i NIAGARA h!0llAWK POWER CORPORATION NINE blILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of October 1985 with a Unit Availability Factor of 100.0 and a Net Design Electrical Capacity Factor of 94.7.

There were O challenges to Electromatic Relief Valves. Reductions in Capacity Factor were due to load reductions to pull control rods and preconditioning of fuel.

CLASS I WORK - b!ECilANICAL h!AINTENANCE - OCTOBER 1985 hR# 34540 Cond. supply to CRD Pump Filters (50-117) Inspected and c1 caned hR# 34958 Snubber 39-11S13 - inspected and c1 caned hR# 34913 Replaced extension nipple on condensate transfer line to CU System filter aid tank WR# 33909 Rebuilt spare instrument air compressor valves CLASS I KORK - ELECTRICAL b1AINTENANCE - OCTOBER 1985 hR# 34851 Replaced wirenuts with crimp connectors on instrument air compressor #12 hR# 34853 Rebrush b1G 172 as required.

WR# 35115 Inspected and cleaned Limitorque 81-01, Reactor Core Spray hR# 35304 Tightened lower drain plug on core spray pump motor 122.

hR# 35316 Tested relay 27-2 on 162 b!G set.

CLASS I WORK - INSTRUhtENTATION 6 CONTROL - OCTOBER 1985 hR# 34944 Refuel Bridge Radiation blonitor Tripping low (wrote operation procedure to be same as Rad. Prot.)

hR# 34954 APRS! #14 power failure (replaced failed power supply with spare) hR# 34960 Control Room Ventilation Radiation hionitor #11 spiking (spiking caused by off-on cycling of the welding circuit) hR# 34919 Install 10 second time delay circuit on #11 control room vent radiation monitor (verified monitor operation) hR# 35249

  1. 12 Emergency Condenser level control valve 60-18 fully closing (adjusted air supply regulator to 36 PS1 out) hR# 35243 Condensate transfer pumps #11 and #12 erratic vibration alarms (adjusted setpoints on vibration switches) hR# 35257 Containment spray raw water pump filter AP Indicator needs calibration (calibrated differential switch 93-29) hR# 35270 Emergency Condenser #121 and #122 vent isolation valve operator blowing air - refer to WR# 30855 to maintenance) 8511180291 851031

{DR ADOCK 05000220 i

PDR

\\ {

OPERATLNG DATA REPORT DOCKET NO. 50-210 DATE 11/0 85 6 CO%IPLETED BY Tv nnmnn X/

TELEPHONE f3151349-24 2 OPERATING STATUS

1. Unit Name:

Nine Mi1e Point Unit I Notes 10/01/85 to 10/31/85

2. Reporting Period:

1850

3. Licensed Thermal Power (MWt):

640

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

620 630

6. Maximum Dependable Capacity (Gross MWe):

610

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted,If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr.-to-Date Cumulatise

11. Hours in Reporting Period 745.0 7.296.0 141.360.0
12. Number Of Hours Reactor Was Critical 745.0 7,239.0 99,954.7
13. Reactor Reserve Shutdow. Hours 0

0 1,204.2

14. Hours Generator On4:se 745 7,214.L",

97.019.3._

15. Unit Reserve Shutdo"'n Hours 0

0 _

20,a

16. Gross Thermal Energy Generated (MWH) 1,363,788.0 13.036.700.0'162.326.150.0
17. Gross Electrical Energy Generated (MWH) 451,620.0,,

4,359,765.0 53.740.553.0

18. Net Electrical Energy Generated (MWH) 437.403.0 4,227,260.0 52,057,254.0
19. Unit Sersice Factor 100.0 98.9 68.6
20. Unit Availability Factor 100.0 98.9 68.6
21. Unit Capacity Factor (Using MDC Net) 96.2 95.0 60.4
22. Unit Capacity FactoriUsing DER Net) 94.7 93.5 59.4
23. Unit Forced Outage Rate 0.0 1.1 15.5
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of t.act.'..
25. If Shut Down At End Of Report Period. Estimated Date of L<rtup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION (4/77)

AVER \\GE D AILY UNIT P0hER LEVEL DOCKET NO.

50-220 UNIT 9 blile Pt. #1 DATE 11/5/85

[

CO\\fPLETED !!Y TW Roman (315)349-2[22 TELEPflONE MONTH October 1985 DAY AVERACE DAILY POWER LEVEL,.

DAY AVERACE DAILY POWER LEVEL (MWe Net)

(MWe Net 1 i

589 g7 591 2

588 is 592 3

588 g9 590 4

588 20 597 5

588 593 6

591 3,

R65 1

7 592

3 593 8

591 24 593 9

592 25 594 10 588 26 563 11 588 593 12 534

,s 595 13 588 29 588 14 588 30 596 15

$89 33 603 16 591 INSTRUCTIONS On this format.hst the average daily unit power lesel in MWe Net for each day in the re;miting inanth.

the nearest whole megawart.

ar (9177) e e

,ya+

=

y y

i

--_m.

...g y

r ww, y

s 50-220 UNIT SHUTDOWNS AND POWER REDUCIl0NS DOCKET NO.

UNIT NAME 9 Mile Pt. #1 DATE 11/5/85 ( //

REPORT MONTil October 1985 COMPLETED BY Tw nnmn ph/

TELEPHONE rtio 230_,3,4 e.

E c

.! E 3

j i5 Licensee P,

["?

Cause & Correceive D.iie g

3g

(

js5 Event g?

9 Action to jE 5

g;g ReporIa in v j'

Prevent Recurrence H

Q 851012 S

20 11 Load Reduction (89%) to Pull Control Rods 851022 S

11 Load Reduction (90%) to Pull Control Rods 1

851026 S

13 11 Load Reduction (909) to Pull Control 6

Rods 851029 S

11 11 Load Reduction (979.) to Pull Control Rods l

851031 S

10 11 Load Reduction (97?) to Pull Control 6

Rods I

2 3

4 F: Forced Reason:

Method:

Exhibis C-Instructions S. Scheduled A-Equipment Failure (Explain)

I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Reporn (LER) File (NUREG-D-Regulatory Restriction 4-Ot her ( Explain) 0161)

L-Operator Training & License Examination F-Administrative 5

4 G-Operational Enror (Explain)

Exhibit 1 - Same Source (9/77)

Il-Other (E xplain) e O

DIP-15022 NIAGARA MOHAWK POWER CORPORATION NI AGAR A MOHAWK 300 ERIE BOULEV ARD. WEST SYRACUSE.N.Y.13202 October 8, 1985 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn:

Document and Control Desk Re: Docket No. 50-220 DPR-63

Dear Sir:

Submitted herewith is the Report of Operating Statistics and shutdown for October 1985 for the Nine Mile Point Nuclear Station Unit #1.

Also included is a narrative report of Operating Experience for October 1985.

Very truly yours,

[#1 o44-N Thomas E. Lempges Vice President Nuclear Generation TEL/tg Attachments cc: Director, Office of ISE (10 copies) l