Discusses Licensee 970307 Submittal of License Amend Application,Which Would Revise Section 3/4.7.1.6 of TS to Require Four Instead of Three Operable SG Porvs,Per 970428 Telcon W/Nrc.Util Understanding of Addl Conditions Listed
ML20138F945
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/28/1997
From: Mccollum W
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M98107, TAC-M98108, NUDOCS 9705060108
Download: ML20138F945 (2)


Text

I avrCompany . W w iu R bicCo w V Jk ba Nudear Generation Department - ticc l'rexi, tern 0Concordlabad (SiuJS310200 Offa e irk, SC 3715 (8tajajacS ru DUKEPOWER April 28, 1997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Catawba Nuclear Station, Units 1 and 2 Dockets Nos. 50-413 and 50-414 Additional License Conditions Regarding the Operating License Amendment for the Steam Generator Tube Rupture Evaluation f (TAC Nos. M98107, M98108) l Duke Power Company submitted a license amendment application j dated March 7, 1997 as supplemented on April 2, 10, 16, and j 22, 1997. The proposed amendment revises Section 3/4.7.1.6 l of the Technical Specifications to require four instead of three operable steam generator power operated relief valves (PORVs). Additionally, Section 15.6.3 of the Updated Final i Safety Analysis Report (UFSAR) would require four instead of

! three PORVs and allow credit for local manual operation of l the PORVs.

Per phone conversations with the NRR Project Manager on April 28, 1997, it was identified that upon approval of the license amendment the Facility Operating License (FOL) for Catwaba Unit 1 and 2, NPF-35 and NPF-52 respectively, would j be amended to incorporate two additional license conditions i contained in Appendix D of the FOL.

I Our understanding of the additional license conditions for both Unit 1 and Unit 2 is as follows:

Additional Condition 1:

This amendment requires the licensee to incorporate in the

} Updated Final Safety Analysis Report (UFSAR) certain changes j to the description of the facility. Implementation of this j amendment is the incorporation of these changes as described '

i in the licensee's application dated March 7, 1997 as f supplemented by letters dated April 2, 10, 16, and 22, 1997.

j ,i 9705060108 970428 ) d l PDR ADOCK0500g3 lllllll]lllll(p}llllll]ll g s, e - .....o . .

l . . . . . . . . . . . . . . . . . . .

e-

i I

cument Control Desk Page 2 ,

April 28, 1997 l Implementation date would be the next update of the UFSAR.

Additional Condition 2:

This amendment requires the licensee to use administrative controls, as described in the licensee's letter of March 7, 1997, to restrict the dose-equivalent iodine levels to 0.46 microcurie per gram (in lieu of the limit in TS Section 3.4.8.a), and to 26 microcurie per gram (in lieu of the limit of TS Figure 3.4-1), until this license condition is removed by a future amendment.

Implementation date would be upon date of issuance of the amendment.

These additional conditions have been reviewed. With regard to Additional Condition 2 it is our understanding that should subsequent analyses support the continuation of existing TS dose-equivalent iodine levels of TS 3.4.8.a, and TS Figure 3.4-1, a license amendment would still need to be submitted to remove Additional Condition 2 from the FOL.

If additional information is needed please contact Michael S. Kitlan, Jr. at (803)/831-3205.

Sincerely, 7k A

, William . McCo. lum, Jr.

l xc: l t

! L.A. Reyes, Regional Administrator, Region II l P.S. Tam, Senior Project Manager, ONRR 1

s l

R.J. Freudenberger, Senior Resident Inspector, CNS J