ML20137Q305

From kanterella
Jump to navigation Jump to search
Forwards Draft Sp 24.324.01 CTG-11-1 Monthly Operability Check, Associated W/Alternative Shutdown Sys
ML20137Q305
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/27/1985
From:
DETROIT EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20137Q310 List:
References
VP-85-0220, VP-85-220, NUDOCS 8512050230
Download: ML20137Q305 (1)


Text

.

Nuclear Operaton Fermk2 hl%Q jf yhMEE6" U

Nuclear Operations November 27, 1985 VP-85-0220 Director of Nuclear Reactor Regulation Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Youngblood:

Reference:

1)

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 2)

Detroit Edison to NRC Letter, " Alternative Shutdown System Procedures", VP-85-0206, dated November 6, 1985

Subject:

Alternative Shutdown System Procedures The attached draft procedure associated with the Alternative Shutdown System is being transmitted for your information as committed in Reference 2.

Since it is a

" Draft", it maybe revised without notice, as testing and

-walkdown of the procedure is accomplished.

Per agreement with Mr.

M. D.

Lynch, we are forwarding three copies'of the attachment.

If you have any questions regarding this matter, please call Mr.

R. L. Woolley at (313).586-4211.

Sincerely, LE[

cc:

.Mr. P. M. Byron Mr. M. D. Lynch

\\

60 3

8512050230 B51127 ADocno5033j1 1;(

1 eDn

-