Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13302B956 + (09:29:17, 11 January 2025)
- ML13302B954 + (09:29:18, 11 January 2025)
- ML13302B952 + (09:29:19, 11 January 2025)
- ML13302B949 + (09:29:20, 11 January 2025)
- Press Release-I-13-037, NRC Assigns New Resident Inspectors to Susquehanna Nuclear Power Plant + (09:29:21, 11 January 2025)
- ML13302B946 + (09:29:22, 11 January 2025)
- ML13302B937 + (09:29:23, 11 January 2025)
- ML13302B936 + (09:29:23, 11 January 2025)
- ML13302B934 + (09:29:24, 11 January 2025)
- ML13302B933 + (09:29:25, 11 January 2025)
- ML13302B932 + (09:29:26, 11 January 2025)
- ML13302B931 + (09:29:27, 11 January 2025)
- ML13302B930 + (09:29:28, 11 January 2025)
- ML13302B928 + (09:29:29, 11 January 2025)
- ML13302B926 + (09:29:30, 11 January 2025)
- ML13302B924 + (09:29:31, 11 January 2025)
- ML13302B922 + (09:29:32, 11 January 2025)
- ML13302B911 + (09:29:33, 11 January 2025)
- ML13302B903 + (09:29:34, 11 January 2025)
- ML13302B902 + (09:29:34, 11 January 2025)
- ML13302B896 + (09:29:35, 11 January 2025)
- ML13302B895 + (09:29:36, 11 January 2025)
- ML13302B893 + (09:29:36, 11 January 2025)
- ML13302B892 + (09:29:37, 11 January 2025)
- ML13302B891 + (09:29:37, 11 January 2025)
- DCL-13-103, Response to NRC Request for Additional Information Regarding Implementation of Multi-Unit/Multi-Source Dose Assessment Capability + (09:29:38, 11 January 2025)
- ML13302B869 + (09:29:39, 11 January 2025)
- ML13302B858 + (09:29:40, 11 January 2025)
- ML13302B851 + (09:29:41, 11 January 2025)
- ML13302B835 + (09:29:42, 11 January 2025)
- ML13302B831 + (09:29:43, 11 January 2025)
- ML13302B829 + (09:29:50, 11 January 2025)
- ML13302B822 + (09:29:51, 11 January 2025)
- ML13302B816 + (09:29:52, 11 January 2025)
- ML13302B811 + (09:29:53, 11 January 2025)
- TAC:72164 + (09:29:54, 11 January 2025)
- ML13302B806 + (09:29:55, 11 January 2025)
- ML13302B804 + (09:29:56, 11 January 2025)
- ML13302B801 + (09:29:57, 11 January 2025)
- ML13302B800 + (09:29:58, 11 January 2025)
- TAC:74308 + (09:29:59, 11 January 2025)
- ML13302B768 + (09:30:00, 11 January 2025)
- PNO-V-89-068, on 891201,hydrogen Fire in Radwaste Bldg Occurred During Changeout of Relief Valve on Waste Gas Decay Tank.No Injury or Equipment Damage Occurred.Cause Evaluation Being Conducted Prior to Resuming Work on Sys + (09:30:02, 11 January 2025)
- TAC:73199 + (09:30:03, 11 January 2025)
- ML13302B750 + (09:30:04, 11 January 2025)
- PNO-V-89-028, on 890512,primary-to-secondary Leak Rate of 117 Gallons Per Day Occurred.On 890513,steam Generator Blowdown Radiation Monitor Indication Increased One Decade.Reactor Shut Down & mid-loop Will Be Drained to Repair Leaking Tube + (09:30:06, 11 January 2025)
- ML13302B700 + (09:30:07, 11 January 2025)
- PNO-V-89-014, on 890209,panel Annunciators Illuminated Before Startup Which Indicated Core Protection Calculators to Be Inoperable,But Crew Observed That Console Indications Were Normal.Licensee Investigation Still in Progress + (09:30:09, 11 January 2025)
- PNO-V-89-006, on 890111,plant Shutdown Required by Tech Specs Due to Inoperable motor-driven Auxiliary Feedwater Pump.Pump Motor Sent to Offsite Facility for Repair & Possibly Rewinding + (09:30:11, 11 January 2025)
- NLS2013095, 10 CFR 72.48(d)(2) Summary Report + (09:30:12, 11 January 2025)
- RBG-47402, Eighteenth Fuel Cycle Core Operating Limits Report (Colr), Revision 1 + (09:30:13, 11 January 2025)