ML20138R060

From kanterella
Jump to navigation Jump to search
Withdraws 851114 Application to Amend License NPF-4, Authorizing 10CFR50.12(a),App R Schedular Exemption. Pressurizer PORV Isolation,Item I.6 Mod Completed on Schedule During Unit Outage
ML20138R060
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/23/1985
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
References
85-723B, NUDOCS 8512300298
Download: ML20138R060 (2)


Text

-_

i o

VINGINIA ELECTRIC AND PownH CoMI*ANY RicaMoxo,VrunixrA 20261 W, L. Stawaar Vars Pasuinant NUCLEAn opunavsons December 23, 1985 Mr. Harold R. Denton, Director Serial No.: 85-723B Office of Nuclear Reactor Regulation N0/DAS:vlh

' Attn:

Mr. Lester S. Rubenstein, Director Docket No.: 50-338 PWR Project Directorate #2 License No.:NPF-4 Division of PWR Licensing - A U. S.

Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1 APPENDIX "R" FIRE PROTECTION MODIFICATIONS STATUS OF SCHEDULE EXEMPTION ITEMS In Virginia Electric and-Power Company letter, Serial No. 431A, dated September 14, 1984, we requested a schedular exemption pursuant to 10CFR50.12(a) regarding Appendix "R"

modifications.

In a subsequent letter, Serial No. 85-723A dated November 14, 1985, we identified one modification, Pressurizer PORV Isolation, Item I.6, which was not expected to be completed as intended during the present Unit i refueling outage due to a seismic qualification concern with a position switch.

Accordingly, we amended our schedular exemption request to extend the completion date for this item.

This letter is to notify you that the pressurizer PORV modification, Item I.6, was completed during the Unit 1 outage. NRC review of our Appendix "R" schedular exemption request amendment dated November 14, 1985 is no longer necessary and is hereby withdrawn.

If you have any questions or need additional information, please contact us.

Very truly yours, h ( W. L. Stewart loch 8Bh*So$i!SEo'ohe I 1 (0 F

~

5

. {l\\.

h

^

e VaaorwrA ELECTRIC AND Powza COMPANY TO

.i

-s

\\,;

i gN

~

.s h

y cc:

Dr. J. Nelson Grace Regional'Idministrator A'

Region IIs m

Mr. T. E. Conlon NRC Region II Mr. M. Branch fd

^

NRC Resident Inspect $r, North Anna Power Statio'n 1

\\

^

~

r y,

4.

g

,s r

s, i

/

I f

j

. x

. d.

m L.

t y v.A h

Y

+

p-e U

-d, r

~

D 4

g

%g

.h s