Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138Q870 + (22:51:35, 11 December 2024)
- ML20138Q866 + (22:51:36, 11 December 2024)
- ML20138Q869 + (22:51:36, 11 December 2024)
- ML20138Q864 + (22:51:37, 11 December 2024)
- 05000302/LER-1985-022, :on 851013,half-trip Signal Received on Channel B of Emergency Feedwater Initiation & Control Sys for Main Steamline Isolation from once-through Steam Generator B. Source of Signal Could Not Be Determined + (22:51:39, 11 December 2024)
- ML20138Q861 + (22:51:40, 11 December 2024)
- ML20138Q862 + (22:51:40, 11 December 2024)
- ML20138Q858 + (22:51:42, 11 December 2024)
- ML20138Q859 + (22:51:42, 11 December 2024)
- 05000458/LER-1985-008, :on 850923,during Refueling,Reactor Protection Sys Actuated Due to Water Level Below Level 3 Scram Setpoint.Caused by Inadequate Procedure & Operator Error. Reactor Pressure Vessel Level Reestablished + (22:51:44, 11 December 2024)
- ML20138Q856 + (22:51:45, 11 December 2024)
- ML20138Q854 + (22:51:46, 11 December 2024)
- ML20138Q851 + (22:51:46, 11 December 2024)
- ML20138Q849 + (22:51:47, 11 December 2024)
- 05000382/LER-1985-044, :on 851010,uncomplicated Reactor Trip Occurred. Caused by High Water Level in Steam Generator 2 When Control Board Operator Increased Feedwater Flow to Steam Generators. New Guidelines Issued + (22:51:49, 11 December 2024)
- ML20138Q845 + (22:51:54, 11 December 2024)
- 05000454/LER-1985-090, :on 851009,reactor Tripped Due to False Low Flow Signals from RCS Loop 1D.Caused by Venting Loop Flow Transmitter.Calibr of Reactor Coolant Flow Loop Being Revised to Restrict Work on Transmitters + (22:51:56, 11 December 2024)
- ML20138Q842 + (22:51:57, 11 December 2024)
- IR 05000424/1985035 + (22:52:47, 11 December 2024)
- PY-CEI-NRR-0381, Forwards Addendum to Rev 2 to Control of Heavy Loads Study. Addendum Adds Variable Test Weight Used to Calibr Refueling Platform Interlocks + (22:52:48, 11 December 2024)
- ML20138Q837 + (22:52:49, 11 December 2024)
- ML20138Q834 + (22:52:49, 11 December 2024)
- ML20138Q833 + (22:52:50, 11 December 2024)
- ML20138Q832 + (22:52:52, 11 December 2024)
- ML20138Q830 + (22:52:53, 11 December 2024)
- ML20138Q826 + (22:52:59, 11 December 2024)
- ML20138Q825 + (22:53:00, 11 December 2024)
- ML20138Q823 + (22:53:02, 11 December 2024)
- 05000352/LER-1985-079, :on 851008,standby Liquid Control Sys Received Unexpected Actuation Signal & RWCU Sys Received Automatic Isolation Signal.Caused by Design Deficiency.Rwcu Sys Placed in Svc & Reset + (22:53:04, 11 December 2024)
- ML20138Q815 + (22:53:06, 11 December 2024)
- ML20138Q813 + (22:53:08, 11 December 2024)
- 05000362/LER-1985-031-01, :on 851008,10 & 26,w/plant in Mode 6 During Refueling,Fuel Handling Isolation Sys Actuated by Signal from Vent Airborne Process Radiation Monitors.Caused by Increase of Low Level Activity + (22:53:12, 11 December 2024)
- ML20138Q809 + (22:53:14, 11 December 2024)
- ML20138Q808 + (22:53:15, 11 December 2024)
- 05000374/LER-1985-043-02, :on 851010,vacuum Breaker 2PC001A Opened & Closed,Equalizing Pressure Difference Between Primary Containment Drywell & Suppression Chamber.Cause Unknown + (22:53:18, 11 December 2024)
- IR 05000354/1985060 + (22:53:20, 11 December 2024)
- ML20138Q802 + (22:53:27, 11 December 2024)
- ML20138Q799 + (22:53:29, 11 December 2024)
- ML20138Q796 + (22:53:30, 11 December 2024)
- ML20138Q795 + (22:53:32, 11 December 2024)
- IR 05000057/1985002 + (22:53:34, 11 December 2024)
- 05000483/LER-1985-035, :on 850624,0726 & 0801,while at 100% Reactor Power,Several Violations of Tech Spec 3.7.11 Occurred.Caused by Personnel Error.Fire Barrier Procedures Will Be Reviewed. Addl Training Will Be Provided + (22:53:39, 11 December 2024)
- ML20138Q789 + (22:53:42, 11 December 2024)
- IR 05000334/1985024 + (22:53:54, 11 December 2024)
- ML20138Q782 + (22:53:56, 11 December 2024)
- 05000335/LER-1985-008-03, :on 850929,25% Time Extension Specified by Tech Specs for Quarterly MSIV part-stoke Surveillance Test Exceeded.Caused by Personnel Error.Surveillance Performed. Operator Counseled + (22:54:05, 11 December 2024)
- 05000324/LER-1985-010-02, :on 851009,logic Sys Functional Test Did Not Verify Bypass of 40% Main Steam Isolation Function.Caused by Failure to Recognize Subj Testing Requirement.Function Verified on 851017.Review in Progress + (22:54:12, 11 December 2024)
- ML20138Q764 + (22:54:16, 11 December 2024)
- 05000482/LER-1985-071, :on 851009,control Room Ventilation Isolation Signal Initiated Due to Radiation Monitor in Control Bldg HVAC Sensing Low Voltage Condition.Caused by Lightning Strike.Low Voltage Condition Cleared + (22:54:21, 11 December 2024)
- BSEP-85-1953, Forwards Response to Violations Noted in Insp Repts 50-324/85-33 & 50-325/85-33.Corrective Actions:Auxiliary Operator Disciplined,Personnel Instructed & Valve Lineup Sheet Revised.Insp Repts Contain No Proprietary Info + (22:54:24, 11 December 2024)
- ML20138Q758 + (22:54:27, 11 December 2024)