Text
'
i NIAGARA h!0llAWK POWER CORPORATION NINE blILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of October 1985 with a Unit Availability Factor of 100.0 and a Net Design Electrical Capacity Factor of 94.7.
There were O challenges to Electromatic Relief Valves. Reductions in Capacity Factor were due to load reductions to pull control rods and preconditioning of fuel.
CLASS I WORK - b!ECilANICAL h!AINTENANCE - OCTOBER 1985 hR# 34540 Cond. supply to CRD Pump Filters (50-117) Inspected and c1 caned hR# 34958 Snubber 39-11S13 - inspected and c1 caned hR# 34913 Replaced extension nipple on condensate transfer line to CU System filter aid tank WR# 33909 Rebuilt spare instrument air compressor valves CLASS I KORK - ELECTRICAL b1AINTENANCE - OCTOBER 1985 hR# 34851 Replaced wirenuts with crimp connectors on instrument air compressor #12 hR# 34853 Rebrush b1G 172 as required.
WR# 35115 Inspected and cleaned Limitorque 81-01, Reactor Core Spray hR# 35304 Tightened lower drain plug on core spray pump motor 122.
hR# 35316 Tested relay 27-2 on 162 b!G set.
CLASS I WORK - INSTRUhtENTATION 6 CONTROL - OCTOBER 1985 hR# 34944 Refuel Bridge Radiation blonitor Tripping low (wrote operation procedure to be same as Rad. Prot.)
hR# 34954 APRS! #14 power failure (replaced failed power supply with spare) hR# 34960 Control Room Ventilation Radiation hionitor #11 spiking (spiking caused by off-on cycling of the welding circuit) hR# 34919 Install 10 second time delay circuit on #11 control room vent radiation monitor (verified monitor operation) hR# 35249
- 12 Emergency Condenser level control valve 60-18 fully closing (adjusted air supply regulator to 36 PS1 out) hR# 35243 Condensate transfer pumps #11 and #12 erratic vibration alarms (adjusted setpoints on vibration switches) hR# 35257 Containment spray raw water pump filter AP Indicator needs calibration (calibrated differential switch 93-29) hR# 35270 Emergency Condenser #121 and #122 vent isolation valve operator blowing air - refer to WR# 30855 to maintenance) 8511180291 851031
{DR ADOCK 05000220 i
\\ {
OPERATLNG DATA REPORT DOCKET NO. 50-210 DATE 11/0 85 6 CO%IPLETED BY Tv nnmnn X/
TELEPHONE f3151349-24 2 OPERATING STATUS
- 1. Unit Name:
Nine Mi1e Point Unit I Notes 10/01/85 to 10/31/85
- 2. Reporting Period:
1850
- 3. Licensed Thermal Power (MWt):
640
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
620 630
- 6. Maximum Dependable Capacity (Gross MWe):
610
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cumulatise
- 11. Hours in Reporting Period 745.0 7.296.0 141.360.0
- 12. Number Of Hours Reactor Was Critical 745.0 7,239.0 99,954.7
- 13. Reactor Reserve Shutdow. Hours 0
0 1,204.2
- 14. Hours Generator On4:se 745 7,214.L",
97.019.3._
- 15. Unit Reserve Shutdo"'n Hours 0
0 _
20,a
- 16. Gross Thermal Energy Generated (MWH) 1,363,788.0 13.036.700.0'162.326.150.0
- 17. Gross Electrical Energy Generated (MWH) 451,620.0,,
4,359,765.0 53.740.553.0
- 18. Net Electrical Energy Generated (MWH) 437.403.0 4,227,260.0 52,057,254.0
- 19. Unit Sersice Factor 100.0 98.9 68.6
- 20. Unit Availability Factor 100.0 98.9 68.6
- 21. Unit Capacity Factor (Using MDC Net) 96.2 95.0 60.4
- 22. Unit Capacity FactoriUsing DER Net) 94.7 93.5 59.4
- 23. Unit Forced Outage Rate 0.0 1.1 15.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of t.act.'..
- 25. If Shut Down At End Of Report Period. Estimated Date of L<rtup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION (4/77)
AVER \\GE D AILY UNIT P0hER LEVEL DOCKET NO.
50-220 UNIT 9 blile Pt. #1 DATE 11/5/85
[
CO\\fPLETED !!Y TW Roman (315)349-2[22 TELEPflONE MONTH October 1985 DAY AVERACE DAILY POWER LEVEL,.
DAY AVERACE DAILY POWER LEVEL (MWe Net)
(MWe Net 1 i
589 g7 591 2
588 is 592 3
588 g9 590 4
588 20 597 5
588 593 6
591 3,
R65 1
7 592
- 3 593 8
591 24 593 9
592 25 594 10 588 26 563 11 588 593 12 534
,s 595 13 588 29 588 14 588 30 596 15
$89 33 603 16 591 INSTRUCTIONS On this format.hst the average daily unit power lesel in MWe Net for each day in the re;miting inanth.
the nearest whole megawart.
ar (9177) e e
,ya+
=
y y
i
--_m.
...g y
r ww, y
s 50-220 UNIT SHUTDOWNS AND POWER REDUCIl0NS DOCKET NO.
UNIT NAME 9 Mile Pt. #1 DATE 11/5/85 ( //
REPORT MONTil October 1985 COMPLETED BY Tw nnmn ph/
TELEPHONE rtio 230_,3,4 e.
E c
.! E 3
j i5 Licensee P,
["?
Cause & Correceive D.iie g
3g
(
js5 Event g?
9 Action to jE 5
g;g ReporIa in v j'
Prevent Recurrence H
Q 851012 S
20 11 Load Reduction (89%) to Pull Control Rods 851022 S
11 Load Reduction (90%) to Pull Control Rods 1
851026 S
13 11 Load Reduction (909) to Pull Control 6
Rods 851029 S
11 11 Load Reduction (979.) to Pull Control Rods l
851031 S
10 11 Load Reduction (97?) to Pull Control 6
Rods I
2 3
4 F: Forced Reason:
Method:
Exhibis C-Instructions S. Scheduled A-Equipment Failure (Explain)
I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Reporn (LER) File (NUREG-D-Regulatory Restriction 4-Ot her ( Explain) 0161)
L-Operator Training & License Examination F-Administrative 5
4 G-Operational Enror (Explain)
Exhibit 1 - Same Source (9/77)
Il-Other (E xplain) e O
DIP-15022 NIAGARA MOHAWK POWER CORPORATION NI AGAR A MOHAWK 300 ERIE BOULEV ARD. WEST SYRACUSE.N.Y.13202 October 8, 1985 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn:
Document and Control Desk Re: Docket No. 50-220 DPR-63
Dear Sir:
Submitted herewith is the Report of Operating Statistics and shutdown for October 1985 for the Nine Mile Point Nuclear Station Unit #1.
Also included is a narrative report of Operating Experience for October 1985.
Very truly yours,
[#1 o44-N Thomas E. Lempges Vice President Nuclear Generation TEL/tg Attachments cc: Director, Office of ISE (10 copies) l