Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138R118 + (22:49:15, 11 December 2024)
- ML20138R116 + (22:49:16, 11 December 2024)
- ML20138R115 + (22:49:17, 11 December 2024)
- ML20138R114 + (22:49:17, 11 December 2024)
- 05000255/LER-1985-020, :on 851008,discovered That Scheduled Date for Main Steam & Feedwater Sys Hydrostatic Test Exceeded ASME Required Time Interval.Caused by Misinterpretation of Requirements.Review Performed + (22:49:19, 11 December 2024)
- ML20138R112 + (22:49:20, 11 December 2024)
- ML20138R110 + (22:49:21, 11 December 2024)
- ML20138R109 + (22:49:21, 11 December 2024)
- ML20138R106 + (22:49:22, 11 December 2024)
- ML20138R104 + (22:49:24, 11 December 2024)
- ML20138R105 + (22:49:24, 11 December 2024)
- ML20138R103 + (22:49:25, 11 December 2024)
- ML20138R102 + (22:49:25, 11 December 2024)
- ML20138R100 + (22:49:26, 11 December 2024)
- A05307, Responds to Violations Noted in Insp Rept 50-245/85-15. Corrective Actions:Written Procedures Specifying Calibr Requirements Developed,Reviewed & Approved for safety-related Feedwater Coolant Injection Sys + (22:49:27, 11 December 2024)
- ML20138R098 + (22:49:27, 11 December 2024)
- ML20138R097 + (22:49:28, 11 December 2024)
- ML20138R096 + (22:49:29, 11 December 2024)
- 05000325/LER-1985-056, :on 851010,surveillance Test to Verify Slope of APRM Flow Bias Thermal Trip & Upscale Alarm Deemed Inadequate.Caused by Inappropriate Procedural Rev in Oct. Revs for Proper Testing Planned + (22:49:30, 11 December 2024)
- ML20138R092 + (22:49:32, 11 December 2024)
- ML20138R089 + (22:49:32, 11 December 2024)
- ML20138R087 + (22:49:33, 11 December 2024)
- ML20138R086 + (22:49:34, 11 December 2024)
- ML20138R084 + (22:49:35, 11 December 2024)
- ML20138R085 + (22:49:35, 11 December 2024)
- ML20138R083 + (22:49:36, 11 December 2024)
- ML20138R080 + (22:49:37, 11 December 2024)
- ML20138R081 + (22:49:37, 11 December 2024)
- ML20138R079 + (22:49:38, 11 December 2024)
- IR 05000456/1985033 + (22:49:40, 11 December 2024)
- ML20138R075 + (22:49:40, 11 December 2024)
- ML20138R073 + (22:49:41, 11 December 2024)
- ML20138R072 + (22:49:42, 11 December 2024)
- ML20138R071 + (22:49:42, 11 December 2024)
- ML20138R070 + (22:49:43, 11 December 2024)
- ML20138R067 + (22:49:44, 11 December 2024)
- ML20138R069 + (22:49:44, 11 December 2024)
- ML20138R066 + (22:49:45, 11 December 2024)
- ML20138R064 + (22:49:46, 11 December 2024)
- ML20138R062 + (22:49:47, 11 December 2024)
- PNO-II-85-107, on 851107,plant Taken out-of-svc After Verification of Turbine High Bearing Temp.Caused by Main Turbine Bearing Failure.Plant Expected to Be Shut Down for 5 to 14 Days for Repairs + (22:49:47, 11 December 2024)
- ML20138R061 + (22:49:48, 11 December 2024)
- ML20138R060 + (22:49:48, 11 December 2024)
- ML20138R059 + (22:49:49, 11 December 2024)
- ML20138R058 + (22:49:50, 11 December 2024)
- JAFP-85-0781, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-333/85-13.Corrective Actions:Procedures for Plant Drawing Control & Control of Vendor Technical Manuals Will Be Issued by 851031.Drawing Update Procedure Modified + (22:49:51, 11 December 2024)
- ML20138R056 + (22:49:51, 11 December 2024)
- ML20138R055 + (22:49:52, 11 December 2024)
- ML20138R052 + (22:49:52, 11 December 2024)
- ML20138R051 + (22:49:53, 11 December 2024)
- ML20138R050 + (22:49:54, 11 December 2024)