ML20137Q394
| ML20137Q394 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/27/1986 |
| From: | Travers W Office of Nuclear Reactor Regulation |
| To: | Standerfer F GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20137Q397 | List: |
| References | |
| REF-GTECI-A-49, REF-GTECI-RV, TASK-A-49, TASK-OR NUDOCS 8602060196 | |
| Download: ML20137Q394 (2) | |
Text
-
r DISTRIBUTION:
+
?
i Dicket fle&50-320f NRC POR Local PDR TMI HQ r/f TMI Site r/f MN an RHall PGrant RCook CCowgill Docket No. 50-320
[h ler, ELD TBarnhart (4)
LSchneider Mr. F. R. Standerfer JSaltzman Yice President / Director ACRS(16)
Three Mile Island Unit 2 HDenton/DEisenhut GPU Nuclear Corporation ARosenthall ASLAP P. O. Box 480 RLazo, ASLAP f$wnOffice Hiddletown, PA 17057
Dear Mr. Standerfer:
Subject:
Three Mile Island Nuclear Station Unit 2 Operating License No. DPR-73 Docket No. 50-320 License Amendment No. 26 4
The Nuclear Regulatory Comission has amended Facility Operating License No.
DPR-73 to formally incorporate the Recovery Mode Proposed Technical Specifications (PTS), established by the February 11, 1980 Order of the 4
l Director of Nuclear Reactor Regulation, as amended from time to time. This amendment is designated as License Amendment No. 26.
On October 22, 1985, theAtomicSafetyandLicensingBoard(ASLB)wasserved with a joint motion from the Environmental Coalition on Nuclear Power (ECNP),
the NRC staff, and GPU Nuclear Corporation; the remaining parties involved in the Three Mile Island Unit 2 proceeding. This notion requested ASLB a.pproval of the joint stipulation submitted by the parties for the purpose of resolving all remaining proposed contentions.
On November 8,1985, the ASLB issued an order approving the joint stipulation, dismissing ECNP from the proceed 1.ng and dismissing the proceeding. As a result of the temination of the proceeding, the PTS no longer constituted a recognized issae of contention.
The PTS have been revised by several Amendments of Order issued subsequent to the February 11, 1980 Order of the Director of Nuclear Reactor Regulation.
Each Amendment of Order was issued with an accompanying staff safety evaluation and an appropriate environmental review, wnich together provided the basis for our approval of each revision to the PTS. A copy of the PTS, as revised by appropriate Amendments of Order, is enclosed.
i i
s 11r. F. R. Stand;rfer These Technical Specifications are hereby formally incorporated as Appendix A to Facility Operating License DPR-73 as indicated in the enclosed Notice of Issuance of Amndment to Facility Operating License to be published in the Federal Register. This license amendment is effective as of the date of its issuance.
Sincerely, William D. Travers Director T!11-2 Cleanup Project Directorate Enclosurns:
1.
Notice of Issuance of Amendment to Facility Ooerating License 2.
Federal Register Notice 3.
Appendix A Technical Specifications cc:
T. F. Demitt R. E. Rogan S. Levin W. H. Linton J. J. Byrne A. W. Hiller Service Distribution List (seeattached) h emes >. TM..I C P D.....T..D...Q......
.TEICP L.....
= = >.R!lmpgg,..l.Chpp.1pr... M m,. g.
pb.....
k
.!Ilts9.....It$(89..... IIK/89......
wac ratu sie sieveos macu os" OFFICIAL RECORD COPY
]