ML13302B891

From kanterella
Jump to navigation Jump to search
Listing of North Anna, Units 1 and 2 TS Basis Changes
ML13302B891
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/02/2013
From:
Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML13302B894 List:
References
13-518
Download: ML13302B891 (1)


Text

Listing of North Anna Units 1 and 2 Technical Specifications Basis Changes for the period of 10/1/2012 through 9/30/2013 Approval Affected Revision TSCR Date Pages Description Bases Revision 49 N-086 01/28/13 B3.4.20-3 Revises the TSs requirements regarding B3.4.20-5 steam generator tube inspections and B3.4.20-6 reporting as described in TSTF-510, Revision B3.4.20-7 2, "Revision to Steam Generator Program B3.4.20-8 Inspection Frequencies and Tube Sample Selection." The changes are consistent with NRC-approved Industry TSTF Standard Technical Specifications change TSTF-51 0, Revision2.

Bases Revision 50 N-078 11/20/12 3.3.1-25 Revises the TSs (for Unit 2 only)* by B3.3.1-26 deleting the Steam Generator Water Level B3.3.1-27 Low Coincident with Steam Flow/Feedwater B3.3.1-28 Flow Mismatch Reactor Trip Function from B3.3.1-29 the TS Table 3.3.1-1.

B3.3.1-30

  • Unit1 will not be implemented until B3.3.1-31 modifications are completed in the fall 2013 B3.3.1-32 RFO B3.3.1-33 B 3.3.1-39 Bases Revision 51 N-090 09/09/13 B3.7.10-4 This change will allow credit to be taken for Control Room isolation and filtered makeup air in order for all cases to meet the regulatory and 50.59 dose limits for Technical Specification Bases Section B 3.7.10 Main Control Room/Emergency Switchgear Room (MCR/ESGR) Emergency Ventilation System (EVS).