Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138L897 + (23:48:01, 11 December 2024)
- ML20138L895 + (23:48:02, 11 December 2024)
- ML20138L896 + (23:48:02, 11 December 2024)
- ML20138L892 + (23:48:03, 11 December 2024)
- ST-HL-AE-1532, Forwards Response to Draft SER Open Item D 2.4-5 Re Section 2.4.14 on Flood Protection + (23:48:03, 11 December 2024)
- ML20138L889 + (23:48:04, 11 December 2024)
- ML20138L884 + (23:48:05, 11 December 2024)
- ML20138L885 + (23:48:05, 11 December 2024)
- ML20138L878 + (23:48:06, 11 December 2024)
- ML20138L869 + (23:48:07, 11 December 2024)
- ML20138L874 + (23:48:07, 11 December 2024)
- ML20138L864 + (23:48:08, 11 December 2024)
- ML20138L858 + (23:48:09, 11 December 2024)
- RBG-22-341, Ro:On 851012,fire Occurred at Fancy Point 500 Kv Switchyard. Caused by Apparent Lightning Strike.Fire Extinguished. Damaged Equipment to Be Replaced.Investigation & Evaluation of Emergency Plan Ongoing + (23:48:09, 11 December 2024)
- ML20138L855 + (23:48:11, 11 December 2024)
- ML20138L856 + (23:48:11, 11 December 2024)
- PNO-III-97-009, on 970221,contaminated Scrap Metal Occurred. Licensee Also Indicated Addl Scrap Metal Located at Il Railroad Supply Co in Cordova,Il.Nrc Inspectors Monitored Licensee Activities Surrounding Incident + (23:48:12, 11 December 2024)
- ML20138L854 + (23:48:12, 11 December 2024)
- ML20138L850 + (23:48:13, 11 December 2024)
- ML20138L845 + (23:48:14, 11 December 2024)
- ML20138L846 + (23:48:14, 11 December 2024)
- ML20138L843 + (23:48:15, 11 December 2024)
- LIC-97-0010, Forwards Response to Violations Noted in Insp Rept 50-285/96-07.Corrective Actions:Immediately After Security Insp in Aug of 1996,audit of Active Badging Records Was Conducted by Util Security Dept + (23:48:16, 11 December 2024)
- B16248, Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station Unit 1 + (23:48:20, 11 December 2024)
- HBL-85-059, Forwards Rev 1 to Humboldt Bay Power Plant Unit 3 - Safstor QA Plan, Replacing Attachment 4 of 840731 Decommissioning Plan.Basis for & Description of Approach Included + (23:48:20, 11 December 2024)
- ML20138L833 + (23:48:21, 11 December 2024)
- B16241, Monthly Operating Rept for Jan 1997 for Millstone Nuclear Power Station Unit 2 + (23:48:22, 11 December 2024)
- ML20138L832 + (23:48:22, 11 December 2024)
- ML20138L830 + (23:48:23, 11 December 2024)
- BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 + (23:48:24, 11 December 2024)
- ML20138L826 + (23:48:24, 11 December 2024)
- ML20138L821 + (23:48:26, 11 December 2024)
- IR 05000326/2009009 + (23:48:27, 11 December 2024)
- PNO-II-85-118, on 851212,oil Spilled Into Tennessee River When Site Glass Failed on Traveling Screen Gear Box on Cold Water Pump.Immediate Cleanup Action Initiated.All Units Shut Down While Environ Activities Conducted + (23:48:28, 11 December 2024)
- ML20138L818 + (23:48:28, 11 December 2024)
- ML20138L814 + (23:48:30, 11 December 2024)
- ML20138L815 + (23:48:30, 11 December 2024)
- 2CAN029708, Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 2 + (23:48:31, 11 December 2024)
- 05000461/LER-1996-012, :on 910316,failed to Demonstrate Operability of Offsite Power Sources within One Hr During Surveillance While Div 3 EDG Governor Speed Droop Control Set to 50% Due to Inadequate Procedures.Revised Procedures + (23:48:33, 11 December 2024)
- ML20138L807 + (23:48:35, 11 December 2024)
- ML20138L808 + (23:48:35, 11 December 2024)
- 1CAN029703, Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 1 + (23:48:36, 11 December 2024)
- ML20138L803 + (23:48:36, 11 December 2024)
- ML20138L802 + (23:48:37, 11 December 2024)
- ML20138L801 + (23:48:38, 11 December 2024)
- ML20138L800 + (23:48:38, 11 December 2024)
- U-600370, Forwards Response to Unresolved Items Identified by Sqrt 850827-30 Insp Concerning SER Outstanding Issue 7ii, Seismic & Dynamic Qualification of Equipment. Response to Sqrt Open Items NSSS 3.1,BOP 2.1 & 2.2 Also Encl + (23:48:39, 11 December 2024)
- ML20138L796 + (23:48:40, 11 December 2024)
- ML20138L794 + (23:48:40, 11 December 2024)
- ML20138L792 + (23:48:41, 11 December 2024)
- ML20138L790 + (23:48:41, 11 December 2024)
- ML20138L788 + (23:48:42, 11 December 2024)