GPU Nuclear Corporation Nuclear a: ers:;/8o o
Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number January 31, 1986 5211-86-2006 Office of Nuclear Reactor Regulation Attn: John F. Stolz, Director PWR Projects Directorate No. 6 U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
Three Mile Island Nuclear Station Unit 1 (TMI-l)
Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No.150 On January 3,1986, GPU Nuclear submitted Tech. Spec. Change Request No.150, letter no. 5211-85-2207. Enclosed is a revised page 6-17 which should replace page 6-17 from the origiral request.
In the original 6-17 a typo was node in existing wording (3rd and 4th lines) which was not part of the proposed change.
The revised page 6-17 corrects this typo and is now consistent with the existing wording.
The attached page with this revision should be supplenented for the original page 6-17 in all copies of Tech. Spec. Change Request No.150.
Also in the above referenced letter, it was noted that a check would be sent at a later date. This letter encloses that check for $150.00.
Si ncerely,
/'
B602060191 060131 PDR ADOCK 0500 P
H. D. Hukill Director, TMI-l HDH/DVH/spb Enclosures 0462A GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
t GPU Nuclear Corporation Nuclear
- ema:;*
o Middletown, Pennsylvania 17057 0191 717 944-7621 TELEX 84 2386 Writer's Direct Dial Number:
January 27, 1986 5211-86-2206 Office of
-lear Reactor Regulation Attn: John Stolz, Director PWR Projects
- ectorate No. 6 U. S. Nuclear ulatory Commission Washi ngton, D.C.
20555
Dear Mr. Stolz:
Three b le Island Nuclear Station Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Technical ecification Change Request No.150 On January 3,1986, GPU Nucle submitted Tech. Spec. Change Request No.150, letter no. 5211-85-2207. Encl ed is a revised page 6-17 which should replace page 6-17 from the original requ t.
In the original 6-17 a typo was rin in existing wording (3rd and 4th lines) which was not part of the proposed c nge. The revised page 6-17 corrects this typo and is now consistent with existing wording.
The attached page with this revision sho d be supplemented for the original page 6-17 in all copies of Tech. Spec. Cha e Request No.150.
Also in the above referenced letter, it was ted that a check would be sent at a later date. This letter encloses that ch k for $150.00.
Sincere l
H. D. Hukill Director, TM1-1 HDH/DVH/spb l
Enclosures l
0462A GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation i
l
v (2) Steam Generator Tube Inspection within 3 months af t:r Program (See S:ction 4.19.5) conpletion of insp;ctir.n.
(3) Containment Integrated Leak witnin 6 mm6s af ter Rate Test conpletion of test.
(4) Inservice Inspection Program within 6 months af ter five years of operation.
(5) Radioactive Sealed Scurce Leakage within 90 days after Test revealing the presence of completion of test.
> 0.005 microcuries of Removable Contamina tion.
(6) Deleted 6.9.4 ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT NOTE: A single submittal nay be ade for the station. The submittal should conbine those sections that are common to both units at the station however, for units with separate radwaste systems, the submittal shall specifify the release of radioactive material from each unit.
6.9.4.1 Routine radiological environmental operating reports covering the operation of the unit during the previous calendar year shall be submitted prior to May 1 of each year.
6.9.4.2 The annual radiological environmental operating reports shall include sumeries, interpretations, and an analysis of trends of the results of the radiological environnental surveillance activities for the report period, including a comparison with preoperational studies, operational controls (as appropriate), and previous environmental surveillance reports and an assessment of the observed inpacts of the plant operation on the environment. The reports shall also include the results of the land use censuses required by Technical Specification 3.23.2.
If harmful effects of evidence of irreversible dange are detected by the monitoring, the report shall provide an analysis of the problem and a planned course of action to alleviate the problem.
The annual radiological environmental operating reports shall include sumerized and tabulated results in the formt of the Radiological Assessment BTP on the REMP March 1978 of all radiological environmental sanples taken during the report period.
In the event that some results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results.
The missing data shall be submitted as soon as possible in a supplementary report.
The reports shall also include the following: a sumnary description of the radiological environmental monitoring program; a up of all sampling locations keyed to a table giving distances and directions from one reactor; and the results of licensee participation in the 6-17 Amendment Nos. 59, 44, 7/, 7/, 198 1 *2 %