Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- JAFP-97-0161, Responds to NRC Re Violations Noted in Insp Rept 50-333/97-01.Corrective Actions:Installation of Hose Clamps to Valve Air Actuators Incorporated Into Plants Temporary Mod Control Program + (00:29:37, 12 December 2024)
- ML20138F987 + (00:29:37, 12 December 2024)
- ML20138F985 + (00:29:38, 12 December 2024)
- 05000245/LER-1997-016-01, :on 970401,discovered That Vent/Purge Operation Using Sgts,Opening & Closing Sequence of Atmospheric Control Created Temporary Flow Path Between Reactor Bldg & Primary Containment Prior to Isolation of AC Sys + (00:29:40, 12 December 2024)
- ML20138F982 + (00:29:42, 12 December 2024)
- ML20138F980 + (00:29:44, 12 December 2024)
- 05000245/LER-1997-016, Forwards LER 97-016-00,which Documents an Event That Occurred at Mnps,Unit 1 on 970401.Commitment Made within Ltr,Listed + (00:29:45, 12 December 2024)
- ML20138F977 + (00:29:45, 12 December 2024)
- ML20138F971 + (00:29:46, 12 December 2024)
- ML20138F969 + (00:29:46, 12 December 2024)
- ML20138F968 + (00:29:47, 12 December 2024)
- ST-HL-AE-1457, Forwards Response to Draft SER & FSAR Items for Chapter 12 Re Radiation Monitoring & Protection.Encl marked-up FSAR Pages Will Be Incorporated in Future Amend Unless Otherwise Noted + (00:29:48, 12 December 2024)
- A97003, Responds to NRC Re Violations Noted in Insp Repts 50-295/96-20 & 50-304/96-20.Corrective Actions:Training Dept Will Include Discussion of Event in Licensed & non-licensed Operator Training Programs + (00:29:52, 12 December 2024)
- ML20138F965 + (00:29:52, 12 December 2024)
- ML20138F962 + (00:29:53, 12 December 2024)
- IR 05000250/1991033 + (00:29:55, 12 December 2024)
- ML20138F955 + (00:29:55, 12 December 2024)
- U-600274, Forwards Rev 00 to Dynamic Qualification of Time Delay Relays, in Response to SER Outstanding Issue 7ii & Unresolved Items Identified by Sqrt During Site Visit During Wk of 850827-30 + (00:29:56, 12 December 2024)
- ML20138F953 + (00:29:57, 12 December 2024)
- RBG-22417, Special Rept:On 850914,during Performance of Monthly Channel Check,Triaxial Response Spectrum Recorder Discovered Inoperable Due to Inability to Clear Alarm.Caused by Const Activities in Area + (00:29:58, 12 December 2024)
- ML20138F951 + (00:29:58, 12 December 2024)
- ML20138F945 + (00:29:59, 12 December 2024)
- ML20138F942 + (00:30:00, 12 December 2024)
- PNO-III-97-011, on 970225,radiopharmaceutical Package Exceeds Contamination Limits Occurred.Licensee Notified Medi-Physics Who Performed Surveys of Delivery Vehicle & Driver.Info in Preliminary Notification Reviewed W/Licensee Mgt + (00:30:00, 12 December 2024)
- ML20138F941 + (00:30:01, 12 December 2024)
- ML20138F938 + (00:30:02, 12 December 2024)
- BSEP-97-0104, Requests NRC Concurrence of Plan to Resume Exam Schedule of Table IWB-2500-1 of ASME Code,Section Xi,For Insp of Category E Welds.Evaluation Rept on Weld Overlay Repairs, Encl + (00:30:03, 12 December 2024)
- ML20138F936 + (00:30:03, 12 December 2024)
- ST-HL-AE-5635, Informs That Util Will Submit 30-day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations + (00:30:04, 12 December 2024)
- PNO-III-97-010B, on 970221,plant Containment Spray Pump Found to Be Inoperable During Routine Testing.On 970307,AIT Held Exit Meeting W/Licensee.Ait Concluded That Significant Deficiencies in Oversight of Control Room Found + (00:30:05, 12 December 2024)
- ML20138F930 + (00:30:05, 12 December 2024)
- ML20138F927 + (00:30:06, 12 December 2024)
- ML20138F924 + (00:30:07, 12 December 2024)
- ML20138F925 + (00:30:07, 12 December 2024)
- HL-5374, Responds to NRC Re Violations Noted in Insp Rept 50-321/96-15.Corrective Actions:Involved Personnel Were Counseled Re Errors & Procedure Enhanced + (00:30:08, 12 December 2024)
- ML20138F915 + (00:30:09, 12 December 2024)
- ML20138F918 + (00:30:09, 12 December 2024)
- ML20138F914 + (00:30:10, 12 December 2024)
- ML20138F912 + (00:30:10, 12 December 2024)
- PNO-III-97-010A, on 970221,AIT Dispatched to Zion Station to Review Improper Control Rod Movement Occurred,During Reactor Shutdown.Licensee Also Formed Event Investigation Team Led by J Brons,Comm Ed Vice-President Nuclear Support + (00:30:11, 12 December 2024)
- ML20138F906 + (00:30:12, 12 December 2024)
- ML20138F905 + (00:30:13, 12 December 2024)
- ML20138F904 + (00:30:13, 12 December 2024)
- TXX-4601, Second Interim Part 21 & Deficiency Rept SDAR-202 Re Adequacey of Restraints Provided for Flux Mapping Sys Under Seismic Loads.Initially Reported on 850918.Evaluation Continuing.Completion Expected by 851127 + (00:30:14, 12 December 2024)
- ML20138F900 + (00:30:14, 12 December 2024)
- ST-HL-AE-1544, Forwards marked-up FSAR Page,Identifying Results of Project Analyses of Probability of Missile Strike on Diesel Generator Exhaust + (00:30:15, 12 December 2024)
- ML20138F897 + (00:30:16, 12 December 2024)
- ML20138F895 + (00:30:16, 12 December 2024)
- ML20138F894 + (00:30:17, 12 December 2024)
- 05000366/LER-1997-005-01, :on 970402,unplanned Automatic Engineered Safety Feature Actuation Occurred Due to Personnel Error. Emergency Bus 2F Was Returned to Svc on 970402 + (00:30:19, 12 December 2024)
- ML20138F892 + (00:30:20, 12 December 2024)
- ML20138F886 + (00:30:21, 12 December 2024)