Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-II-97-033, on 970614,extended Shutdown Due to Steady Increases Detected in SG 2A Primary to Secondary Tube Leakage.Nrc Resident Inspector Will Followup on Licensee Shutdown & Recovery Activities + (21:25:43, 11 December 2024)
- ML20140G420 + (21:25:44, 11 December 2024)
- BSEP-97-0156, Forwards Rev 15 to UFSAR for Brunswick Steam Electric Plant, Units 1 & 2 + (21:25:45, 11 December 2024)
- IR 05000219/1997001 + (21:25:46, 11 December 2024)
- ML20140G413 + (21:25:46, 11 December 2024)
- ML20140G410 + (21:25:47, 11 December 2024)
- ML20140G406 + (21:25:48, 11 December 2024)
- NSD-NRC-97-5107, Forward Rev 12 to GW-GL-021, AP600 SSAR (Vols 1-11). Revised Tables of Contents,Change Page Instructions,List of Effective Pages,Document Cover Sheet & Change Roadmap Outlining Changes in Section Also Encl + (21:25:50, 11 December 2024)
- ML20140G384 + (21:25:53, 11 December 2024)
- ML20140G383 + (21:25:54, 11 December 2024)
- ML20140G381 + (21:25:54, 11 December 2024)
- ML20140G379 + (21:25:55, 11 December 2024)
- ML20140G377 + (21:25:56, 11 December 2024)
- ML20140G374 + (21:25:57, 11 December 2024)
- 05000346/LER-1985-007, :on 850323,auxiliary Feedwater Pump Did Not Meet 40 Response Time Requirement.Caused by Rate at Which Turbine Accelerated to Full Speed of 3,600 Rpm.Internal Speed Setting Bushing Replaced + (21:26:00, 11 December 2024)
- ML20140G372 + (21:26:01, 11 December 2024)
- ML20140G370 + (21:26:05, 11 December 2024)
- ML20140G369 + (21:26:05, 11 December 2024)
- ML20140G367 + (21:26:07, 11 December 2024)
- ML20140G368 + (21:26:07, 11 December 2024)
- ML20140G366 + (21:26:08, 11 December 2024)
- ML20140G364 + (21:26:08, 11 December 2024)
- ML20140G363 + (21:26:09, 11 December 2024)
- ML20140G362 + (21:26:10, 11 December 2024)
- ML20140G361 + (21:26:10, 11 December 2024)
- ML20140G360 + (21:26:11, 11 December 2024)
- CY-97-058, Responds to NRC Re Violations Noted in Insp Rept 50-213/97-01.Corrective Actions:Counseled Individuals on Importance of Never Operating Red Tagged Equipment & Wrote Temporary Procedure Change to Wcm 2.1-2, Tr/Job Scoping + (21:26:12, 11 December 2024)
- ML20140G356 + (21:26:15, 11 December 2024)
- ML20140G354 + (21:26:16, 11 December 2024)
- ML20140G355 + (21:26:16, 11 December 2024)
- ML20140G350 + (21:26:17, 11 December 2024)
- ML20140G348 + (21:26:18, 11 December 2024)
- ML20140G349 + (21:26:18, 11 December 2024)
- ML20140G347 + (21:26:19, 11 December 2024)
- HL-5418, Requests That Due Date of RAI Re SFP Regulatory Analysis Be Extended to 970623 + (21:26:20, 11 December 2024)
- ML20140G345 + (21:26:20, 11 December 2024)
- ML20140G343 + (21:26:21, 11 December 2024)
- ML20140G341 + (21:26:22, 11 December 2024)
- ML20140G339 + (21:26:22, 11 December 2024)
- PNO-V-85-038, on 850626,press Conference Held to Announce That Nine People Charged W/Felony Sale of Drugs Offsite as Result of 8 Months Undercover Drug Investigation.No Licensee Employees Charged + (21:26:23, 11 December 2024)
- ML20140G336 + (21:26:23, 11 December 2024)
- ML20140G333 + (21:26:26, 11 December 2024)
- ML20140G331 + (21:26:27, 11 December 2024)
- ML20140G330 + (21:26:27, 11 December 2024)
- ML20140G329 + (21:26:28, 11 December 2024)
- 05000327/LER-1985-025, :on 850601,noble Gas Sample Not Taken at Required Frequency.Caused by Analyst Failure to Collect Sample Every 8 H.Analyst Counseled & Sample Taken + (21:26:30, 11 December 2024)
- ML20140G326 + (21:26:31, 11 December 2024)
- ML20140G325 + (21:26:31, 11 December 2024)
- ML20140G323 + (21:26:32, 11 December 2024)
- ML20140G324 + (21:26:32, 11 December 2024)
- ML20140G320 + (21:26:33, 11 December 2024)