-97-5047, Consolidates Responses & Resolutions of Items Associated W/Ssar Chapter 7 for Application for AP600 Design Certification + (03:26:53, 12 December 2024)
- 05000368/LER-1985-017, :850813,while in Mode 1 at 100% Full Power, Reactor Trip Occurred.Caused by Closing Coil Being Connected to Break Before Make Instead of Make Before Break Auxiliary Switch.Closing Coil Replaced + (03:26:54, 12 December 2024)
- ML20137Q354 + (03:26:55, 12 December 2024)
- ML20137Q350 + (03:26:56, 12 December 2024)
- ML20137Q347 + (03:26:57, 12 December 2024)
- NSD-NRC-97-5053, Confirms Completion of Submittal of Final Documentation Related to Ssar,Chapter 17,Quality Assurance,For Application for AP600 Design Certification + (03:26:57, 12 December 2024)
- ML20137Q346 + (03:26:58, 12 December 2024)
- U-600320, Forwards Variance Request for Reg Guide 1.97, Empirical Determination of Sample Line Loss Correction Factors. Approval Requested for Delaying Empirical Determination of Iodine & Particulate Line Loss Correction Factors + (03:26:59, 12 December 2024)
- ML20137Q344 + (03:26:59, 12 December 2024)
- CY-97-038, Notifies NRC of Change of Status of Sol of Rh Reeves.Sol for Rh Reeves Discontinued + (03:27:00, 12 December 2024)
- IR 05000255/1985018 + (03:27:05, 12 December 2024)
- PNO-I-97-022, on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention + (03:27:06, 12 December 2024)
- ML20137Q337 + (03:27:06, 12 December 2024)
- B11695, Forwards Review of Integrated Safety Assessment Program Topic 1.29, Response to Generic Ltr 81-34, Re Evaluation of Facility Scram Discharge Vol Design Against Guidelines in NUREG-0803.Further Analyses or Mods Unnecessary + (03:27:07, 12 December 2024)
- ML20137Q331 + (03:27:08, 12 December 2024)
- ML20137Q333 + (03:27:08, 12 December 2024)
- IR 05000709/2008012 + (03:27:09, 12 December 2024)
- ML20137Q328 + (03:27:10, 12 December 2024)
- ML20137Q323 + (03:27:10, 12 December 2024)
- ML20137Q320 + (03:27:11, 12 December 2024)
- ML20137Q319 + (03:27:12, 12 December 2024)
- ML20137Q317 + (03:27:12, 12 December 2024)
- ML20137Q316 + (03:27:13, 12 December 2024)
- 05000341/LER-1985-075, :on 851023,Div 1 Emergency Equipment Cooling Water & Svc Water Pumps Automatically Started.Caused by Operator Failure to Reset Digital Load Sequencer.Memo Issued to Personnel Re Procedure Requirements + (03:27:16, 12 December 2024)
- ML20137Q311 + (03:27:17, 12 December 2024)
- ML20137Q305 + (03:27:18, 12 December 2024)
- PNO-I-86-011, on 860201,plant Placed in Commercial Operation. Plant Operating at 99.5% Power.Util Received License to Load Fuel & Conduct Low Power Testing on 841026 & full-power License on 850808 + (03:27:19, 12 December 2024)
- 05000458/LER-1985-025, :on 851024 & 26 Reactor Water Conductivity Measurements Not Taken as Required.Caused by Chemistry & Operations Unaware That Surveillance Required by Tech Specs. Technicians Counseled on Procedures + (03:27:20, 12 December 2024)
- ML20137Q300 + (03:27:21, 12 December 2024)
- ML20137Q296 + (03:27:22, 12 December 2024)
- ML20137Q294 + (03:27:23, 12 December 2024)
- IR 05000424/1985049 + (03:27:24, 12 December 2024)
- ML20137Q290 + (03:27:24, 12 December 2024)
- 05000458/LER-1985-022, :on 851023,Div II RWCU Isolation Occurred. Caused by Failure of Procedure to Specify Terminals to Be Jumpered in Order to Bypass Isolation Signal.Procedure Revised to Identify Correct Set of Connections + (03:27:26, 12 December 2024)
- ML20137Q285 + (03:27:27, 12 December 2024)
- ML20137Q282 + (03:27:28, 12 December 2024)
- ML20137Q281 + (03:27:29, 12 December 2024)