Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Y582 + (01:33:12, 12 December 2024)
- ML20137Y580 + (01:33:13, 12 December 2024)
- ML20137Y579 + (01:33:13, 12 December 2024)
- 05000261/LER-1986-007-02, :on 860131,common Hydraulic Fluid Reservoir & Associated Tubing for Each Bank of Four Snubbers Observed to Be Empty.Caused by Improperly Tightened Fitting.Hydraulic Fluid Sys Will Be Pressure Tested + (01:33:15, 12 December 2024)
- B11748, Informs That Preservice Insp of All Piping Welds in Break Exclusion Area Completed & Documented as Acceptable,Per SER Confirmatory Item 7.Results of Insps Will Be Used in Program to Meet ASME Section XI Requirements + (01:33:16, 12 December 2024)
- NG-97-0578, Informs That Implementation of DAEC ITS Planned for Fourth Quarter of 1997 + (01:33:17, 12 December 2024)
- ML20137Y576 + (01:33:17, 12 December 2024)
- ML20137Y573 + (01:33:18, 12 December 2024)
- ML20137Y571 + (01:33:18, 12 December 2024)
- NSD-NRC-97-5066, Forwards Markups of SSAR Subsections 5.4.8 & 3.9.6.2.2 That Address Open Items Associated W/Dser Subsection 3.9.6 That Have Been Closed + (01:33:19, 12 December 2024)
- ML20137Y569 + (01:33:22, 12 December 2024)
- NSD-NRC-97-5069, Requests That Staff Provide Data from Two Rosa Tests AP-BO-01 & AP-CL-04 Which Includes Sys Pressure PRHR Flow, PRHR Inlet & Outlet Fluid Temps,Prhr Tubes Surface Temps & IRWST Temps as Function of Time for Completion of SSAR + (01:33:23, 12 December 2024)
- ML20137Y562 + (01:33:25, 12 December 2024)
- ML20137Y560 + (01:33:26, 12 December 2024)
- PLA-2493, Declines 841217 Request to Participate in Development Project for NRC Emergency Response Data Sys.No Significant Emergency Mgt Benefit Anticipated to Offset Potential Costs Associated W/Involvement in Effort + (01:33:27, 12 December 2024)
- ML20137Y556 + (01:33:27, 12 December 2024)
- ML20137Y555 + (01:33:28, 12 December 2024)
- ML20137Y554 + (01:33:29, 12 December 2024)
- ML20137Y553 + (01:33:29, 12 December 2024)
- ML20137Y550 + (01:33:30, 12 December 2024)
- ML20137Y552 + (01:33:30, 12 December 2024)
- ML20137Y546 + (01:33:31, 12 December 2024)
- ML20137Y545 + (01:33:32, 12 December 2024)
- ML20137Y544 + (01:33:32, 12 December 2024)
- ML20137Y542 + (01:33:33, 12 December 2024)
- ML20137Y540 + (01:33:34, 12 December 2024)
- IR 05000331/1985016 + (01:33:40, 12 December 2024)
- ML20137Y529 + (01:33:42, 12 December 2024)
- ML20137Y530 + (01:33:42, 12 December 2024)
- ML20137Y526 + (01:33:43, 12 December 2024)
- ML20137Y525 + (01:33:43, 12 December 2024)
- ML20137Y524 + (01:33:44, 12 December 2024)
- U-600323, Submits Info Re Status of Design Const & Preoperational Testing Per FSAR & NRC Regulations.Fuel Loading Between Late Feb & Mar 1986 Anticipated.Const Approx 98.5% Complete as of 851130.All Sys Turned Over to Util for Testing + (01:33:45, 12 December 2024)
- ML20137Y518 + (01:33:45, 12 December 2024)
- ML20137Y516 + (01:33:46, 12 December 2024)
- ML20137Y514 + (01:33:47, 12 December 2024)
- ML20137Y513 + (01:33:48, 12 December 2024)
- ML20137Y512 + (01:33:48, 12 December 2024)
- ML20137Y505 + (01:33:49, 12 December 2024)
- ML20137Y507 + (01:33:49, 12 December 2024)
- ML20137Y503 + (01:33:50, 12 December 2024)
- ML20137Y500 + (01:33:51, 12 December 2024)
- ML20137Y498 + (01:33:51, 12 December 2024)
- ML20137Y496 + (01:33:53, 12 December 2024)
- ML20137Y490 + (01:33:53, 12 December 2024)
- 05000237/LER-1986-005-03, :on 860206,reactor Scram Occurred When Operator Placed Reactor Mode Switch from Refuel to Startup.Caused by Faulty Mode Switch.New Design Mode Switches Ordered + (01:33:55, 12 December 2024)
- ML20137Y479 + (01:33:57, 12 December 2024)
- ML20137Y474 + (01:33:58, 12 December 2024)
- ML20137Y478 + (01:33:58, 12 December 2024)
- ML20137Y472 + (01:33:59, 12 December 2024)
- 05000296/LER-1985-019, :on 850725,during Reactor Bldg Ventilation Radiation Monitor Surveillance Testing,Esf Actuation Occurred.Caused by Arc & Isolation Logic Trip Due to Improper Voltmeter Hookup.Procedures Revised + (01:34:04, 12 December 2024)