Text
.
0 10 CFR 90 Boston Edison Pilgrim Nuclear Power station d
Rocky hill Road Plymouth. Massachusetts 02360 i
E. T. Bouletto, PhD Senior Vice President - Nuclear s
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 Core Ooeratina Limits Reports The attached revision of Pilgrim's Core Operating Limits Report (COLR) is submitted in accordance with the requirements of Pilgrim's Technical Specification 6.9.A.4.d.
Revision #12A provides cycle-specific limits for operating Pilgrim during cycle #12. The core' operating limits in COLR Revision #12A have been established using NRC-approved methodology provided in the documents listed in COLR Section 5.0, References, and in Technical Specification 6.9.A.4.
Should you require further information concerning COLR, Revision 12A, please contact P. M. Kahler at (508) 830-7939.
b E. T. Boulette, PhD PMK/avf/cofr69a4
Attachment:
Pilgrim Nuclear Power Station Core Operating Limits Report, Revision #12A cc: Mr. Alan B. Wang, Project Manager U.S. Nuclear Regulatory Commission Project Directorate 1-3 Region i Q( { f Office of Nuclear Reactor Regulation 475 Allendale Road Mail Stop: OWF 1482 King of Prussia, PA 19406 U. S. Nuclear Regulatory Commission 1 White Flint North Senior Resident inspector 11555 Rockville Pike Pilgrim Nuclear Power Station Rockville, MD 20852 4 t-J 121 9704150227 970409 PDR ADOCK 05000293 P
PDR ggjgggglllglll,[$