November 19, 1985
/
DISTRTBUTION:
Af6cket No. 50-460 Docket 50-460 NRC PDR Local PDR PRC System Mr. D. W. Mazur LB #4 r/f Managing Director EAdensam Washington Public Power Supply System MDuncan Post Office Box 968 DHood 3000 George Washington Way Attorney, OELD Richland, Washington 99352 JPartlow Edordan
Dear Mr. Mazur:
BGrimes ACRS (16)
Subject:
Interim Technical Evaluation Report and Request for i
Additional Information Regarding Regulatory Guide 1.97 l
Washington Nuclear Project No. 1 By letter dated April 15, 1983, Mr. G. Bouchey responded to NRC Generic l
Letter 82-33 regarding NUREG-0737, Supplement 1, " Requirements for Emergency l
Response Capability" for WNP-1.
For those portions of the NUREG regarding Regulatory Guide 1.97, Revision 2, Mr. Bouchey referred to the FSAR for a detailed description of WNP-l's conformance.
The NRC has reviewed the April 15, 1983, letter and applicable portions of the FSAR with the technical assistance of our contractor, EG&G Idaho, Inc.
The enclosure reflects the current status of our review and is considered to be an interim report. We find (1) WPPSS has provided an explicit commitment on conformances to Regulatory Guide 1.97, except for those items identified by WPPSS, and (2) justification for the exceptions to Regulatory Guide 1.97 for most items is acceptable. However, items in the following sections of the enclosure require additional information and justification prior to acceptable completion of this review:
1.
Information to be provided later -- WPPSS is to provide range and category information for the thirteen listed variables, identify any deviation and justify those identified deviations.
(Section 3.3.1) 2.
Radiation monitoring instrumentation -- environmental qualification should be addressed in accordance with 10 CFR 50.49. (Section 3.3.2) 3.
Heat removal by containment fan heat removal system -- WPPSS should identify the method of monitoring heat removal by the containment fan heat removal system or justify why it is not required.
(Section 3.3.5) 0512050241 851119 PDR ADOCK 05000460 F
f Mr. D. W. Mazur 4.
Make up flow-in -- environmental qualification should be addressed in accordance with 10 CFR 50.49.
(Section 3.3.6) 5.
Letdown flow-out -- environmental qualification should be addressed in accordance with 10 CFR 50.49.
(Section 3.3.7) 6.
Volume control tank level -- environmental qualification should be addressed in accordance with 10 CFR 50.49.
(Section 3.3.8)
Your response to these open items is requested within 60 days. We also invite your comments if the enclosure includes any incorrect assumptions or reflects any misinterpretation of your previous response or commitment. Following resolution of the open items, a safety evaluation will be provided.
Contact Darl Hood, Project Manager, on (301) 492-8408 f f you have any questions.
ihe reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely.
Original Signed by Carl R. Stable for Elinor G. Adensam, Chief Licensing Branch #4 Division of Licensing
Enclosure:
As stated 35)i l
DL:LB #4 t,AjfQLB #4 DL *hN4 DHood/lb/hmc MDur an EAbe
'am ll/gd85 11// /85 11/8 85
Mr. D. W. Mazur WPPSS Nuclear Project No. 1 Washington Public Power Supply System (WNP-1) cc:
Mr. V. Mani Nicholas D. Lewis, Chairman United Engineers & Constructors, Inc.
State of Washington 30 South 17th Street Energy Facility Site Evaluation Philadelphia, Pennsylvania 19101 Council Mail Stop PY-11 Nicholas S. Reynolds, Esq.
Olympia, Washington 98504 Bishop, Liberman, Cook, Purcell and Reynolds 1200 Seventeenth Street, N.W.,
Mr. Eugene Rosolie Suite 700 Coalition for Safe Power Washington, D. C.
20036 Suite 527 408 South West Second Street Mr. E. G. Ward Portland, Oregon 97204 Senior Project Manager Babcock & Wilcox Company Nina Bell P.O. Box 1260 Nuclear Information and Resource Lynchburg, Virginia 23505 Service 1346 Connecticut Avenue, N.W.
Resident Inspector /WPPSS NPS Washington, D. C.
20036 c/o U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, Washington 99352 Mr. R. B. Borsum Nuclear Power Generation Division Babcock & Wilcox 7910 Woodmont Avenue, Suite 220 Bethesda, Maryland 20814 G. E. Craig Doupe Esq.
Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Regional Administrator, Region V U.S. Nuclear Regulatory Commission, 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
- - _.. - _ _ ~., -.. - _ - -
--