Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13331A913 + (05:53:54, 11 January 2025)
- NRC 2013-0105, 10 CFR 50.55a Request, Relief Request RR-5 Examination of the Pressurizer Surge Nozzle Inner Corner Region Fifth Ten-Year Inservice Inspection Program Interval + (05:53:55, 11 January 2025)
- ML13331A909 + (05:53:58, 11 January 2025)
- ML13331A907 + (05:54:00, 11 January 2025)
- ML13331A904 + (05:54:01, 11 January 2025)
- ML13331A903 + (05:54:02, 11 January 2025)
- ML13331A901 + (05:54:03, 11 January 2025)
- ML13331A899 + (05:54:05, 11 January 2025)
- TAC:62164 + (05:54:06, 11 January 2025)
- ML13331A898 + (05:54:07, 11 January 2025)
- ML13331A897 + (05:54:08, 11 January 2025)
- ML13331A895 + (05:54:09, 11 January 2025)
- TAC:63317 + (05:54:10, 11 January 2025)
- ML13331A894 + (05:54:11, 11 January 2025)
- ML13331A892 + (05:54:12, 11 January 2025)
- ML13331A891 + (05:54:14, 11 January 2025)
- ML13331A889 + (05:54:15, 11 January 2025)
- ML13331A888 + (05:54:16, 11 January 2025)
- ML13331A886 + (05:54:17, 11 January 2025)
- ML13331A885 + (05:54:18, 11 January 2025)
- ML13331A884 + (05:54:20, 11 January 2025)
- ML13331A882 + (05:54:22, 11 January 2025)
- ML13331A881 + (05:54:23, 11 January 2025)
- ML13331A879 + (05:54:24, 11 January 2025)
- ML13331A878 + (05:54:25, 11 January 2025)
- ML13331A877 + (05:54:26, 11 January 2025)
- TAC:61453 + (05:54:27, 11 January 2025)
- ML13331A876 + (05:54:27, 11 January 2025)
- ML13331A874 + (05:54:29, 11 January 2025)
- ML13331A872 + (05:54:31, 11 January 2025)
- L-85-019, Forwards Application for Amend 134 to License DPR-13, Consisting of Proposed Change 157 Revising Tech Spec Sections 3.1.1,6.9 & 1.0 & Table 4.1.2,per Generic Ltr 85-19.Fee Paid + (05:54:32, 11 January 2025)
- ML13331A868 + (05:54:34, 11 January 2025)
- ML13331A867 + (05:54:35, 11 January 2025)
- ML13331A865 + (05:54:39, 11 January 2025)
- TAC:61130 + (05:54:43, 11 January 2025)
- ML13331A864 + (05:54:44, 11 January 2025)
- ML13331A863 + (05:54:45, 11 January 2025)
- ML13331A861 + (05:54:47, 11 January 2025)
- 05000206/LER-1991-013, :on 910701,actuation of Halon Fire Suppression Sys in Switchgear Room Occurred.Caused by Incorrectly Connected Actuation Lines.Actuation Lines Properly Connected.Conduit Fittings Sealed W/Rtv + (05:54:49, 11 January 2025)
- ML13331A859 + (05:54:50, 11 January 2025)
- 05000206/LER-1991-012, :on 910312,air Operated Valves Declared Inoperable.Caused by Backup Nitrogen Sys Leakage.Actuator Diaphragm Casing Bolts Were Torqued to Required Valve to Stop Leaking.W/Undated Ltr + (05:54:52, 11 January 2025)
- 05000206/LER-1991-011, :on 910604,locking Device for Circuit Breaker S1-8-1122 Discovered Improperly Installed from 910309 to 0422 & from 910518 to 910604.Caused by Lack of Appropriate Training.Breaker Properly Locked + (05:54:54, 11 January 2025)
- 05000206/LER-1991-010, :on 910528,2 of 12 Control Bank 1 Control Alarms Dropped Into Core & Reactor Manually Tripped.Caused by Open Connection in half-voltage Resistor Network.Jumper & Lugs Replaced w/in-kind Parts + (05:54:56, 11 January 2025)
- PNO-V-91-013, on 910628,earthquake Measuring 6.0 on Richter Scale Occurred.Walkdown of Facility Disclosed No Damage. Quake Did Trigger Seismic Scram Circuitry for Reactor. Appropriate Authorities Notified + (05:54:58, 11 January 2025)
- 05000206/LER-1990-021, :on 900704,containment Spray Sys Air Flow Test Indicated Blockage of Several Nozzles Due to Pipe Wall Coating Matl Aging.Affected Containment Spray Sys Piping & Nozzles Cleaned + (05:55:00, 11 January 2025)
- TAC:69967 + (05:55:01, 11 January 2025)
- ML13331A851 + (05:55:02, 11 January 2025)
- ML13331A850 + (05:55:03, 11 January 2025)
- ML13331A848 + (05:55:07, 11 January 2025)
- ML13331A847 + (05:55:09, 11 January 2025)
- ML13331A846 + (05:55:10, 11 January 2025)
- ML13331A845 + (05:55:11, 11 January 2025)