Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137S806 + (02:26:36, 12 December 2024)
- ML20137S807 + (02:26:36, 12 December 2024)
- ML20137S805 + (02:26:37, 12 December 2024)
- PNO-III-86-012, on 860211,unidentified Primary Sys Leakage Slightly Above Tech Spec Limit.Leakage Associated W/Leakage Past Valve Seats in Portions of Reactor Depressurization Sys.Maint Outage Planned for 860215 to Correct Leakage + (02:26:38, 12 December 2024)
- ML20137S798 + (02:26:40, 12 December 2024)
- ML20137S799 + (02:26:40, 12 December 2024)
- ML20137S793 + (02:26:41, 12 December 2024)
- ML20137S795 + (02:26:41, 12 December 2024)
- ML20137S792 + (02:26:44, 12 December 2024)
- 05000298/LER-1985-007, :on 850823,HPCI Steam Supply Stop Valve Did Not Open During Daily Operation of HPCI Auxiliary Oil Pump. Caused by Pump Low Suction Pressure Turbine Trip.Pump Pressure Switch Tested & Calibr + (02:26:45, 12 December 2024)
- ML20137S790 + (02:26:46, 12 December 2024)
- ML20137S788 + (02:26:47, 12 December 2024)
- ML20137S784 + (02:26:48, 12 December 2024)
- ML20137S782 + (02:26:49, 12 December 2024)
- IR 05000327/1986002 + (03:00:50, 12 December 2024)
- ML20137S776 + (03:00:51, 12 December 2024)
- ML20137S775 + (03:00:52, 12 December 2024)
- ML20137S773 + (03:01:00, 12 December 2024)
- 05000213/LER-1997-007, :on 970311,potential for Svc Water Sys Water Hammer Following Loss of Normal Power Was Noted.Caused Because Original Design of Plant Did Not Identify Potential for Water Hammer.Check Valve Was Installed + (03:01:02, 12 December 2024)
- ML20137S768 + (03:01:03, 12 December 2024)
- ML20137S767 + (03:01:04, 12 December 2024)
- ML20137S764 + (03:01:05, 12 December 2024)
- W3P85-3174, Application for Amend to License NPF-38,consisting of Tech Spec Change Requests NPF-38-08,NPF-38-09,NPF-38-10,NPF-38-11 & NPF-38-12,deleting Core Protection Calculator Addressable Constants & Correcting Typo in ANSI Std 3.1-1978.Fee Paid + (03:01:06, 12 December 2024)
- ML20137S758 + (03:01:07, 12 December 2024)
- PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks + (03:01:08, 12 December 2024)
- ML20137S756 + (03:01:09, 12 December 2024)
- ML20137S754 + (03:01:10, 12 December 2024)
- ML20137S753 + (03:01:11, 12 December 2024)
- ML20137S751 + (03:01:12, 12 December 2024)
- 05000219/LER-1997-003-01, :on 970311,suppression Pool Bypass Flow Path Was Created During Preventive Maint Due to Inadequate Safety Review.Reviewed & Revised Process for Revising PMs + (03:01:14, 12 December 2024)
- ML20137S746 + (03:01:16, 12 December 2024)
- 05000213/LER-1997-006, :on 970227,liquid Effluent Radiation Monitor Was Determined Inoperable Due to Low Sensitivity.Revised ODCM Methodology for Calculating Monitor Setpoint + (03:01:18, 12 December 2024)
- ML20137S743 + (03:01:19, 12 December 2024)
- BSEP-97-0140, Informs That Util Will Provide Written Responses to RAI Re Seismic Qualification of Mechanical & Electrical Equipment by 970617 + (03:01:20, 12 December 2024)
- ML20137S741 + (03:01:21, 12 December 2024)
- IR 05000333/1985027 + (03:01:22, 12 December 2024)
- ML20137S735 + (03:01:22, 12 December 2024)
- ML20137S734 + (03:01:23, 12 December 2024)
- PNO-II-86-013, on 860205,packaged,unloaded mini-14 Rifle, Being Returned to Security After Repairs,Passed Undetected Through X-ray Search.Region Will Send Security Inspector to Facility on 860210.Util Prepared to Respond to Media + (03:01:24, 12 December 2024)
- ML20137S733 + (03:01:24, 12 December 2024)
- ML20137S731 + (03:01:25, 12 December 2024)
- IR 05000309/1996014 + (03:01:26, 12 December 2024)
- ML20137S724 + (03:01:26, 12 December 2024)
- ML20137S720 + (03:01:27, 12 December 2024)
- ML20137S717 + (03:01:28, 12 December 2024)
- ML20137S712 + (03:01:29, 12 December 2024)
- ML20137S714 + (03:01:29, 12 December 2024)
- RA-97-0042, Requests Extension on Sf Rail Transportation Route Approval, Provided by CE Haughney + (03:01:30, 12 December 2024)
- ML20137S711 + (03:01:30, 12 December 2024)
- NPL-97-0159, Forwards Documentation for Review to Support Restart Issues Identified on Unit 2 Startup Commitment List + (03:01:32, 12 December 2024)
- ML20137S703 + (03:01:33, 12 December 2024)