ML20137S754
| ML20137S754 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/11/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20137S763 | List: |
| References | |
| NUDOCS 8602180113 | |
| Download: ML20137S754 (2) | |
See also: IR 05000327/1986002
Text
-
r.
f;i ,
t;
a
w.
.
FEB 111986
Tennessee Valley Authority
ATTN: Mr. Steven A. White
,j
Manager of Power and
Engineering (Nuclear)~
_
6N38 A Lookout Place
1101 Market-Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT: REPORT NOS. 50-327/86-02 AND 50-328/86-02
On January 6-10, 1986, NRC inspected activities authorized by NRC Operating
License Nos. DPR-77 and-DPR-79 for your Sequoyah facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the -inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
.
will be placed in the NRC's Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
bi g ni dy
[3anbL>A. wisola
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-327/86-02
and 50-328/86-02
cc w/ encl:
(See page 2)
8602180113 B60211
ADOCK 05000327
g
laji
zees
L.
a
.'i
+>>
,
Tennesses Valley Authority
2
.
cc w/ enc 1:
g l. Abercrombie, Sequoyah Nuclear Plant
. Site Director
~
4. R. Wallace, Plant Manager
X. W. Whitt,-Chief, Nuclear
-Safety Review Staff
v0. L. Williams, Jr. , Supervisor
Licensing Section
.
pG. B.' Kirk, Compliance Staff Supervisor
.vd. E. Wills, Project Engineer
bec w/ enc 1:.
- J. A. 01 shin' ski
C R.' D'enton, NRR
~
M.- L. Thompson, NRR
- M. Taylor, IE
,J.B. Hayes,OI
tNRC-Resident Inspector
Document Control. Desk
State of Tennessee
RII
RII
RI
R
-RI
. ECline
RCarroll
SWeise
DCollins
-
GBKuzo:cdg
W
91/2 /86
OV 6,/86
0,1/10 /86
(9/IO/86
02///86
9