ML13302B851
| ML13302B851 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 06/22/1992 |
| From: | Fields M Office of Nuclear Reactor Regulation |
| To: | Rosenblum R Southern California Edison Co |
| References | |
| GL-88-020, TAC-M83671, TAC-M83672 NUDOCS 9206290141 | |
| Download: ML13302B851 (4) | |
Text
10,kREG~j UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 June 22, 1992 Docket Nos. 50-361 and 50-362 Mr. R. M. Rosenblum Manager of Nuclear Regulatory Affairs Southern California Edison Company 23 Parker Street Irvine, California 92718
Dear Mr. Rosenblum:
SUBJECT:
REVIEW OF RESPONSE TO GENERIC LETTER 88-20, SUPPLEMENT NO. 4 INDIVIDUAL PLANT EXAMINATIONS FOR EXTERNAL EVENTS - SAN ONOFRE UNIT NOS. 1 AND 2 (TAC NOS. M83671 AND M83672)
Supplement 4 to Generic Letter 88-20 was issued on June 28, 1991, to require each licensee and each Construction Permit holder to conduct an individual plant examination of external events (IPEEE).
Guidance was provided with the generic letter supplement in the form of NUREG-1407, "Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities."
The supplement requested a 180-day response (December 26, 1991) that would (1) identify the method and approach selected for the IPEEE, 2) describe the method to be used if it has not previously been submitted for staff review, and 3) identify the milestones and schedule for performing the IPEEE and submittal of the results to the NRC.
Licensees were requested in the supplement to submit the IPEEE results to the NRC for review by June 28, 1994, (3 years after issuance of the supplement) to ensure that the intent of the Commission's Severe Accident Policy Statement will be met by mid-1995.
We have reviewed your letter dated June 9, 1992, submitted in response to Generic Letter 88-20, Supplement 4. We find that your selected IPEEE methods are acceptable. However, your submittal schedule is beyond the NRC's target date of June 1994. This could impact the schedule for closure of severe accident issues. Therefore, the staff requests that you reassess your opportunities for submitting your IPEEE results *on a more expeditious schedule, preferably either in 1994 or early 1995 but no later than June 1, 1995. Also, by doing so, your efforts will more closely reflect the level of safety significance attributed to this effort by the Commission when the goal of closing severe accident issues by June 1995 was established.
9206290141 920622
-P PDR ADOCK 05000361 P
Mr. R. M. Rosenblum
- 2 Please inform us of any changes in either the schedule or methodology.
Sincerely, Mel Fields, Project Manager Project Directorate V Division of Reactor Projects -
III/IV/V Office of Nuclear Reactor Regulation cc:
See next page
Messrs. Ray and Guiles San Onofre Nuclear Generating Southern California Edison Company Station, Unit Nos. 2 and 3 cc:
James A. Beoletto, Esq.
Mr. Richard J. Kosiba, Project Manager Southern California Edison Company Bechtel Power Corporation Irvine Operations Center 12440 E. Imperial Highway 23 Parker Street Norwalk, California 90650 Irvine, California 92718 Mr. Robert G. Lacy Chairman, Board of Supervisors Manager, Nuclear Department County of San Diego San Diego Gas & Electric Company 1600 Pacific Highway, Room 335 P. 0. Box 1831 San Diego, California 92101 San Diego, California 92112 Alan R. Watts, Esq.
Mr. Hank Kocol Rourke & Woodruff RadiologicHealth Branch 701 S. Parker St. No. 7000 State Department of Health Services Orange, California 92668-4702 Post Office Box 942732 Sacremento, California 94234 Mr. Sherwin Harris Resource Project Manager Public Utilities Department City of Riverside Resident Inspector/San Onofre NPS 3900 Main Street do U.S. Nuclear Regulatory Commission Riverside, California 92522 Post Office Box 4329 San Clemente, California 92674 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering Nuclear Power Mayor 12300 Twinbrook Parkway, Suite 330 City of San Clemente Rockville, Maryland 20852 100 Avenida Presidio San Clemente, California 92672 Mr. Phil Johnson Regional Administrator, Region V U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Walnut Creek, California 94596 Mr. Don J. Womeldorf Mr. Harold B. Ray Chief, Environmental Management Branch Senior Vice President California Department of Health Services Southern California Edison Co.
714 P Street, Room 616 Irvine Operations Center Sacramento, California 95814 23 Parker Street Irvine, California 92718 Mr. Edwin A. Guiles Vice President Engineering and Operations San Diego Gas & Electric Co.
101 Ash Street San Diego, California 92112
Mr. R. M. Rosenblum 2 -
June 22, 1992 Please inform us of any changes in either the schedule or methodology.
Sincerely, Mel Fields, Project Manager Project Directorate V Division of Reactor Projects -
III/IV/V Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION:
ok etEile)
NRC & Local PDRs.
BBoger MVirgilio TQuay DFoster MFields OGC, 15B18 ACRS (10) P315 PDV Plant File PDV Reading File RZimmerman, RV CAder, NLS324 JChen, NLS324 RHernan, 14C7 OFC PDV/LA PDV/PM, PDV/D NAME DFoster M F 4 TQuay DATE 2,/92
/02/92 C>/f,2f92 OFFICIAL RECORD COPY DOCUMENT NAME:
SOIPEEE.LTR